Tender Value
₹57.0 L
EMD Value
₹1.1 L
Closing Date
24 Mar 2026, 3:00 pmClosed
Vijayawada Division: Additions and alterations to OHE in connection with "Replacement of corroded, over aged girders and Bridges which have exceeded their fatigue life with new girders" in BZA division.
B-29-TRD-TNDR-44-25-26~SCR
B-29-TRD-TNDR-44-25-26
Open
Works - General
12 Months
Ntr, Andhra Pradesh
₹0
₹1.1 L
24 Mar 2026
19 Feb 2026
10 Mar 2026
A2-FOUNADATION ITEMS (incl. Supply & Erection) 595335.00 Below/P
Item Breakup - A1-(OHE & PSI Items)
ERECTION/LABOUR Total 20708.00 Item- 2 3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 31185.00 Item- 3 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS). S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 152670.00 Item- 4 3(e) Supply and Erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 31353.00 Item- 5 4(a)(i)Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 382626.00 8(a)(v)Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 6 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 447498.00 8(a)(xii) Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA Item- 7 locations. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 1110.00 Item- 8 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 55926.00 Item- 9 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 25700.00 Item- 10 16(a) Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 73905.00 VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 11 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 59599.00 Item- 12 16(b)Supply and Erection of Longitudinal Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 200184.00 Item- 13 16(c) Supply and Erection of Transverse & Special Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 22986.00 Item- 14 17(a)Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 58296.00 Item- 15 17(b) Supply and Erection of Earth Bus. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 15780.00 31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 16 Cantilever Assembly from old Mast or Support. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 46750.00 Item- 17 31(g)Slewing and Putting back of OHE in original position S No. Item Description of Item Unit Qty Rate Amount No
Each ERECTION/LABOUR Span Total 50292.00 Item- 18 31(j)(ii) Dismantling of Cut-in Insulator S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 4123.00 Item- 19 31(k)(i) Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 21434.00 Item- 20 31 l(i)Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 46080.00 31(t)(i) Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly Item- 21 for Conventional OHE. VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 10168.00 Item- 22 31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3090.00 Item- 23 31(t)(ix) Re-adjustment of OHE Spans, including droppers S No. Item Description of Item Unit Qty Rate Amount No
Each ERECTION/ LABOUR Span Total 35008.00 Item- 24 31(t) (x)Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 4930.00 32/3 (a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations Item- 25 under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 31185.00 Item- 26 32/ 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 152670.00 Item- 27 32/3(e) Erection of Guy Rod Assembly under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3360.00 Item- 28 32/4(a)(i) Erection of Single Cantilever Assembly for Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 31320.00 32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE Item- 29 under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 24000.00 Item- 30 32/8(b) (ii)Erection of Materials for Termination of Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 6720.00 Item- 31 32/11(a)(i)Erection of 25 kV Solid Core Cut-in Insulator under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 7110.00 32/31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal Item- 32 of Cantilever Assembly from old Mast or Support under power block. VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 46750.00 Item- 33 32/31 (g)Slewing and Putting back of OHE in original position under power block. S No. Item Description of Item Unit Qty Rate Amount No
Each ERECTION/LABOUR Span Total 50292.00 Item- 34 32/31(j)(ii) Dismantling of Cut-in Insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 4123.00 Item- 35 32/31 (k)(i)Dismantlement of OHE Mast or structure by cutting under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 21434.00 32/31 l(i)Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc under power Item- 36 block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 46080.00 32/31(t)(i) Dismantling of a Regulating Equipment (Three-pulley type) with counter weight Item- 37 assembly for Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 10168.00 32/ 31(t)(v)Dismantling of Termination for Conventional type Overhead Equipment under power Item- 38 block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 3090.00 Item- 39 32/31(t) (ix)Re-adjustment of OHE Spans, including droppers under power block. S No. Item Description of Item Unit Qty Rate Amount No
Each ERECTION/LABOUR Span Total 35008.00
Item Breakup - A2-FOUNADATION ITEMS (incl. Supply & Erection)
MATERIAL/ERECTION Total 595335.00
Item Breakup - B1-STEEL SUPPLY
SUPPLY /MATERIAL Total 1189566.00 Item- 42 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts. VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 1082960.00 3(cs)Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 43 Portals. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 294512.00
Item Breakup - B3-INSULATOR SUPPLY
SUPPLY/MATERIAL Total 181395.00 8(bx)Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b)(ix)/9(a)/9(b)/ Item- 45 9(c)/9(d)/11(a)(i)/11(a)(ii). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 66320.00
Item Breakup - C1-GENERAL ITEMS
SUPPLY/MATERIAL Total 17608.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS7.pdf
ATTACHMENT
ACS8.pdf
ATTACHMENT
ACS9.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
ACS12022_CE-I_CT_GCC-2022Policy14.07.20223.pdf
ATTACHMENT
ACS2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.2022.pdf
ATTACHMENT
ACS32023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3.pdf
ATTACHMENT
ACS4toGCC.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
ACS6GCC.pdf
ATTACHMENT
MASTERDOCUMENT-1.pdf
ATTACHMENT
MASTERDOCUMENT-2T-4425-26.pdf
ATTACHMENT
PRICESCHEDULET-4425-26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].