Loading…
Loading…
Tender ID
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
17 Mar 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
SR to Circuit House Mandvi Ta. Mandvi (Providing Waterproofing Work) (KCH/SR/ NR/2024-25/09)
284524
96 For 2025-26
Open
Repair and Maintenance
Works
Kutch
10 documents required · 10 mandatory
₹900
Executive Engineer, R and B Division, Bhuj
₹9,000
10 Mar 2026
10 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
Name of work :-
SR to Circuit House Mandvi Ta. Mandvi (Providing Waterproofing Work)
(KCH/SR/NR/2024-25/09)
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
1 933.73 Dismentaling tiled of stone floors 49.12 Rupees Forty Smt.
laid in mortar including stacking of Nine And Paise
serviceable materilas and disposal Twelve Only
of unserviceable materials with all
2 933.73 Providing and laying broken chine 779.70 Rupees Seven Smt.
mosaic flooring for terrace using 12 Hundred
mm to 20 mm broken pieces of Seventy Nine
glazed tiles to be laid over cement And Paise
mortar 1:3 to plain or slope and to Seventy Only
be tempered to bring mortar creme
out upto surface using white
cement including rounding off
junctions and extending them upto
15 cm along the wall,clearing with
water and oxalic acid etc. as
3 4000.00 Providing erecting and fixing double 3.95 Rupees Three Ltr.
coated ISI water tank of required And Paise
capacity each with all necessary Ninety Five
fittings and connection etc. Only
complete on terrace
4 132.00 Providing 15mm thick cement 180.40 Rupees One Smt.
plaster in single coat on Rough Hundred
(Similar)side of single or half brick Eighty And
walls for interior plastering upto Paise Forty
floor two level and finished even Only
and smooth in (i) Cement mortar
1:3 (1-cement:3-sand)
5 132.00 Finishing wall with water proofing 60.80 Rupees Sixty Smt.
cement paint of on wall surfaces And Paise
(Two coats) to give an approved Eighty Only
brand and manufacture and of
required shape even shade after
thoroughly brushing the surface to
remove all dirt and remains of loose
powered materials.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
6 5.00 Provding C.I. 100mm diameter 912.40 Rupees Nine Nos.
water spouts including necessary Hundred
iron gratings as per drawings. Twelve And
7 15.00 Providing laying and jointing in 195.67 Rupees One Rmt
true line and level 50mm dia. Hundred
U.P.V.C. Pipe ( SCH- 40) for cold Ninety Five
water including fittings as approved And Paise Sixty
by Engineer In Charge. Pipe shall Seven Only
be fixed on the wall with the help of
clamp at every two metre C/C or
shall be concealed as directed
including necessary fittings etc.
including testing of pipe and joints
and fixing the same with adhesive
solvent, including cost of all
8 35.00 Providing laying and jointing in 91.84 Rupees Ninety Rmt
true line and level 25mm dia. One And Paise
U.P.V.C. Pipe ( SCH- 40) for cold Eighty Four
water including fittings as approved Only
by Engineer In Charge. Pipe shall
be fixed on the wall with the help of
clamp at every two metre C/C or
shall be concealed as directed
including necessary fittings etc.
including testing of pipe and joints
and fixing the same with adhesive
solvent, including cost of all
Rupees Eight Lakh(s) Thirty Two Thousand Two Hundred Forty Three And Paise Sixteen Only
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-
10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated according to
but may be In Figures In Words estimated Quantities
Signature of Contractor Executive Engineer
R & B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
Spe. Index.pdf
Specifications.pdf
SBD Book.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .