Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹50.0 L
EMD Value
₹1.0 L
Closing Date
28 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE Manali Division HP PWD Manali
EE Manali Division HP PWD Manali
RRD on Patlikuhal to Hallan road Km. 0/0 to 9/200.under PDNA2025 (Sanctioned RD.0/165 to 0/265,0/730 to 0/760, 1/750 to 1/800,1/950 to 2/1010,2/300 to 2/420,2/510 to 2/540,5/630 to 5/690,7/570 to 7/600,7/980 to 8/030 and 9/120 to 9/220(SH C/O B/wall
2026_PWD_147913_1
RRD on Patlikuhal to Hallan road Km. 0/0 to 9/200.under PDNA2025 (Sanctioned RD.0/165 to 0/265,0/730
Open Tender
Civil Works
Percentage
180 days
manali
RRD on Patlikuhal to Hallan road Km. 0/0 to 9/200.under PDNA2025 (Sanctioned RD.0/165 to 0/265,0/730 to 0/760, 1/750 to 1/800,1/950 to 2/1010,2/300 to 2/420,2/510 to 2/540,5/630 to 5/690,7/570 to 7/600,7/980 to 8/030 and 9/120 to 9/220(SH C/O B/wall
5 documents required · 5 mandatory
₹2,000
₹1.0 L
19 Nov 2026
19 Nov 2026
30 Nov 2026
19 Nov 2026
28 Nov 2026
19 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area by manual means including cutting and trimming of side slopes and disposing of excavated earth with all leads & lift ,as per drawing and technical specification clause 1603.1 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 264.98 | Per cubic metre | 264.8 | ₹70,166.7 |
| 2 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 255.35 | Per cubic metre | 369.75 | ₹94,415.66 |
| 3 | Providing and laying concrete for plain/ reinforced concrete in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 (CC 1:6:12) within all leads and lift of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 7.29 | Per cubic metre | 4,769.95 | ₹34,772.94 |
| 4 | Providing and laying concrete for plain/ reinforced concrete1:3:6 (One cement :three sand : six graded stone aggregate 20mm (twenty millimetre nominal size ) in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 282 | Per cubic metre | 6,221.75 | ₹17,54,533.5 |
| 5 | Providing and laying concrete for plain/ reinforced concrete in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 (CC 1:4:8) within all leads and lift of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 4.4 | Per cubic metre | 5,408.7 | ₹23,798.28 |
| 6 | Stone masonry work in cement mortar for sub structure complete as per drawing and technical specifications clause 702,704,1202 and 1204 Random rubble masonry in cement mortar 1:6 (One cement : Six sand ).within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 264.08 | Per cubic metre | 5,439.15 | ₹14,36,370.73 |
| 7 | Providing and laying of boulder apron laid in wire crates with 4mm (Four millimetre ) dia GI wire conforming to IS: 280 and IS: 4826 in 100mmx 100mm(One hundred millimetre into One hundred millimetre ) mesh (woven diagonally ) including 10(Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg.(Twenty five kilogram ) each as per drawing and technical specifications clause 1301 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 445.31 | Per cubic metre | 3,128.85 | ₹13,93,308.19 |
| 8 | Coursed rubble masonry (Second sort) in cement mortar 1:5 (One cement :Five sand ) for sub structure complete as per drawing and technical specification section 700 and 1200 including hauling/carriage of materials and labour equipment to various location through all modes of transportation within all leads and lifts of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 12.91 | Per cubic metre | 5,777.9 | ₹74,592.69 |
| 9 | Providing and laying (to level or slope) 900mm dia (nine hundred millimetres) diameter reinforced cement concrete heavy duty non pressure pipes IS Class NP-3 (NP -three) for culverts on first class bedding of Granular material in single row including providing and fixing collar with cement mortar 1 : 2 ( One cement : two sand) but excluding the cost of excavation, protection works, back filling, concrete bedding and masonry work in head walls and parapets as per drawing and M.O.R.D. technical specifications clause 1101 and as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax or other taxes imposed by the Government but including GST. | 7.5 | Per running metre | 4,936.7 | ₹37,025.25 |
| 10 | Providing and laying flooring laid over cement concrete bedding complete as per drawing and technical specification Clause 1303 Rubble stone laid in cement mortar 1:3 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 0.49 | Per cubic metre | 2,807.45 | ₹1,375.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_221280.xls
BOQ • 0.28 MB
BidPatlikuhalHallan5000506.pdf
Tender Documents • 2.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .