Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹68.5 LAccepted-Finance 1 TAHSIL ROAD MAUDAHA RAGAUL HAMIRPUR | ₹68.5 L | L 1 | Accepted-Finance Accepted |
| 2 | L 2₹68.6 LRejected-Finance GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | ₹68.6 L | L 2 | Rejected-Finance Rejected |
| 3 | L 3₹69.3 LRejected-Finance MANDAL SERA BAGESHWAR DISTRICT BAGESHWAR | ₹69.3 L | L 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | maa bhagwati electricals L2 | SANGAM ENTERPRISES L3 | DEEPAK CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | LT Clamp with N&B ST Pole SP-21 | 30 | Nos | 180 ₹5,400 | 181 ₹5,430 | 180 ₹5,400 |
| 3.00 | Suspension Clamp Eye Hook LT ABC Cable | 310 | Nos | 500 ₹1.6 L | 501 ₹1.6 L | 500 ₹1.6 L |
| 4.00 | Dead end clamp for AB Cable | 65 | Nos | 500 ₹32,500 | 501 ₹32,565 | 500 ₹32,500 |
| 5.00 | Mid Span Insulator J.Sleeve for LT ABC | 80 | Nos | 200 ₹16,000 | 201 ₹16,080 | 200 ₹16,000 |
| 6.00 | STAY Insulator | 30 | Nos | 30 ₹900 | 31 ₹930 | 30 ₹900 |
| 7.00 | LT Bare N.conn. PG Clamp for DB 50-50 MM2 | 419 | Nos | 135 ₹56,565 | 136 ₹56,984 | 135 ₹56,565 |
| 8.00 | Insulated Piercing Connector 50-50 Sq.MM | 511 | Nos | 248.66 ₹1.3 L | 249 ₹1.3 L | 248 ₹1.3 L |
| 9.00 | LT AB Cable 3C x 50 + 1 x 35 Sq.mm | 15,450 | Mtr | 237.29 ₹36.7 L | 240 ₹37.1 L | 237 ₹36.6 L |
| 10.00 | LT Distribution Box 1 Phase | 229 | Nos | 4,000 ₹9.2 L | 4,005 ₹9.2 L | 4,000 ₹9.2 L |
Tender Value
₹68.6 L
EMD Value
₹1.4 L
Closing Date
26 Feb 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Replacement of LT Line conductor by ABC at Dangoli Section under EDD Bageshwar
2026_UPCL9_91953_1
EDC(R)-103/2025-26
Open Tender
Electrical Works
90 days
Bageshwar
As per Tender Documents
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹1.4 L
16 Apr 2026
12 Feb 2026
27 Feb 2026
12 Feb 2026
26 Feb 2026
12 Feb 2026
NON-CENTRALIZED MATERIAL (SUPPLY)
LT Clamp with N&B ST Pole SP-21
Suspension Clamp Eye Hook LT ABC Cable
Dead end clamp for AB Cable
Mid Span Insulator J.Sleeve for LT ABC
STAY Insulator
LT Bare N.conn. PG Clamp for DB 50-50 MM2
Insulated Piercing Connector 50-50 Sq.MM
LT AB Cable 3C x 50 + 1 x 35 Sq.mm
LT Distribution Box 1 Phase
LT Distribution Box 3 Phase
LABOUR PART (WORK)
Excavation of pit for Stay Set
Erection of LT Stay Set
Grouting of Stay Set
Excavation of Pit for Pole
Erection of Single SP-21 Pole
Grouting of Pole
Muffing of Pole
Dismantling of LT line 1 P 2 W (Weasel)
Dismantling of LT line 2 P 3 W (Weasel)
Dismantling of LT line 3 P 4 W (Weasel)
Painting of SP-21/23 Pole
Cartage SP-21/23 Pole, 71-100 Km
Cartage of Petty Material, 71-100 Km
Headload Cartage SP-21/23 Pole (1-3 Km)
Headload Cartage of Material (1-3 Kmm)
Installation of LT DB 1 Ph for LT AB
Installation of LT DB 3 Ph for LT AB Cab
Disconnection & Reconnection of Consumer
Erection of Dead end Clamp
Erection of Suspension Clamp
Back Head load cartage of Petty mat 1-3 Km
Laying of LT AB Cable 3C x 50 + 1x35
Fixing of Piercing Connector 50-25 Sq.mm
Back Carriage of Scrap Meterial
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_108885.pdf
techsummary_108885.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
RepLTlinebyABCinDangoli103.pdf
Tender Documents • 0.72 MB
BOQ_108885.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid