Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.1 Cr
EMD Value
₹2.7 L
Closing Date
24 Dec 2026, 3:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer, BARC, Visakhapatnam
BARC(V) main campus, Gajuwaka - Yellamanchili Road, Maduturu Sub Post Office, Visakhapatnam-531011
Providing Chain-link fencing and Other Miscellaneous Works for the augmentation of NABTD facilities at BARC Main Campus Atchutapuram, near Visakhapatnam, Andhra Pradesh
2026_BARC_934644_1
BARC (V)/CES/NABTD Fencing/231 Dated 16.11.2026
Open Tender
Civil Works
Item Rate
450 days
BARC, Atchutapuram, Visakhapatnam
Please refer Tender documents
8 documents required · 8 mandatory
₹0
₹2.7 L
Meeting Room, UC-1 building, BARC(V)
18 Nov 2026
18 Nov 2026
1 Jan 2027
18 Nov 2026
24 Dec 2026
18 Dec 2026
18 Nov 2026 - 7 Dec 2026
7 Dec 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1General note applicable to all sections : 1) Only sieved river sand/crushed stone sand confirming to Zone-II from Godavari river or Varaha river or Vamsadhara river or Sarada river or Nagavali river / Crushed stone sand shall be used as fine aggregate and Graded hard broken granite metal of 3 stage (VSI) material shall be used as coarse aggregate in relevant items. Specification for fine and coarse aggregate shall confirm to IS:383 (latest revision) 2) In view of limit on water-cement ratio for durability requirements in design mix concrete, concrete admixtures (Carboxylate based superplasticizers of suggested makes as per annexure B of section VII) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for concrete items shall be inclusive of the cost of admixtures, Design mix, trial mixes, testing (at site & at approved labs), etc. complete. 3) The contractor shall set up sufficient number of self loading mobile concrete mixers inside the project area for the production of concrete. 4) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring.To that extent suitable Mix Design should be carried out with required retention period. No extra payment will be made if concrete is brought from RMC plants outside the project area. | |||||
| 1.1 | 5) Manufacturer's Test certificate of cement which is procured from dealer/company is to be submitted for all cement related works by the contractor.
6) "Substrcture" referes to the part of structure upto top level of ground floor grade slab and "Superstructure"refers to the part of structure above the top of the ground floor grade slab.
7) The Scope of works which are not included in any specific items but indicated in the document "General Scope of all works" shall be within the scope of overall contract works. The cost of work/item/material indicated in this document shall be deemed to be included in the quoted rates of all individual items.
8) The rate quoted for the items by the bidder shall include the suggested make as per Annexure B of Section VII of tender document. Any other additional makes proposed by the bidder have to be informed to BARC before pre-bid meeting (to be held before submission of bids) and to be approved by BARC. | - | - | - | - |
| 1.2 | 9) The quoted rates shall include necessary royalties, seigneiorage charges,etc. and all other charges to supply all the required construction materials.
10) For all standards and code of practices, specifications, like Indian Standard, MORT&H, ASTM, etc. refer only latest revisions including all applicable amendments, revisions and additional publications (during contract period) and these have to be followed.
11)Prior approval for source of all construction materials by submission of relavent test certificates, documents, invoices etc. have to be taken from BARC.
12) All the tests mentioned in Quality Assurance Plan(QAP) should be carried out without any extra cost.
13) The contractor has to submit all royalty /seigneiorage slips,etc for all the naturally available construction materials before submitting the RA bills. | - | - | - | - |
| 2EARTH WORK EXCAVATION | |||||
| 2.2 | e) the loose pockets shall be excavated and compacted after back filling as directed by Engineer-in-charge, as per detailed specification and conforming to safety rules during progress of the work.
f) Contour levels to be taken jointly with the Engineer-in-charge and prior written approval be taken before starting any excavation/ filling at every 3 m grids for arriving at the actual quantity,
g) Backfilling will be done in layers of thickness as specified below.
h) Cost inclusive of necessary royalties, seigneiorage charges and other charges to supply all the required construction materials,
i) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc. | - | - | - | - |
| 2.3 | Detailed topographic survey and submitting report including Conducting survey with TOTAL STATION/DGPS/GPS X,Y,Z instrument and to complete the following scope:
(i) Apex to Apex traverse showing all salient features viz permanent structures, roads, existing structures/buildings/huts, boundary walls, paved areas, culverts, nallas, rivers, other water bodies (vagu/cheruvu/gedda), electric poles(LT/HT), LT/ HT lines, transformers, septic tanks, STP, WTC, Telephone lines, worship places, sewer lines, strorm water drains, water supply lines, manholes, marking of Trees including type of tree & girth diameter at 1m height, other vegetation, any other features and establishing True North at site including clearing all bushes, shrubs as directed for conducting survey work only and preparation of drawings in CAD (.dwg) format, as instructed by the Engineer in charge.
(ii) Taking levels at every 5mx5m grid in the given plain area & 3m x3m grid in case of foot hills including clearing of bushes, shrubs etc. wherever necessary to take up the survey work & preparation of drawings in CAD (.dwg) format,
(iii) Plotting of contours at 1.0m Intervals using TOTAL STATION only and preparation of drawings in CAD (.dwg) format,
(iv) Submission of 2 hard copies of each signed drawings in colour along with CAD (.dwg) drawings in CD format and data, etc. The CAD drawings shall be submitted in both Local coordinates and WGS-84 system. Levels shall be with reference to Mean Sea Level.
(v) Transfering of temporary benchmark from available nearby benchmarks is included in the scope of this item. No seperate payemnt shall be made for the same.
(vi) All required arrangements for access and movement of the required vehicles, equipment and personal, necessary arrangements for functioning of the equipment etc. is deemed to be included in the rate quoted for the item. No seperate payment shall be made for the same. | 25 | Acre | - | - |
| 2.4 | Clearing Jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m / outside the periphery of the area cleared as per specifications and as directed by the Engineer-in-charge | 2,50,000 | Sqm | - | - |
| 2.5 | Cutting and felling trees of girth beyond 30 cm up to and including 60 cm girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable materials complete as per specifications and as directed by the Engineer-in-charge | 50 | Each | - | - |
| 2.6 | Earth work excavation by mechanical means (Hydraulic excavator)/ manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including jungle Clearance, shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 500 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | - | - | - | - |
| 2.61 | i) From 0.00m to 1.50m below average GL with refilling of excavated earth in layers | 600 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TenderDocument.pdf
Tender Documents • 6.88 MB
BOQ_982168.xls
BOQ • 0.35 MB
FORMSATOH.xls
Additional Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .