| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.9 CrAccepted-AOC | ₹85.9 Cr | L1 | Accepted-AOC LoA |
| 2 | L2₹92.7 CrRejected-Finance | ₹92.7 Cr | L2 | Rejected-Finance Not a lowest bidder |
| 3 | L3₹93.9 CrRejected-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹93.9 Cr | L3 | Rejected-Finance Not a lowest bidder |
| 4 | L4₹102.6 CrRejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹102.6 Cr | L4 | Rejected-Finance Not a lowest bidder |
| 5 | L5₹108.3 CrRejected-Finance PLOT NO B 1 INFOCITY SECTOR 34 GURGAON HARYANA 122004 | GURUGRAM | HARYANA | 122004 | ₹108.3 Cr | L5 | Rejected-Finance Not a lowest bidder |
Tender Value
Refer Docs
EMD Value
₹89.5 L
Closing Date
10 May 2021, 5:00 pmClosed
MANAGING DIRECTOR
THE MANAGING DIRECTOR Ground Floor, Unnati Bhawan, H.B. Colony, Satyanagar, Bhubaneswar-751007, Odisha, India (0674) 2391444
Improvement of water supply to provide safe and clean drinking water conforming to drink from tap quality to Rourkela on Engineering Procurement and Construction (EPC) Contract Including Operation and Maintenance for a Period of Three Years
2021_WATCO_65679_1
WATCO (W)-15(9)/ 2020-21 Dt.19.01.2021
National Competitive Bid
Civil Works - Water Works
730 days
Rourkela
Please refer Tender documents.
3 documents required · 3 mandatory
₹35,400
Managing Director, WATCO, Bhubaneswar
₹89.5 L
Yes
Bhubaneswar
23 Aug 2021
27 Jan 2021
17 May 2021
27 Jan 2021
10 May 2021
27 Jan 2021
27 Jan 2021 - 15 Feb 2021
19 Feb 2021
Amount
Construction Work: Design, Construction, Supply, Installation, Testing and Commissioning of the Work “Improvement of Water Supply to provide safe & clean drinking water conforming to drink from tap quality to Rourkela on Engineering, Procurement & Construction (EPC) Contract Including Operation & Maintenance for a Period of Three Years all complete as per terms, conditions, scope of work and technical specification stipulated in Draft Agreement and as per conditions of RFP Document. The offer price is to be submitted in accordance with the bidding documents and the agreement in Appendix-IB (Letter Comprising the Financial Bid).
Operation & Maintenance (excluding energy charge): Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 1st Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 2nd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of operation and maintenance of the above water supply systems as per scope in the RFP & Agreement during 3rd Year including the cost of maintenance of civil, electrical, mechanical, instrumentation, control & automation units, cost of manpower, POL, chemicals, consumables and spares etc. (but excluding the cost of energy) all complete as per terms & conditions, scope of work and specification stipulated in the draft agreement.
Energy Charges for Operation & Maintenance: Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Zonal Pumping Stations, etc.) during 1st year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Zonal Pumping Stations, etc.) during 2nd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
Cost of energy (Calculated @ Rs.7/KWH considering the rated capacity of electrical installations of Intake, WTP, Zonal Pumping Stations, etc.) during 3rd year of operation & maintenance of the above water supply systems as per the terms & conditions, scope of work and specification stipulated in the draft agreement.
RAJKAMAL BUILDERS INFRASTRUTURE PVT. LTD.
M/s. BALAJI CONSTRUCTION COMPANY
Blue Star Limited
Subhash Infraengineers Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid