Loading…
Loading…
Tender Value
₹32.8 L
EMD Value
₹82,072
Closing Date
27 Aug 2026, 5:00 pmClosed
SRI DURGA MALLESWARA SWAMY VARLA DEVASTHANAM, INDRAKEELADRI, VIJAYAWADA
VIJAYAWADA
HIRE CHARGES FOR PROVIDING TEMPORARY ILLUMINATION AT ARJUN STREET KANAKADURGANAGAR PRASADAM PREPARATION and COUNTERS GRAMOTSAVAM DURING DASARA - 2026
978477
NIT No.08/EE/2026-27 Dt.17/08/2026
OPEN - NCB
Electrical Works
NTR, ANDHRA PRADESH
8 documents required · 8 mandatory
₹1,163
₹82,072
20 Aug 2026
20 Aug 2026
20 Aug 2026
Hire charges for Temporary illumination, consisting of 20W LED tube light complete with required switchgears with continuous earth wire duly erected and dismantled with required scaffolding including cost and conveyance of all materials and labour charges etc., complete for one day.( For 1st day)
Hire charges for Temporary illumination, consisting of 20W LED tube light complete with required switchgears with continuous earth wire duly erected and dismantled with required scaffolding including cost and conveyance of all materials and labour charges etc., complete for one day.(For 2nd to 3rd day)
Hire charges for Temporary illumination, consisting of 20W LED tube light complete with required switchgears with continuous earth wire duly erected and dismantled with required scaffolding including cost and conveyance of all materials and labour charges etc., complete for one day(For 4th to 15th day)
Hire charges for supply and maintaining of oscillating type pedestal fan 16" (400 mm) or ceiling fan connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day.(For 1st day)
Hire charges for supply and maintaining of oscillating type pedestal fan 16" (400 mm) or ceiling fan connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day. (For 2nd to 3rd day)
Hire charges for supply and maintaining of oscillating type pedestal fan 16" (400 mm) or ceiling fan connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day. (For 4th to 15th day)
Hire chages for Supply and erection of MS Single pole structure of 20’ (6.00 Mtrs.) with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings etc., and dismantling and cost and conveyance of all materials and all labour charges complete for one day..(For 1st day)
Hire chages for Supply and erection of MS Single pole structure of 20’ (6.00 Mtrs.) with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings etc., and dismantling and cost and conveyance of all materials and all labour charges complete for one day.(For 2nd to 3rd day)
Hire chages for Supply and erection of MS Single pole structure of 20’ (6.00 Mtrs.) with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings etc., and dismantling and cost and conveyance of all materials and all labour charges complete for one day.(For 4th to 13th day)
Hire charges for Supply and erection of 4 pole structure of 4 of 25' (7.50 Mtrs.) GI pipe of 63/80mm dia with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings with suitable earthing arrangements and dismantling and cost and conveyance of all materials and all labour charges complete for one day(For 1st day)
Hire charges for Supply and erection of 4 pole structure of 4 of 25' (7.50 Mtrs.) GI pipe of 63/80mm dia with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings with suitable earthing arrangements and dismantling and cost and conveyance of all materials and all labour charges complete for one day(For 2nd to 3rd day)
Hire charges for Supply and erection of 4 pole structure of 4 of 25' (7.50 Mtrs.) GI pipe of 63/80mm dia with necessary cross arms and hardware materials for fixing halogen / Metal halide fittings with suitable earthing arrangements and dismantling and cost and conveyance of all materials and all labour charges complete for one day(For 4th to 13th day)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 1st day)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 2nd to 3rd day)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 4th to 15th day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(For 1st day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(2nd and 3rd day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(For 4th to 13th day)
Hire charges for supplying and maintaining 125KVA 415V 50 cycles A.C. Generating set with acoustic enclosure as per IS Specification with DCM 4-Wheeler Vehicle with all standard accessories such as control panel, batteries etc. complete excluding cost of fuel, for one day.(For 1st day)
Hire charges for supplying and maintaining 125KVA 415V 50 cycles A.C. Generating set with acoustic enclosure as per IS Specification with DCM 4-Wheeler Vehicle with all standard accessories such as control panel, batteries etc. complete excluding cost of fuel, for one day.(For 2nd to 8th day)
Hire charges for supplying and maintaining 125KVA 415V 50 cycles A.C. Generating set with acoustic enclosure as per IS Specification with DCM 4-Wheeler Vehicle with all standard accessories such as control panel, batteries etc. complete excluding cost of fuel, for one day.(For 9th to 15th day)
Hire charges for supply and installing and maintaining towards supply and run of 50Sq mm to 95 Sq.mm x 31/2 core cable / 4 of single core 50Sq mm to 95Sq mm cable with necessary terminations etc. complete for one day.(For 1st day)
Hire charges for supply and installing and maintaining towards supply and run of 50Sq mm to 95 Sq.mm x 31/2 core cable / 4 of single core 50Sq mm to 95Sq mm cable with necessary terminations etc. complete for one day.(2nd and 3rd day)
Hire charges for supply and installing and maintaining towards supply and run of 50Sq mm to 95 Sq.mm x 31/2 core cable / 4 of single core 50Sq mm to 95Sq mm cable with necessary terminations etc. complete for one day..(For 4th to 13th day)
Hire charges for supply and installing and maintaining towards supply and run of 1 of 6/10 Sq.mm WPTC / 2 of WPSC / VIR cable with necessary terminations etc. complete for one day. (For 1st day)
Hire charges for supply and installing and maintaining towards supply and run of 1 of 6/10 Sq.mm WPTC / 2 of WPSC / VIR cable with necessary terminations etc. complete (For 2nd to 3rd day)
Hire charges for supply and installing and maintaining towards supply and run of 1 of 6/10 Sq.mm WPTC / 2 of WPSC / VIR cable with necessary terminations etc. complete. (For 4th to 13th day)
Hire charges for supply and maintaining towards P.V.C pipe 25mm 1.8 mm thickness with junction boxes ,elbowes,bends including with run of cable with necessory terminatrions etc., complete for one day.(For 1st day)
Hire charges for supply and maintaining towards P.V.C pipe 25mm 1.8 mm thickness with junction boxes ,elbowes,bends including with run of cable with necessory terminatrions etc., complete (For 2nd to 3rd day)
Hire charges for supply and maintaining towards P.V.C pipe 25mm 1.8 mm thickness with junction boxes ,elbowes,bends including with run of cable with necessory terminatrions etc., complete (For 4th to 13th day)
Hire charges for temporary illumination consisting LED,RGB pixel series lights with miniature lamps of 8mm LED lights with required wire leads erected and dismantled including required scaffolding and T&P including cost and conveyance of all materials and all labour charges etc., complete for one day.(For 1st day)
Hire charges for temporary illumination consisting LED,RGB pixel series lights with miniature lamps of 8mm LED lights with required wire leads erected and dismantled including required scaffolding and T&P including cost and conveyance of all materials and all labour charges etc., complete for one day. (For 2nd to 3rd day)
Hire charges for temporary illumination consisting LED,RGB pixel series lights with miniature lamps of 8mm LED lights with required wire leads erected and dismantled including required scaffolding and T&P including cost and conveyance of all materials and all labour charges etc., complete for one day. (For 4th to 13th day)
Hire charges for providing LED Design boards / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly with required scaffolding / as directed during execution and giving necessary connection. (Note:The rate should be inclussive of transportation, erection, testing and removing charges etc) (For 1st day)
Hire charges for providing LED Design boards / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly with required scaffolding / as directed during execution and giving necessary connection. (Note:The rate should be inclussive of transportation, erection, testing and removing charges etc) (2nd and 3rd day)
Hire charges for providing LED Design boards / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly with required scaffolding / as directed during execution and giving necessary connection. (Note:The rate should be inclussive of transportation, erection, testing and removing charges etc) (For 4th to 13th day)
Hire charges for providing 1.1KW,24500 m3/Hr Air cooler and required materials with necessary mains switch gear with continues earth lead during function duly removing including cost and conveyance of all materials and labour charges etc., complete for one day. (For 1st day)
Hire charges for providing 1.1KW,24500 m3/Hr Air cooler and required materials with necessary mains switch gear with continues earth lead during function duly removing including cost and conveyance of all materials and labour charges etc., complete for one day. (2nd and 3rd day)
Hire charges for providing 1.1KW,24500 m3/Hr Air cooler and required materials with necessary mains switch gear with continues earth lead during function duly removing including cost and conveyance of all materials and labour charges etc., complete for one day..(For 4th to 13th day)
Hire charges for supply and maintaining of plug points with 16A/6A 5 Pin socket and switch with necessary mains, required switchgears and continuous earth connection for one day. (For 1st day)
Hire charges for supply and maintaining of plug points with 16A/6A 5 Pin socket and switch with necessary mains, required switchgears and continuous earth connection for one day. (2nd and 3rd day)
Hire charges for supply and maintaining of plug points with 16A/6A 5 Pin socket and switch with necessary mains, required switchgears and continuous earth connection for one day. (For 4th to 13th day)
Hire charges for supply and maintaining of heavy duty exhaust fan 18" or 24” connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day. (For 1st day)
Hire charges for supply and maintaining of heavy duty exhaust fan 18" or 24” connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day. (2nd and 3rd day)
Hire charges for supply and maintaining of heavy duty exhaust fan 18" or 24” connected with necessary mains, required switchgears with continuous earthing maintaining the same during the function and including dismantling for one day. (For 4th to 13th day)
Hire charges for Supply & Fixing of Distribution board of load main board consisting of 250A MCCB 4 pole with Busbar arrangement and 12 Nos 63A fuse units as outgoing including conveyance of all materials and all labour charges etc., complete for one day. (For 1st day)
Hire charges for Supply & Fixing of Distribution board of load main board consisting of 250A MCCB 4 pole with Busbar arrangement and 12 Nos 63A fuse units as outgoing including conveyance of all materials and all labour charges etc., complete for one day. (2nd and 3rd day)
Hire charges for Supply & Fixing of Distribution board of load main board consisting of 250A MCCB 4 pole with Busbar arrangement and 12 Nos 63A fuse units as outgoing including conveyance of all materials and all labour charges etc., complete for one day. (For 4th to 13th day)
Hire charges for supply and maintaining towards supply and fixing of 200A 4 pole Changeover / TPN switches including erection and dismantling and cost and conveyance of all materials and labour charges complete for one day.(For 1st day)
Hire charges for supply and maintaining towards supply and fixing of 200A 4 pole Changeover / TPN switches including erection and dismantling and cost and conveyance of all materials and labour charges complete for one day.(2nd and 3rd day)
Hire charges for supply and maintaining towards supply and fixing of 200A 4 pole Changeover / TPN switches including erection and dismantling and cost and conveyance of all materials and labour charges complete for one day.(For 4th to 13th day)
Supply of semi skilled electricians for electrical maintenance works for 13 days
Gramotsavam(10 Days)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 1st day)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 2nd to 3rd day)
Hire charges for providing temporary illumination consisting of flood light fitting 100/120 W complete LED fitting with lamp, complete required switchgear erected and dismantled with using scaffolding for one day.(For 4th to 10th day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(For 1st day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(2nd and 3rd day)
Hire charges for Temporary illumination, consisting of 54 W LED RGB Parcan light fitting non integral,weather proof die cast alluminium housing with IP66 protection with control gear box, conrol gear with required cables, holder, mains duly errected with required scaffolding and dismantled on exising poles including cost and conveyance of all materials and labour charges etc., complete for one day.(For 4th to 10th day)
Hire charges for supply and maintaining 15 to 30 KVA, 415 voltage, 50 C/s AC generating set with all standard accessories such as control panel, batteries etc complete for one day excluding cost of fuel. (For 1st day)
Hire charges for supply and maintaining 15 to 30 KVA, 415 voltage, 50 C/s AC generating set with all standard accessories such as control panel, batteries etc complete for one day excluding cost of fuel.(From 2nd to 8th day)
Hire charges for supply and maintaining 15 to 30 KVA, 415 voltage, 50 C/s AC generating set with all standard accessories such as control panel, batteries etc complete for one day excluding cost of fuel.(From 9th day to 10th day)
Hire charges for Temporary illumination consisting of Sharpie Beam Gobo LED light complete with required wire leads duly erected and dismantled with scaffolding including cost and conveyance of all materials and labour charges etc.,complete as directed by Engineer Incharge. (For 1st day)
Hire charges for Temporary illumination consisting of Sharpie Beam Gobo LED light complete with required wire leads duly erected and dismantled with scaffolding including cost and conveyance of all materials and labour charges etc.,complete as directed by Engineer Incharge.(2nd and 3rd day)
Hire charges for Temporary illumination consisting of Sharpie Beam Gobo LED light complete with required wire leads duly erected and dismantled with scaffolding including cost and conveyance of all materials and labour charges etc.,complete as directed by Engineer Incharge.(For 4th to10th day)
Hire charges for TATA ACE vehicle excluding cost of fuel for 10 days
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
illumination boq Arjun street.xls
TENDER_DOCUMENT • 0.07 MB
BId - illumination Arjun street Dasara-2026.doc
TENDER_DOCUMENT • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .