Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
29 Sept 2026, 6:00 pmDue tomorrow
The Executive Engineer, Public Health Mechanical Division, GWSSB, Bhuj
Operation, Maintenance, Repairing of SCF Pumpset with necessary accessories at Samakhiyali Headworks for Chitrod Section & Aadhoi Section for 06 Month Under Rapar RWSS M & R Programme- 2026-27 Taluka Bhachau in Kutch District.
343944
14/2026-2027
Open
Miscellaneous Works
Works
Kutch
7 documents required · 7 mandatory
₹900
Executive Engineer, P.H. Works Division, GWSSB, Bhachau-Kachchh
₹9,900
29 Sept 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
Estimated Cost :- Rs.9,87,720.00
Gujarat Water Supply & Sewerage Board
Zone -IV Bhuj-Kachchh
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
“BID DOCUMENTS FOR “Operation, Maintenance, Repairing of SCF Pumpset with
necessary accessories at Samakhiyali Headworks for Chitrod Section &Aadhoi Section for
Month Under Rapar RWSS M & R Programme- 2026-27 TalukaBhachau in Kutch District.”
BREAK UP FOR INTERIM PAYMENTS...............................................
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
Name of Work- “Operation, Maintenance, Repairing of SCF Pumpset with necessary
accessories at Samakhiyali Headworks for Chitrod Section &Aadhoi Section for 06 Month
Under Rapar RWSS M & R Programme- 2026-27 TalukaBhachau in Kutch District.”
(1) The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other
formats will be rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
unit rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation. In the Price
B gives the list of some principal items with tentative quantities of the work
there of for the guidance of the bidder. For any excess over tender quantities,
Extra items and variations in quantities, Refer Clause No 14 of Volume IB-
General Conditions of Contract.
(7) The total of the item prices in Schedule B1, Schedule B2 shall be equal to the
during the pendency of the Contract, except for items under-price variation
in Schedule B will be considered and binding on the Contractor. The prices in
Schedule B1. Schedule B2 of the successful bidder shall be corrected
(8) The bidder is not required to quote their prices in Schedule Ci.e. O&M prices.
The rates mentioned in the Schedule C for O&M are fixed and will be the basis
for payment during O&M as per tender terms and conditions. The Amount of
Schedule-C shall not be carried forward to Schedule B for comparison and
evaluation. But it shall be added to schedule B (After rebate, if any) for
overall cost of tender & shall form a part of the Contract Agreement.
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
(9) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit Variation in quantity will be paid with pro
(10) Each item is to be individually priced online and the amounts shall be added
of prices shall be left blank except where the item description requires the
item to be priced on "as applicable" basis. The item shall not be priced if it is
"not applicable to the bidder's design, in which case the bidder shall add the
words "NOT APPLICABLE". The wording in the item description is for subject
matter guidance only: clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the
works covered under the bid and all liabilities and contractual obligations
whether separately specified or not Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
executed for satisfactory working/safety of the system as specified, will not
be separately paid for by the Employer when executed and shall be deemed
to be already covered by other items and rates listed in the price sheets No
extra payment shall be given for any item which is required to complete and
perform the project.
(12) Bidder shall not to quote for O&M in Schedule-C. In case of any discrepancy
successful bidder shall be corrected accordingly.
(13) Schedule ‘D gives the basis of interim payment for construction of works.
rebate, if any will be considered for financial evaluation of the bid.
(15) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper executing of work. The rate shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(16) Prices shall be filled online only.
Contract the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
(18) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(19) The prices quoted shall also include the cost of materials utilized for testing.
(20) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(22) 1% of the value of work will be deducted from the Running bill against labour
cess which is non-refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work
due to misinformation shall be recovered from the contractor.
(25) The prices shall be quoted prices shall be quoted exclusive of GST, but
inclusive of all other taxes, royalties and duties prevailing at the time of
submission of the bids. Statutory variation if any during the currency of
contract shall have to borne by the agency whichshall be not reimbursed by
(26) The rates quoted shall be exclusive of GST, but inclusive of all other taxes,
duties which shall not be paid extra. While GST will be paid for admissible
part of actual work done at the approved tender rates and tender conditions
of price variations GST shall be paid as per prevailing rates at the time of
payment. The TDS shall be deducted at source as per provision of IT rules and
(27) The rates should be quoted exclusive of GST but inclusive of all other taxes as
per Volume-I (B), General Conditions of Contract, Clause No.
(28) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(29) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
contract except price variation allowed for supply of MS/DI/PVC/GI pipe as
per Volume-1 (B) Clause No. 59, General Conditions of Contract.
(30) Payment shall be made for the components for which lump sum prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those
particular items only.
(31) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply &Kalpasar Dept. Resolution No
GEN-2010-595-(6)- M.I.Cell (K-1) Dt. 29-4-2011 (Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased (with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnish such additional information as regards royalty
payment to the competent authority.
(32) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of noncompliance entire responsibility
shall be rest with the agency and required amount shall be recovered from
any due amount of the agency.
(33) GWSSB can recover penalty amount from the agency for not taking the
insurance Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
Signature of contractor Executive Engineer
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH MECGHANICAL DIVISION,
SUB:Operation, Maintenance, Repairing of SCF Pumpset with necessary accessories at
Samakhiyali Headworks for Chitrod Section &Aadhoi Section for 06 Month Under Rapar
RWSS M & R Programme- 2026-27 TalukaBhachau in Kutch District.
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, commission, operate and maintain the whole of the said works for 10 years
from the date of commissioning including defects liability period as given in Conditions
of Contract and in conformity with the drawings, conditions of Contract,
Addenda Nos.__________ (insert numbers) for Lump sum fixed price of
) for Construction includingfree trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the
inspectionand testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by
the Engineer’s representative.
c) if wefail todeliver purewater ofrequired quantityaccording to
theconditions/stipulations of the Contract, the Engineer will be at liberty to take any
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons, from
the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of submission
of the bill and it shall remain binding upon us and may be accepted at any time before
the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but until
such agreement is prepared this Bid together with your written acceptance thereof
shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
Dated this ________________ day of
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
NAME OF SCHEME–
Operation, Maintenance, Repairing of SCF Pumpset with necessary accessories at
Samakhiyali Headworks for Chitrod Section &Aadhoi Section for 06 Month Under Rapar
RWSS M & R Programme- 2026-27 Taluka Bhachau in Kutch District.The bidder shall quote
his firm and fixed price for the entire work under this Contract, defined in more details in
various sections of this bid document.
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be
Schedule Showing the Approximate Materials to be Supplied by the Department for the work to be Carried
out in this Contract and Rate which they are to be Charged.
Sr. No. Description Quantity Rate of Unit Place of
which delivery of
material materials
1. Materials not included in “Schedule – A” but required for the work shall be provided by the contractor at
2. Any materials required for items other than labour charges items mentioned in “Schedule – B” and
materials not included in “Schedule – A” but available with dept. will be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and transporting the materials
issued by the dept. from store to site at his own cost. Contractor will be responsible for damages
whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the department in
good and acceptable condition by the contractors. Any such unused materials not returned by the
contractor in time or issued will be recovered at Double of (As per issue rate + 3% storage charge or
Board RC + 3% storage charges) whichever is more.
5. All materials such as Specials, Fittings, Spares,PAC solution and Alum/PAC etc. shall bebrought by Agency
/ Contractor at site of work.
6. Contractor shall supply chlorine gas
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
7. The material which requires to be procured by contractor and same as available with the department the
same can be issued to the contractor after prior approval from the competent authority and charged for
the same will be at the current market rate or issue rate fixed by the department whichever is higher.
The contractor shall have to deposit total cost of materials issued or shall be recovered from the running
8. The materials issued for the above work shall be used in the above O&M work only. If any of materials
issued for this work and found used in other works shall be charged at the double rate.
9. As per the instructions of the competent authority and availability of materials, if needed contractor
have to transport the same from the other store to VariousRWSS Scheme for which no extra carting,
loading, unloading will be paid.
10. The materials issued free of cost to the contractor is to be transported to the site of work in good
condition by the contractor for which no extra payment will be made.
11. The materials to be brought/purchase by the contractor shall be got approval from the EIC before using
Signature of contractor Executive Engineer
P.H.Mech Dn., G.W.S.S.B
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
GUJARAT WATERSUPPLY &SEWERAGE BOARD
NAME OF WORK:-Operation, Maintenance, Repairing of SCF Pumpset with necessary accessories at
Samakhiyali Headworks for Chitrod Section &Aadhoi Section for 12 Month Under Rapar RWSS M & R
Programme- 2026-27 TalukaBhachau in Kutch District.
QTY. DESCRIPTION OF ITEM (Per PER AMOUNT
Comprehencive Operation &Maintance
pumping station premises, plant machineries
and Eletricalequipments installed at Head
Works by Engineering necessary operators,
Electrical Wireman, Helpers, Chokidar etc. as
per requirement with providing & utilizing
necessary lubricants, tool kit and all other
06.00 running consumables as well as routine plant 1975434.06 164620.00 Month
and emergency break down maintenance and
all minor precentive repairs to all installed
plant machineries/equipments and preparation
of maintenance and preservation record for
pumping machinery utilization, energy
conumption qty. of water pumped etc. and
submitted to office in prescribed proforma
including stationaery materials as per
instruction of Engineer-in-Charge.
Total Amount without GST Rs.
Total Amount without GST Rs.
Rupees Nineteen Lakh Seventy-Five Thousand Four Hundred Forty
I / We am / are willing to carry out the work at__________________% above / below. Percent (should
be written in figure and words) of the estimated rates mentioned above. Amount of my/our tender
works out as under.:-
(Please strick out which ever is not applicable)
For Above For Below
Estimated amount Rs. Estimated amount Rs.
Put to tender Rs. Put to tender Rs.
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
Add % Above Rs. Deduct % below Rs.
Net Rs. Net Rs.
In words Rs. In words Rs.
Signature of contractor Executive Engineer
I / We am / are willing to carry out the work at__________________% above / below. Percent (should be
written in figure and words) of the estimated rates mentioned above. Amount of my/our tender works out as
Estimated amount Rs. 9,87,720.00 Estimated amount Rs.
Put to tender Rs. Put to tender Rs.
Deduct % below Rs. Add % above Rs.
Net Rs. Net Rs.
In words Rs. In words Rs.
(Please strick out which ever is not applicable)
• Rates to be quoted exclusive of GST.
• Part A is payable on monthly basis whereas part B & C are subject to completion of activities
and approval of the measurement.
• Water supply of target quantity of water to all villages on a daily basis. If due to breakdown,
agency is not capable of supplying water then such quantity should be supplied the next day
to cope up with the shortage. Such that the water supplied on the next day will be 2 times the
regular per day target.
• Contractor should quote rate in words & figure both.
• Insurance Policy should be procured in favour of Executive Engineer, PH Mech Division,
Bhuj and contractor has to produce it before entering into agreement with department, for the
full period of O&M.
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
• The bidders should strictly note that rate will be fixed and firm. No escalation will be given
during the maintenance period.
• The work should be carried out as per the terms and conditions laid down in the tender
• The cost of raw water, electricity will be borne by GWSSB.
• Contractor will supply necessary stock of Chlorine gas at the location of chlorination plant.
All other required material for O&M work shall be brought by the contractor at his own cost
including loading, unloading and carting and the same material shall get approval from the
Engineer-in-charge before use in the work.
• The cost is including all type of taxes (other than GST), octroi, freight, loading, unloading,
carting labour charges payment to labour including insurance, P.F. and all other liabilities for
the staff engaged for the O&M work.
• All replaced material (provided from the department’s store) shall be returned to department
store by the contractor at his own cost.
Signature of contractorExecutive Engineer
P. H. Mech. Div., GWSSB-Bhuj
1)The Schedule specifies the procedure for all such assessment of the items specified in
2) Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
3) Percentages are indicated against each component of each items specified in Schedule
8, based on the Employer's best appreciation of the value of the component as related
to the total costs of the concerned item as whole. A head titled (any other item(s)) is
included in each breakdown of schedule and the tenderer shall at the time of
tendering indicate any additional items which ne considers necessary but cannot be
covered by any of the heads indicated in the breakup.
4) The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer's scheme and design and he should take this into account
while quoting his lump sum prices for the items specified in Schedule-B
Volume-III, PRICE BID Samakhiyali HW O&M 6 Month
5) The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at any
stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and by
the method approved by the Employer's Representative and signed jointly by both the
Signature of contractorExecutive Engineer
P. H. Mech. Div., GWSSB-Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. O and M Model DTP Vol I Samakhiyali HW 06 Months.pdf
2.SHEDULE-B Samakhiyali HW 06 monthx.pdf
3.VOL 3 Price bid Samakhiyali HW 06 M and R.pdf
4.List of Bank EMD SD.pdf
5.GST AND Price Variation Paripatra 2023.pdf
6.CIRCULAR Pumping Machinarery dt 28-07-2022.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .