Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹19,317
Closing Date
12 Oct 2026, 3:00 pm6d left
O/o the EE WRD II Kunjaban
O/o the EE WRD II Kunjaban
Construction Of 27 nos LI schemes and 8 nos RWH under RIDF XXIX MI Storage Project at Gudamchera Under Kathalia Block Of Sepahijala District Tripura Sh Implementation Of Pipe Line Distribution System From Conduit To Command Area By Di Pipe Line
2026_CEWR_77523_1
24/EE/WRD-II/2026-27
Open Tender
Civil Works
Percentage
180 days
Agartala
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹19,317
5 Oct 2026
5 Oct 2026
12 Oct 2026
5 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. a)All kinds of soil | 47.73 | cum | 231.6 | ₹11,053.11 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
-All kinds of soil | 1,200 | Cum | 179.9 | ₹2,15,880 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. A)All kinds of soil | 31.82 | Cum | 161.3 | ₹5,132.08 |
| 4 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1.45 | Cum | 1,177.3 | ₹1,711.79 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. a) All work upto plinth livel 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1.08 | cum | 11,735.9 | ₹12,616.09 |
| 5.1 | 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 40 mm nominal size) | 1.3 | cum | 11,078.1 | ₹14,357.22 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for: i) Foundations, footings, bases for columns | 13.03 | sqm | 303.1 | ₹3,949.39 |
| 6.1 | ii) Columns, piers, abutments, pillars, posts and struts | 7.92 | sqm | 492.7 | ₹3,902.18 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level: i) 1:2:4 ( 1 Cement: 2 fine sand : 4 graded well burned brick aggregate 20 mm nominal size) | 5.5 | cum | 11,080.4 | ₹60,953.28 |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth Level level i) Thermo-Mechanically Treated bars of gradeFe-500D or more | 369.09 | kg | 103.9 | ₹38,348.45 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
24DnitGudamcherra.pdf
Tender Documents • 3.76 MB
BOQ_78908.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .