Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-Finance | L1 | Accepted-Finance First Lowest | |
| 2 | L2₹14.1 L+₹70,200 (5.24%)Accepted-Finance VILL SHASPAR WWAKHAN DANYA AMORA 263623 U K | ALMORA | UTTARAKHAND | 263623 | L2 | Accepted-Finance Second Lowest | |
| 3 | L3₹14.2 L+₹78,500 (5.86%)Accepted-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | L3 | Accepted-Finance Third Lowest | |
| 4 | L4₹14.4 L+₹96,400 (7.20%)Accepted-Finance | L4 | Accepted-Finance Forth Lowest |
Tender Value
₹1,180
EMD Value
₹42,500
Closing Date
7 Aug 2023, 1:00 pmClosed
Executive Engineer
Electricity Distribution Division Champawat
Annual maintenance work of 11 KV Block and Kwerala feeder from 33KV Substation Champawat
2023_UPCL3_61451_1
31/EDD(C)/2023-24
Open Tender
Manpower Supply
Fixed-rate
180 days
EDSD Champawat
Annual maintenance work of 11 KV Block and Kwerala feeder from 33KV Substation Champawat
3 documents required · 3 mandatory
₹1,180
Yes
EE UPCL
₹42,500
Yes
8 Aug 2023
28 Jul 2023
7 Aug 2023
28 Jul 2023
7 Aug 2023
28 Jul 2023
Amount
Annual Maintenance work of 11 KV line, LT line and DTRs in 11 KV line, LT lines. Attend breakdowns replacements of blown HT/LT fuses tightening of HT/LT side jumpers, earthing 11 KV TPMO etc.and cleaning of substations and all associated works to keep these lines and 11/.0.4 KV substations in healthy and operating condition to cater power supply to consumers connected with system for one year.As per site condition 6 no. of trained staff should be deployed to execute above work. Details of infrastructure as below:- Total No. of Consumers 1934 Nos B) 11 KV Lines i) 11 KV Block Feeder 14.00 Km. ii) 11 KV Kwerala feeder 17.00 Km. Total Length of 11 KV lines 31.00 Km. C) L.T.Lines i) 11 KV Block Feeder 25.00 Km. Total Length of LT lines 31.00 Km. Release of New L&F connection in the villages.connected will above outgoing feeder.( 40 No./month) Disconnection and Reconnection of defaulter consumers in the area.connected with above outgoing feeder. (45 No./Month)
Capacitywise connected distribution T/Fs in EDSD Champawat. Maintanance ie. Replacement of blown HT/LT fuse,tightening of HT/LT side jumpers,earthing, 11 KV TPMO etc. and cleaning of substations under section Champawat (Rural) Capacity Qty 5% of T/Fs 16 KVA- 03 01
250 KVA- 06 01 Total 45 (5 % of total installed T/F ie. 45 No.T/F per year repaired and replacement, T/F will not be provided by the department) Note:- If damage rate found more than 5 % than these T/F will be repaired and replaced by contractor at his own cost and T/F will be not provided by department UPCL
M/s Purnagiri Electricals
Saun Engineering and Construction Co P Ltd
vijay electricals
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_74492.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .