Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Finance | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹8.0 L
EMD Value
₹15,960
Closing Date
17 Oct 2023, 4:00 pmClosed
Executive Engineer
Executive Engineer Generation Div LJHP Gantamulla
Trash cleaning at barrage during the months of chest nut harvesting season and trash cleaning at forebay during approved shutdowns on quarterly basis for a period of 1 year at LJHP Baramulla
2023_SPDC_231344_1
Short Term eNIT No 08 of 2023-24 dated 27.09.2023
Open Tender
Civil Works
Item Rate
1 days
Barrage and Forebay of LJHP Power House
Please refer Tender documents.
11 documents required · 11 mandatory
₹200
Yes
Executive Engineer
₹15,960
Yes
25 Nov 2023
27 Sept 2023
19 Oct 2023
27 Sept 2023
17 Oct 2023
27 Sept 2023
Amount
Trash cleaning at Barrage during chest nut harvesting season by way of engaging of boats and boatmen in order to carry out the on line trash cleaning of the trash racks installed at Barrage to minimize the loss of generation within a period of one year. The job includes all the tools and tackles required for the job along with all the consumables like fuel, lubricants etc. and transportation of labour to the site. Note :- The no. of days for which the trash clearance is required will depend upon the frequency of trash accumulation. The contractor shall be intimated by AEE concerned for the days when the trash clearance is required during the year. The division has estimated the maximum of 25 days of trash accumulated in the chestnut harvesting season, however the payment shall be made on prorata basis as per days of trash cleared by the contractor.
Trash cleaning at Forebay during approved shutdowns for a period of 1 year by way of engaging of boatmen along with skilled labour in order to carry out the trash cleaning upto the level that has been exposed during the approved shutdown along with disposal of the racked trash at suitable dumping area. The job includes all the tools and tackles required for the job along with all the consumables like fuel, lubricants etc. and transportation of labour to the site. The contractor may use the motor boats and 5 ton Coles crane stationed at Forebay however the fuel and all the required lubricants has to be provided by the contractor. has to provide fuel for the motor boats Note :- The no. of days for which the trash clearance is required will depend upon the frequency of trash accumulation. The contractor shall be intimated by AEE concerned for the days when the trash clearance is required. The division is planning to take up 4 trash cleanings during approved shutdowns for a period of 1 year, however the payment shall be made on prorata basis as per the trash cleanings done by the contractor. The completion period for trash cleaning during the approved shutdown shall be strictly within the duration of the approved shutdown for each trash cleaning.
Providing backup support during online trash cleaning done by the needbase staff of the division involved in the trash clearance along with tools and tackles, lubricants, and fuel charges for 5 ton Coles crane of MID/motor boats required for trash clearance and fuel for Tata Grande for ferrying of labour. Note :- The no. of days for which the trash clearance is required will depend upon the frequency of trash accumulation. The contractor shall be intimated by AEE concerned for the days when the trash clearance is required. The division is planning to take up 12 online trash cleanings during a period of 1 year, however the payment shall be made on prorata basis as per the trash cleanings done by the contractor.
Disposal of the trash that gets accumulated on the dumping bay during online trash cleaning of forebay by way of hiring of tractor and JCB for loading and dumping of the trash at suitable dumping areas. Note :- At present trash has accumulated on the dumping bay of the forebay and the contractor has to dispose the trash accumulated at present at the start of the contractor. It is assumed that a maximum of 12 jobs of disposal of trash shall be carried out during the 1 year contract period, however the payment shall be made on prorata basis.
ABDUL LATIEF NAIKOO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .