Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | -41.00% | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 L+₹15,582.70 (12.7%)Admitted-Finance | -33.50% | ₹1.4 L+₹15,582.70 (12.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹25,410.20 (20.7%)Admitted-Finance | -28.77% | ₹1.5 L+₹25,410.20 (20.7%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 L+₹39,476.19 (32.2%)Admitted-Finance | -22.00% | ₹1.6 L+₹39,476.19 (32.2%) | L4 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹4,160
Closing Date
29 Jun 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer CCD-I NGHEP GANDERBAL
Clearance of Rank Vegetation
2026_SPDC_311877_1
ENITNo01OF2026Dated08062026
Open Tender
Civil Works - Others
Percentage
20 days
RANGIL GANDERBAL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Chief Pay and Accounts Officer USHP-IInd Kangan
₹4,160
Yes
In the Office of Executive Engineer
9 Jul 2026
9 Jun 2026
1 Jul 2026
9 Jun 2026
29 Jun 2026
9 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | DETAILS | - | - | - | - |
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 124 | 100 Sqm | 1,249.1 | ₹1,54,888.4 |
| 2.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as irected:1 meter from cutting edge. All kinds of soil. | 0.27 | cum | 479.3 | ₹129.41 |
| 3.01 | Steel work welded in built up sections/framed work, including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 212 | kg | 181.6 | ₹38,498.29 |
| 4.01 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work. | 9.8 | sqm | 131.85 | ₹1,292.26 |
| 5.01 | Lettering with black Japan paint of approved brand and manufacture. | 2,250 | per letter per cm height | 5 | ₹11,250 |
| 6.01 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 0.27 | cum | 5,733.6 | ₹1,548.07 |
| 7.01 | Cariage for Steel lead of 5 km. | 0.21 | tonne | 178.43 | ₹37.65 |
| 8.01 | Carriage for Cement lead of 5 km. | 0.06 | tonne | 178.43 | ₹10.71 |
| 9.01 | Carriage for Sand lead of 10 km. | 0.13 | cum | 303.34 | ₹38.22 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
SBD.pdf
Tender Documents • 1.20 MB
BOQ_1009682.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .