| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.5 LAccepted-Finance | ₹40.5 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹41.0 LRejected-Finance BAGESHWAR UTTARAKHAND UT | ₹41.0 L | L2 | Rejected-Finance Second lowest bidder |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH PARIHAR L1 | Subodh Lal Sah L2 |
|---|---|---|---|---|---|
| 1.00 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m.All kind of soil. | 510 | sqm | 15 ₹7,650 | 33.06 ₹16,860.60 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 44.31 | Cum | 200 ₹8,862 | 252.01 ₹11,166.56 |
| 3.00 | Providing and laying in position cement concrete of specified grade cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 9.95 | Cum | 6,800 ₹67,660 | 6,594.94 ₹65,619.65 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 23.81 | Cum | 9,500 ₹2.3 L | 8,757.51 ₹2.1 L |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 6.89 | Cum | 10,000 ₹68,900 | 10,507.13 ₹72,394.13 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc for mass concrete. | 68 | sqm | 300 ₹20,400 | 379.65 ₹25,816.20 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 112.8 | sqm | 800 ₹90,240 | 930.67 ₹1.0 L |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers. | 67.62 | sqm | 600 ₹40,572 | 712.93 ₹48,208.33 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,409.56 | Kg | 120 ₹2.9 L | 118.09 ₹2.8 L |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.46 | Cum | 9,000 ₹13,140 | 9,025.69 ₹13,177.51 |
Tender Value
₹47.6 L
EMD Value
₹94,700
Closing Date
10 Apr 2026, 12:00 pmClosed
EE, RWD DIVISION BAGESHWAR
EE, RWD DIVISION BAGESHWAR
Construction of Children Park at Tehsil Bageshwar.
2026_RES_93642_1
1768/E-TENDER/RWD/2025-26 DATE 27-03-2026
Open Tender
Civil Works - Others
90 days
BAGESHWAR
Please refer tender documents.
2 documents required · 2 mandatory
₹3,540
LEKHASHIRSH 0515008000100 and GST 05AAAGR0664Q1ZW
₹94,700
28 Apr 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
10 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift up to 1.5 m.All kind of soil. | |||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | |||||
| 3Providing and laying in position cement concrete of specified grade cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | |||||
| 4Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | |||||
| 5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | |||||
| 6Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc for mass concrete. | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for lintels, beams, plinth beams, girders, bressumers and cantilevers. | |||||
| 9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| 10Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_110854.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_110854.xls
BOQ • 0.31 MB