Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technical bid is rejected by CSL execution department as you have not quoted for various DLs related to GT and ORION CONTROLS JOBS |
Tender Value
Refer Docs
Closing Date
14 Jun 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DEPUTY GENERAL MANGER, SRM
Ship Repair Materials Department Cochin Shipyard Limited Kochi-682015 Kerala, India
GT and ORION CONTROLS JOBS FOR NAVY VESSELS
2024_CSL_196665_1
CSL/SRM3/ADV102-103
Open Tender
Marine Services
Turn-key
360 days
Cochin
Refer tender documents
2 documents required · 2 mandatory
₹0
Exempted
8 Jul 2024
28 May 2024
15 Jun 2024
28 May 2024
14 Jun 2024
28 May 2024
28 May 2024 - 13 Jun 2024
Amount
GT CONTROL – Scope of work 1 (RM.0789). Vendor to quote for services including materials
UNDERATKE OVERHAUL OF FUEL BOOST PUMP (QTY 03) AS FOLLOWS: - RENEW AND CALIBRATE PRESSURE GAUGES.
UNDERTAKE OVERHAUL OF GT & RG LUB OIL SYSTEM AS FOLLOWS: - REPLACE AND CALIBRATE PRESSURE GAUGES.
CARRY OUT THE MAJOR OVERHAUL OF THE GT/ RG COOLING SYSTEM (DD RELATED) AS FOLLOWS:- OVERHAUL POSITION TRANSMITTER. FOR ALL GT RG COOLERS
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES.
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - REMOTE OPERATION OF BOSST DOORS NOT AVAILABLE FROM MCR CCC PANEL.UNDERTAKE COMPLETE OVERHAUL OF BOOST EXHAUST DOOR CIRCUITARY AND ASSOCIATED CONTROL CONPONENTS. REPLACE CONSUMABLES, SEALS, WORN OUT PARTS
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - UNDERTAKE REPAIRS OF CLOSING MECHANISM BOTH ELECTRICAL AND MECHANICAL SYSTEM.
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - ABNORMAL NOISE AND VALVE STRUCKING UP OBSERVED DURING OPENING AND CLOSING OF BOOST EXHAUST DOOR. OVERHAUL OF CHECK VALVE AND 2/2 VALVE OF BOOST EXHAUST HYDRAULIC SYSTEM.
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - UNDERTAKE REPAIR AND OPERATIONALISE 4/3 WAY VALVEs OF BOOST GT DOOR HYDRAULIC SYSTEM
UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES VIEW GAUGES MALFUNCTIONING. RANGE: 0-250 KGF/CM2,
REPLACE AND OPERATIONALISE AMBIENT AIR TEMP INDICATOR (04 GAUGES, CABLE FROM CCCP TO ALL 04 GT INTAKES AND 04 SENSOR).
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES ALONG WITH SENSORS. RENEW 50% QUANTITY VIEW DEFECTIVE
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REMOVE OLD CONTROL EQUIPMENT AND FIT NEW CONTROL UNITS POST REPLACEMENT OF NEW GTs (02 NO) AND NEW RGs (02 NO). REF DOCUMENT SEACAL
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REMOVE AND OVERHAUL AND REFIT CONTROL EQUIPMENT OF OLD GTA UNITS (02 GTs AND 02 RGs) REF DOCUMENT SEACLs
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- OVERALL AND CALIBRATION OF 06 SETS OF GT FUEL EQUIMENTS COMPRISING OF THE FOLLOWING IN EACH SET:- (A) FUEL BURNERS (B) PLUNGER TYPE FUEL PUMP (C) AUTO FUEL CONTROL UNIT (D) DRAIN VALVE (E) EMERGENCY DRAIN VALVE (F) STARTING VALVE (G) STOP COCK (H) THROTTLE COCK (J) FLOW DIVIDER (K) VALVE BLOCK (L) IGNITER INJECTOR (M) PRESSURE RISE LIMITER - (FOR BOOST GTs ONLY) (N) FLOW RISE LIMITER - (FOR CRUISE GTs ONLY) (P) FUEL FILTER
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- I.A.W GTTT (MBI)/ SEACLS UNDERTAKE STW OF COMPLETE GT AGGREGATE AND OFFER TO GTTT (MBI), IN STAGES AS MENTIONED IN SEACLS VIZ. (A) COMPLETE CONTINUITY CHECKS OF CABLING, (B) INSTRUMENTATION AND CONTROL INSTALLATION INSPECTION, (C) INSULATION CHECKS WITH CCC PANEL CONNECTED TO EACH GT/ RG (D) CONNECTORISATION CHECKS (E) FUNCTIONAL CHECKS (F) INTERLOCK CHECKS (G) COLD AND HOT PROTECTION CHECKS (H) SEA TRIAL REGIMES AS RECOMMENDED BY GTTT(MBI).
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- OVERHAULING OF GT STARTER DC MOTORS (90V DC)
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- UNDERTAKE REAPIRS/ SERVICEABILITY CHECKS OF. CTP PANEL IN VIEW OF FAULTY INDICATION. "
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "DE-COUPLER OF SBGT MALFUNCTIONING. UNDERTAKE CIRCUIT CHECK AND REPAIR OF SBGT DE-COUPLER
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- SERVICECIBILITY CHECKS OF 05 IN NOS POWER BLOCKS.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- MANUFACTURING OF 02 IN NOS SECURING ARRANGEMENTS FOR FITMENT OF SHAFT RPM INDICATOR AT BRIDGE WINGS.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF SCRG FROM RELAY TO JUNCTION BOX:- (A) RG TEMP OUT , (B) RG TEMP IN, LENGTH- 10 MTR
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF PCRG FROM RELAY TO JUNCTION BOX:- (A) - (D)(B)(P) THROW OVER GEAR TRANSDUCER , (B) - (D)(C)2- 2ND SPEED BRAKE TRANSDUCER TO THEIR JUNCTION BOXES- LENGTH 5 MTR EACH.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF PBRG FROM RELAY TO JUNCTION BOX:- (A) RG TEMP OUT- LENGTH 10 MTR.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT/RESOLDERING OF DAMAGED CONNECTOR-3KC (P)- 10 PIN CONNECTOR OF PCRG, ALONG WITH REPLACEMENT OF CABLE FROM JUNCTION BOX TO THIS CONNECTOR.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF DAMAGED CABLE OF PCGT, PTR FROM PTR TO POWER SUPPLY UNIT. LENGTH- 20 MTR.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPAIR OF 04 IN NO. POWER BLOCK AND 11 IN NO. RELAY BLOCK. DOSSRR
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPAIR OF 10 IN NO. POWER BLOCK AND 10 IN NO. RELAY BLOCK.
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "LPC TACHOMETER OF PCGT MALFUNCTIONING. UNDERTAKE CALIBRATION AND SERVICEABILITY CHECKS. REPLACE (WITH NEW).
UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "PCGT HPC RPM TACHOMETER MALFUNCTIONING. UNDERTAKE CALIBRATION AND SERVICEABILITY CHECKS REPLACE (WITH NEW).
UNDERTAKE OVERHAUL/ ROUTINES OF MAIN RGs AS FOLLOWS:- CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES ALONG WITH SENSORS. REPLACE 50% QUANTITY VIEW DEFECTIVE.
CALIBRATE ALL PRESSURE GAUGES. REPLACE 50% DEFECTIVE
CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED.
BAKC RECTIFIER (BAKC-7-30) FWD ENGINE ROOM OVERHAUL THE RECTIFIER AND CHANGE CONSUMABLES, DEFECTIVE DIODES NO - 10 NO, TRANSFORMERS - 4 NO, FILTERS - 04 NO ETC REFURBISH INTERNAL WIRING
BAKC RECTIFIER (BAKC-7-30) FWD ENGINE ROOM CARRY OUT LOAD-TRIALS
BAKC RECTIFIER (BAKC-7-30) FWD ENGINE ROOM UNDERTAKE REPAIRS AND PAINTING OF RECTIFIER CABINET (SIZE 2FTX2FTX1FT)
BAKC RECTIFIER (BAKC-7-30) FWD ENGINE ROOM REPLACE AND CALIBRATION OF AMMETER (0-30 AMP) AND VOLTMETER (22-40 VDC) VIEW OF SHOWING ERRATIC VALUE.
BAKC RECTIFIER (BAKC-7-30) FWD ENGINE ROOM REPLACE (WITH NEW) SHOCK MOUNT
MISSILE RECTIFIER (BAK(E)(P)-22-28-5PBM) AFT ENGINE ROOM/ FWD ENGINE ROOM OVERHAUL THE RECTIFIER AND CHANGE CONSUMABLES, DEFECTIVE DIODES NO - 20 NO, TRANSFORMERS - 4 NO, FILTERS - 04 NO ETC REFURBISH INTERNAL WIRING
MISSILE RECTIFIER (BAK (E) (P)-22-28-5PBM) AFT ENGINE ROOM/ FWD ENGINE ROOM CARRY OUT LOAD-TRIALS AT SPECIFIED VALUE.
GT CONTROL – Scope of work 2 (RM.0789) REMOVE / REFIT / INSTALLATION OF MAIN GAS TURBINE AGGREGATE - 1241 RE CLASS OF SHIP Vendor to quote for services including materials
Service and Material - De-gutting/Re-gutting of GT starting rectifier
Service and Material - Remove chain and motor of shaft RPM measurement system and take custody of it
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of OSTK temp. Relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/ Refurbishment, calibration and re-installation of Adaptor temp. Relay with sensor (includes disconnection old connectors & fitment, connection of new connection)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of GT inlet temp. Relay (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of GT parameters combined gauge with sensor
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of RG inlet temp 500 (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/refurbishment, calibration re-installation of RG outlet Temp 800 (includes disconnection old connectors & fitment, calibration of new connectors
Service and Material - Removal, Repair/refurbishment, calibration, re-installation of GT lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration, re-installation of RG lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, calibration and re-installation of Ambient temp. Intake indicator with sensor (includes disconnection & connection of connectors/wiring)
Service and Material - Removal, Repair/refurbishment, calibration and re-installation of cruise GT HPC RPM indicators (MCR & Bridge) and A/D convertor (includes disconnection & connection of new connectors/wiring)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of fuel tank level relay (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of Cruise GT LPC/PT RPM Indicator with Generators (Port & Stbd) (includes disconnection & connection of connectors/wiring)
Service and Material - Removal, Repair/Refurbishment, calibration and Re-installation of Boost GT HPC/LPC/PT RPM indicator with Generators (Port & Stbd) (includes disconnection & connection of connectors)
Service and Material -Removal, Repair/Refurbishment, calibration and Re-installation of shaft speed indicators and Tacho Generator (includes disconnection & connection of connectors/ wiring connection)
Service and Material - Removal, Repair/Refurbishment, testing and Re-installation of CTP and KC 429 (includes disconnection & connection of connectors/wiring connections)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of PTR (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of LPT Exhaust temperature indicators (local, MCR & Bridge) (includes disconnection & Connection of wiring connections)
Service and Material - Removal , Repair/Refurbishment, testing and re-installation of ORT unit (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/ Refurbishment, testing and Re-installation of BCO unit with sensor (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of ABM unit with sensor (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of AKC 20 with sensor
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of control station for cruise & Boost GT (including all 15 Relay/ Timer /Pwer Blocks) (includes disconnection & connection of connectors)
Service and Material - Internal connection of contactor box (kk)
Service and Material - Removal, Repair/Refurbishment, testing and Re-installation of chip detector relay block
Service and Material - Removal, Repair/refurbishment, testing and re-installation of chip detector sensor
Service and Material - Removal, Repair/refurbishment, testing and Re-installation of Chip detector indication & monitoring unit
CCC PANEL BLOCKS:- Service and Material - Removal, Repair/Refurbishment, testing and re-installation of relay Blocks (BR)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of power Blocks (BP)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Main Gas Engine control Unit (BYGTG)
Service and Material - Removal, Repair/refurbishment, testing and re-Installation of Auto control Unit (BA)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Amplifier cards (YC)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Follow-up Control sub Unit (CCY)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Remote Control sub Unit
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Scoop & Emergency valve relay Unit
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Throttle control lever (MCR & Bridge)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Actuating Mechanism
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Reversing Manipulator
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Reversing Indication Unit
Service and Material - Removal, overhauling (includes Painting), testing, tuning, fitment onboard of orion Hydraulic GT Control panels (includes testing of individual components) (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of scoop control panel (includes setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes painting), testing, tuning, fitment onboard of pump control panel (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes painting), testing, tuning, fitment onboard of Emergency control panel (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal , Overhauling (includes Painting), testing, tuning, fitment onboard of actuator mechanism (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of pressure reducer panel of scoop valve
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of Boost Door Control Panel (including Setting of work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, overhauling (includes Painting), Testing, Tuning, Fitment onboard of locking, unlocking hydraulic panel of Boost Door ( Including Setting to work, Proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Overhauling, Testing, Tuning of scoop valve (Including Fire Main Valves) (Including Setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal and Fitment of scoop valve (Including Fire Main Valves)
Service and Material - Removal, Overhauling, Fitment and onboard tuning of Tie Rod of fuel rack (including Setting to work, Proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Flushing through and pressure testing of Hydraulic Pipes onboard
Service and Material - Setting to work of MCR Throttle to actuator mechanism for all four GT
Service and Material - Setting to work of actuator mechanism to fuel rack/valve for all four GT
Service and Material - Proving and STW of Orion Timing in FC and RC mode for all four GT
Service and Material - Connections of Starter on all four GTs
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of GT parameters combined gauge with pressure sensors
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of Condensate tank level relay (Includes disconnection of old connectors and connecton of new connectors)
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of level sensors/relays of DA lub oil tank, dirty water/bilge water tank, used oil tank, DA lub oil stowage tank and GT oil stowage tank.
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of Limit switches on RG and Link Shaft
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of Boost Door Limit switches
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of PDK relays for fire main and KRAB
Service and Material - Repair/Refurbishment of Scoop Valve micro switches including connection and disconnection of cable and periodic checks onboard to ascertain state
Service and Material - Pre-Refit checks of flood alarm system including amplifier and sensors
Service and Material - Repair/Refurbishment of flooding amplifier including connection and disconnection of cable during dry docking and periodic checks onboard to ascertain state.
Service and Material - Repair/Refurbishment of flooding sensors including connection and disconnection of cable
Service and Material - Removal, Repair/Refurbishment Calibration and Re-installation of GT fuel pressure relays (Includes disconnection of old connectors and connection of new connectors
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of Pressure Gauges of type MKY
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-Installation of pressure Alarms/Indicating devices of type MCT/MCTb (Includes disconnection of old connectors and fitment, connection of new connectors) fitment.
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-Installation of GT parameters pressure sensors of type ID/IDT
Service and Material - Removal, Repair/Refurbishment, calibration and Re-installation of Hydraulic pressure sensor of type MID and KD140 indicator (Includes disconnection of old connectors and fitment, connection of new connectors)
Service - Insulation checks of all the works related to serial 19 to 87 of this list and rectification of defect
Service - Proving of Interlocks Checks to GTTT before Cold Start of all GTs and RG
Service - GT Protection checks as GTTT Guidelines before Cold Start of GTs and proving it to GTTT
Service - STW checks of all equipment and systems related to serial 19 to 89 as per GTTT guideline and proving to GTTT
Service - Offering HATs and SATs to the trial teams FOR ALL GT AND RG
Service - Rectification of control defects after HATs and SATs FOR ALL GT AND RG
Service - GT pre start checks FOR ALL GT AND RG
Service - De-Preservation of GTs FOR ALL GT AND RG
ORION - Job Scope 3 (RM.0789) Vendor to quote for services including materials
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW FILTERS IN THE HYDRAULIC TANK. PRECAUTIONS :- A) SS TO ENSURE FILTERS ARE NEATLY PACKED IN CLEAN POLYTHENE BAGS ALL THE TIME WHEN TAKEN OUT FOR CLEANING. B) TO ENSURE THAT OUTLET OF THE FILTER IS PLUGGED WHILE CLEANING. C) SS TO SEAL OFF WITH CLEAN PLASTIC SHEET THE HYDRAULIC TANK FILTER PORTIONS.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - REPLACE (WITH NEW) HYDRAULIC UNITS OF HYDRAULIC PANEL (MANDATORY REPLACEMENT).
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CARRY OUT ADJUSTMENT OF SAFETY VALVE AND REDUCERS AS PER OPERATING INSTRUCTIONS. A) SAFETY VALVE OF PUMPING STATION - 15 MPA + 0.5 MPA (155 KG/CM2). B) REDUCERS ON THE CONTROL PANELS OF MAIN ENGINE - 06 MPA + 0.5 MPA (60 KG/CM2).
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CARRY OUT DEFECT SURVEY OF HYDRAULIC SECTION OF SYSTEM IN ACCORDANCE WITH ORION MICE RTDL - 16, SL.NO. 48 - 62.1.100.025 PCI.CHECK FOLLOWING :- A) BY VISUAL INSPECTION, THE STATE OF INDIVIDUAL ASSEMBLIES AND MECHANISM. B) STATE OF PAINT AND COATINGS. C) STATE OF FASTENERS. D) AIR TIGHTNESS OF NIPPLE JOINTS OF PIPELINES AND HIGH PRESSURE HOSES FOR ABSENCE OF LEAKAGE OF THE WORKING LIQUID. E) STATE OF AXLES, PINS AND ACTUATORS FOR ABSENCE OF PLAY. F) CONDITION OF EARTHING, HYDRAULIC FITTINGS AND SECURING MECHANISM. G) TEST THE SYSTEM FOR STRENGTH TO DETERMINE CRACKS AND QUALITY OF PARTS TO A PRESSURE OF 225 KG/CM2. RENEW PIPES AS NECESSARY.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CHECK AND ADJUST PRESSURE REDUCING VALVES TO 06 Mpa
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - OPEN AND CLEAN HYRAULIC TANK. INSPECT HYDRAULIC TANK INTERNALLY FOR ANY CORROSION AND EROSION.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ON COMPLETION OF DEFECT SURVEY, CARRY OUT OVERHAUL OF ORION HYDRAULIC SYSTEM AND ASSOCIATED EQUIPMENT IN ACCORDANCE WITH RTDL-16 SL. NOS. 45 AND 48, SECTION 3 TO 6. RENEW HYDRAULIC COMPONENTS FOUND DEFECTIVE DURING THE DEFECT SURVEY.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ON COMPLETION OF FLUSHING THROUGH, CARRY OUT FITMENT AND TESTING OF COMPLETE HYDRAULIC SYSTEM AND ACTUATING MECHANISM IN ACCORDANCE WITH RTDL-16, S.NO - 48, CHAPTER - 7. NOTE :- CHECKING OF HYDRAULIC SECTION OF SYSTEM FOR FUNCTIONING AND CHECKING OF TIME CHARACTERISTICS OF THE SYSTEM ARE CARRIED OUT IN ACCORDANCE WITH OPERATING INSTRUCTIONS OPNOH-MICE - ORION-MICE , SL.NO.48 TOGETHER WITH ELECTRICAL SECTION SL. NO. 45.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - OVERAUL, REFIT AND RESET SAFETY VALVE ON PUMP PACKAGE.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW HYDRAULIC OIL AND CARRY OUT FLUSHING THROUGH OF HYDRAULIC SYSTEM WITH A PORTABLE KIT SO AS TO ACHIEVE OIL STANDARD OF 10 MICRONS AND PRESSURE TEST TO PROVE SYSTEM TO 190 KG/CM2.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW THE FOLLOWING (MANDATORY REPLACEMENT) :- A) MICRO SWITCH BLOCKS OF ACTUATORS B) MICRO SWITCHES OF STOP PANEL C) PACKING RINGS OF ACTUATORS D) FASTENERS HAVING DEFECTIVE COATING AND MECHANICAL DEFECTS. E) PARTS OF MOVABLE JOINTS OF ACTUATORS HAVING CLEARANCES. F) DEFECTIVE/DAMAGED SECTIONS OF PIPELINES
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - WITHDRAW WORKING FLUID SAMPLE AND TEST FOR ABSENCE OF MECHANICAL IMPURITIES AFTER CHECKING THE SYSTEM FOR FUNCTIONING.CARRY OUT FLUSHING THROUGH AND REPAIRS OF ORION HYDRAULIC SYSTEM VIEW MINOR LEAKAGE IN SYSTEM..(SS LETTER OF SPECIFIC DEFECT 302/MR DATED 14 JUL 17 IS RELEVANT)
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - PROVE SYSTEM FUNCTIONALITY BY OFFERING TRIALS TO GTTT
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ORION OIL LEAKAGE OBSERVED FROM THE PORTS OF 4/2 VALVE CAUSING INAPPROPRIATE OPERATION. UNDERTAKE REPAIR AND PROVE SERVICABILTY CHECKS OF 4/2 VALVES, "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE SERVICABILTY CHECKS OF ORION TIMING OF ALL GTs AND PROVE TIMING FROM IDLE TO 0.2 N NOT WITHIN THE LIMITS (ABOVE 90 SEC)
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE OVERHAULING OF ORION PUMP VIEW PUMP DRAWING HIGH CURRENT.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE REAPIRS/ SERVICEABILITY CHECKS OF 27V ACOS OF ORION MOTOR IN VIEW OF ABNORMAL NOISE. "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - "UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF ORION PRESSURE RELAYS "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE MANUFACTURING OF HYDRAULIC SYSTEM BLANKS AS PER SAMPLE TO PREVENT SYETM CONTAMINATION
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE MANUFACTURING OF BLANKS OF ORION HYDRAULIC SYSTEM AS PER SAMPLE. MAT- MS.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDETAKE REPAIR AND OVERHAULING OF HYDRAULIC VALVE (2/2 WAY ) IN VIEW OF NON OPS.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - "04 IN NOS 3/4 VALVES OF ORION SYSTEM (FOR SCOOP VALVES) LEAKING. UNDERTAKE REPAIRS AND CALIBRATION FOLLOWED BY SERVICEABILITY CHECKS OF 3/4 WAY VALVES OF ORION SYSTEM RENEW IF REQUIRED "
UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF ORION PUMP CONTROL PANEL VIEW ABNORMAL NOISE AND TRIPPING OF ORION PUMP SUPPLY. "
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- DISMANTLE PUMP, EXAMINE ALL PARTS. REPLACE (WITH NEW) MOUNTS, CONSUMABLES, SEALS, BEARING AND WORN PARTS.
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE AND CALIBRATE PRESSURE GAUGES.
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- CARRY OUT SURVEY OF PUMP FOUNDATION AND RENEW FOUNDATION STIFFENERS AND SUPPORTING RIBS.
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE SAFETY RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING PRESSURE.
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE S.V. MOUNTS.
UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- OFFER PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. TO GTTT
GT Controls & Orion Spares list – Scope 4 (RM.0789) Vendor to quote for materials only
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-(P)B(E)(P)0-15-250-0 CABLE/CORD/WIRE IGNITION HEAT RESISTANT (P)B(E)(P)0-15-250-0
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-AKC-020-01 COMPENSATOR AUTOMATIC WITH INDIVIDUAL
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-KH(P)E-T-7X1 CABLE/CORD/WIRE KH(P)E-T 7x1 OMM2
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-TXA-1172 THERMO COUPLES INDIVIDUAL SPTA SET TXA-1172
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(B)AY(I)408-744-005 CONTROL PANEL
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-1B FUSE LINK HOLDER (D)B(P)4-1B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-2B FUSE LINK HOLDER (D)B(P)4-2B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-3B HOLDER FOR FUSE LINK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)KK(P)H-20M-28B-6A MICRO SWITCH
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(G)P(P)M1-45(G)(P)2-B SOCKET
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(I)(D)-240 MANOMETER/PRESSURE GAUGE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(R)(G)-6-3 HYDRAULIC REGULATOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(SH)P(G)28(G)7(E)(SH)7 PLUG (SH)P(G)28(G)7(E)(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-076098004 CONTROL STATION BE/DPKH
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PM(D)T18K-(P)H4(G)5B1B RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PTT-60KPH45G36B RECEPTACLE 2PTT60KPH45G36B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PTT20(B)3W-5B PLUG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-032-012 UNIT 2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-032-012-01 UNIT 6
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-072-004 UNIT 5
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-087-020 UNIT 3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-122-003 UNIT 7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-149-002 UNIT 8
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-157-003 UNIT 9
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-173-009 UNIT 4
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-182-532 UNIT 1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1100 PIPE HIGH PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1200 PIPE HIGH PRESSURE LENGTH-1200
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1400 PIPE HIGH PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:500 PIPE HIGH PRESSURE LENGTH-500
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2087-03 REDUCER HYDRAULIC RG-3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-291 ELEMENT FILTER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3032-01 DISTRIBUTOR THREE-WAY CONTRO TWO PISITION WITH ELECTRO MAGN
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3048-01 DISTRIBUTOR ELECTROMAGNETIC WITH HYDRAULIC PILOT
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3077-01 DISTRIBUTOR THREE-WAY CONTRO TWO POSITION SOLENOID
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-16 RELAY PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-2-087-003 BLOCK POWER SUPPLY
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-4-568-000 RELAY UNIT (Be) (Pe)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-032-011 AMPLIFIER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-150-000-07 PANEL RESTRICTOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-154-013(E)3 GAS TURBINE ENGINE CONTROL UNIT (B)Y (G)T(D)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-624-039-020 ACTUATOR MECHANISM
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384151979 RECEPTACLE C(SH)R60P45E(SH)3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384152138 PLUG C(SH)RG60P45E(SH)3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384152625 RECEPTACLE (SH)R28P2E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384153152 PLUG (SH)RG28P2E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384153155 PLUG (SH)RG20P3E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384581657 PLUG RPI4-30-V
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758-725-002 ALARM
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758-725-003 SWITCH BOARD
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758725 POWER SUPPLY BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-1-0-5A FUSE B(P)1-1,0.5A
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-1-250B FUSE LINK BPI.1B.1.0A 250B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B1500-T4-T3:0-250 HPC RPM INDICATOR (0 TO 250)X100
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)32B10 PLUG 2PTT32G10SH15B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)32KP10-9 RECEPTACLE 2PTT32KPH10G15B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)Y SUB UNIT (TIMER CARD C(D)Y) 7-102-014
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(G)-24-1-2 LAMP C(G)-24-1-2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-12X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 12X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-19X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 19X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-27X1 CABLE 27 CORE SCREENED
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-30X1 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 30X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-48X1 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 48X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-19X1.5 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 19X1.5
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-27X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 27X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-7X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 7X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CCY SUB UNIT (TIMER CARD CCY) 7-102-015
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CT(P)-082 SELF BALANCING POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-H-400 OSTK TEMP SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KHP(E)-T-2X1 CABLE EP RUB.INSU.HEAT,OIL&PETROL PROOF CSP RUB.SHTNG.2X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KPM-80D-4M RELAY COMBINATION KPM OM5 80D-4M
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KPM-TM5-OM5-45-DEG COMBINATION RELAY 45 DEG.CAPILLARY LENTH 4MTRS.
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-MCT-80 MANOMETER/PRESSURE GAUGE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P(F)4-500-408(P)2 RELAY P(E)C-47
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P79098010-11 TURBINE OVER SPEED GOVERNOR TRANSDUCER PTOG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P79098010-12 TURBINE OVER SPEED LIMITER FOR BOOST ENGINE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-PHD-1 RELAY PRESSURE WITH SETTING 1KGF CM2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-PHT-1:55C-125C TEMP SENSOR /RELAY 55C-125C
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-TC(P):-50TO+50 TEMP SENSOR (AIR INDUCTION)(-50TO+50)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-TXA-1368M1 TEMPERATURE TRANSDUCER THERMO ELECTRIC TXA-1368 VERSION
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-Y(I)2-240 INDICATOR WITH 2 PLUG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-Y(I)3-3 INDICATOR WITH 3 PLUG
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)(D)T-24 PRESSURE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)(D)T-80 PRESSURE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)CT-2 TACHOM.INDICATOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(R)1820/(I)T4 ADDITIONAL RPM UNIT FOR HPC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)1480/(I)T4 TACHOMETER CONVERTER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)1480/(I)T4O(B)XM(I)H DIGITAL RPM INDICATOR FOR HPC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)P20(P)4H(SH)8 SOCKET
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098002-01 CONTROL STATION
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098003 CONTROL STATION
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098005 BUSHESAUTOSWITCH
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098024 SIGNALLING BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-2PTT28K(P)H7(G)11B RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-758-725-004 STORAGE LOCATION BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-CKHA-22-2A IGNITION UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-KC-429M1 EL.BOX
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-MCT-25 PRESSURE SIGNALL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-MCTB-0.3 PRESSURE SIGNALL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P(P)10-22 RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P76098128 RELAY UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P76098130 POWER SUP. UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-PT(I)-012 TEMP.PULSE REGUL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-PYM-1 OIL LEVEL RELAY
GT RECTIFIER RUSSIAN EA6330B-1.502535 POTENTIOMETER 4.7KOHM 10%
GT RECTIFIER RUSSIAN EA6330B-NB0706100079 POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-12 RELAY PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-13 RELAY PRESSURE PPC-45/65-1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2471-02 FILTER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3027-01 DISTRIBUTOR THREE-WAY CONTRO TWO POSITION SOLENOID
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2187-01 VALVE THROTTLE DK-4-1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CT(P)-082 SELF BALANCING POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098005 BUSHESAUTOSWITCH
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098024 SIGNALLING BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-M76098001 CHIP DETECTOR CONTROL UNIT B YCC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098200 TIME UNIT
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-587-182-129 VALVE STOP STRAIGHTWAY WITH ELECTRIC DRIVE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-077518001 PNEUM.MANIPULAT.
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-076518001 PNEUMATIC MANIPULATOR LOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-25MA EL.MAGNETIC COCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-Y(I)2-24 PRESSURE METER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-C(P)O(E)B(E)-2X1 CABLE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-3X1 CABLE THREE CORE SCREENED
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-4X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 4X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-5-0A FUSE LINK B(SH)1-5.0A 250 V
GT CONTROL – Scope of work 1 (RM.0788) Vendor to quote for services including materials
FUEL BOOST PUMP (GT) AFT ENGINE ROOM/FWD ENGINE ROOM UNDERATKE OVERHAUL OF FUEL BOOST PUMP (QTY 03) AS FOLLOWS: - RENEW AND CALIBRATE PRESSURE GAUGES.
GT/RG LUB OIL SEA WATER COOLING SYS -FER & AER CARRY OUT THE MAJOR OVERHAUL OF THE GT/ RG COOLING SYSTEM (DD RELATED) AS FOLLOWS:- OVERHAUL POSITION TRANSMITTER. FOR ALL GT RG COOLERS
BOOST GT EXHAUST HYDRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - REPLACE AND CALIBRATE PRESSURE GAUGES.
BOOST GT EXHAUST HYADRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - REMOTE OPERATION OF BOSST DOORS NOT AVAILABLE FROM MCR CCC PANEL.UNDERTAKE COMPLETE OVERHAUL OF BOOST EXHAUST DOOR CIRCUITARY AND ASSOCIATED CONTROL CONPONENTS. REPLACE CONSUMABLES, SEALS, WORN OUT PARTS
BOOST GT EXHAUST HYADRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - ABNORMAL NOISE AND VALVE STRUCKING UP OBSERVED DURING OPENING AND CLOSING OF BOOST EXHAUST DOOR. OVERHAUL OF CHECK VALVE AND 2/2 VALVE OF BOOST EXHAUST HYDRAULIC SYSTEM.
BOOST GT EXHAUST HYADRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - UNDERTAKE REPAIR AND OVERHAULING OF 4/3 WAY VV OF BOOST GT DOOR HYDRAULIC SYSTEM
BOOST GT EXHAUST HYADRAULIC SYSTEM - ASP UNDERTAKE FOLLOWING ON BOOST GT EXHAUST HYDRAULIC SYSTEM: - UNDERTAKE CALIBRATION OF HYDRAULIC SYSTEM PRESSURE GAUGES VIEW GAUGES MALFUNCTIONING. RANGE: 0-250 KGF/CM2,
MGT INTAKE - FER/AER REPLACE AND OPERATIONALISE AMBIENT AIR TEMP INDICATOR (04 GAUGES, CABLE FROM CCCP TO ALL 04 GT INTAKES AND 04 SENSOR).
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES ALONG WITH SENSORS. RENEW 50% QUANTITY VIEW DEFECTIVE
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REMOVE OLD CONTROL EQUIPMENT, OVERHAUL/REFURBISH AND REFIT CONTROL UNITS (FIT NEW CONTROL UNITS IN CASE OF NEW UNITS RECEIVED WITH NEW GT/RGs) POST REPLACEMENT OF NEW GTs (02 NO) AND NEW RGs (02 NO). REF DOCUMENT SEACAL.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REMOVE AND OVERHAUL AND REFIT CONTROL EQUIPMENT OF OLD GTA UNITS (02 GTs AND 02 RGs) REF DOCUMENT SEACLs
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- OVERALL AND CALIBRATION OF 06 SETS OF GT FUEL EQUIMENTS COMPRISING OF THE FOLLOWING IN EACH SET:- (A) FUEL BURNERS (B) PLUNGER TYPE FUEL PUMP (C) AUTO FUEL CONTROL UNIT (D) DRAIN VALVE (E) EMERGENCY DRAIN VALVE (F) STARTING VALVE (G) STOP COCK (H) THROTTLE COCK (J) FLOW DIVIDER (K) VALVE BLOCK (L) IGNITER INJECTOR (M) PRESSURE RISE LIMITER - (FOR BOOST GTs ONLY) (N) FLOW RISE LIMITER - (FOR CRUISE GTs ONLY) (P) FUEL FILTER
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- I.A.W GTTT (MBI)/ SEACLS UNDERTAKE STW OF COMPLETE GT AGGREGATE AND OFFER TO GTTT (MBI), IN STAGES AS MENTIONED IN SEACLS VIZ. (A) COMPLETE CONTINUITY CHECKS OF CABLING, (B) INSTRUMENTATION AND CONTROL INSTALLATION INSPECTION, (C) INSULATION CHECKS WITH CCC PANEL CONNECTED TO EACH GT/ RG (D) CONNECTORISATION CHECKS (E) FUNCTIONAL CHECKS (F) INTERLOCK CHECKS (G) COLD AND HOT PROTECTION CHECKS (H) SEA TRIAL REGIMES AS RECOMMENDED BY GTTT(MBI).
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- OVERHAULING OF GT STARTER DC MOTORS (90V DC)
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- UNDERTAKE REAPIRS AND PROVE SERVICEABILITY CHECKS OF. CTP PANEL IN VIEW OF FAULTY INDICATION.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "DE-COUPLER OF SBGT MALFUNCTIONING. UNDERTAKE CIRCUIT CHECK AND REPAIR OF SBGT DE-COUPLER
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- SERVICECIBILITY CHECKS OF 05 IN NOS POWER BLOCKS.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- MANUFACTURING OF 02 IN NOS SECURING ARRANGEMENTS FOR FITMENT OF SHAFT RPM INDICATOR AT BRIDGE WINGS.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF SCRG FROM RELAY TO JUNCTION BOX:- (A) RG TEMP OUT , (B) RG TEMP IN, LENGTH- 10 MTR
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF PCRG FROM RELAY TO JUNCTION BOX:- (A) - (D)(B)(P) THROW OVER GEAR TRANSDUCER , (B) - (D)(C)2- 2ND SPEED BRAKE TRANSDUCER TO THEIR JUNCTION BOXES- LENGTH 5 MTR EACH.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF PERISHED CABLES OF FOLLOWING SENSORS OF PBRG FROM RELAY TO JUNCTION BOX:- (A) RG TEMP OUT- LENGTH 10 MTR
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT AND RESOLDERING OF DAMAGED CONNECTOR-3KC(P)- 10 PIN CONNECTOR OF PCRG, ALONG WITH REPLACEMENT OF CABLE FROM JUNCTION BOX TO THIS CONNECTOR.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPLACEMENT OF DAMAGED CABLE OF PCGT, PTR FROM PTR TO POWER SUPPLY UNIT. LENGTH- 20 MTR.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPAIR OF 04 IN NO. POWER BLOCK AND 11 IN NO. RELAY BLOCK
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- REPAIR OF 10 IN NO. POWER BLOCK AND 10 IN NO. RELAY BLOCK.
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "LPC TACHOMETER OF PCGT MALFUNCTIONING. UNDERTAKE CALIBRATION AND SERVICEABILITY CHECKS. RENEW IF REQUIRED. "
MAIN GAS TURBINE AGGREGATE(M-15E GTA) CONTROLS - E/R UNDERTAKE OVERHAUL/ ROUTINES OF GTA CONTROLS THROUGH OUT THE SHIP AS FOLLOWS:- "PCGT HPC RPM TACHOMETER MALFUNCTIONING. UNDERTAKE CALIBRATION AND SERVICEABILITY CHECKS RENEW IFREQUIRED. "
MAIN RG CRUISE / BOOST (ZORYA - M15) - AER/ FER UNDERTAKE OVERHAUL/ ROUTINES OF MAIN RGs AS FOLLOWS:- CALIBRATE ALL PRESSURE AND TEMPERATURE GAUGES ALONG WITH SENSORS. REPLACE 50% QUANTITY VIEW DEFECTIVE.
MGT STARTING & TURNING SYSTEM (CRUISE/ BOOST-1241RE) - AER/ FER CALIBRATE ALL PRESSURE GAUGES. REPLACE DEFECTIVE
MGT FUEL OIL SYSTEM (GT CRUISE/ BOOST) - AER/FER CARRY OUT FUNCTIONAL CHECKS OF CONTROL INSTRUMENTATION. REPLACE IF REQUIRED.
BAKC RECTIFIER - (BAKC-7-30) FWD ENGINE ROOM OVERHAUL THE RECTIFIER AND CHANGE CONSUMABLES, DEFECTIVE DIODES NO - 10 NO, TRANSFORMERS - 4 NO, FILTERS - 04 NO ETC REFURBISH INTERNAL WIRING
BAKC RECTIFIER - (BAKC-7-30) FWD ENGINE ROOM CARRY OUT LOAD-TRIALS
BAKC RECTIFIER - (BAKC-7-30) FWD ENGINE ROOM UNDERTAKE REPAIRS AND PAINTING OF RECTIFIER CABINET (SIZE 2FTX2FTX1FT)
BAKC RECTIFIER - (BAKC-7-30) FWD ENGINE ROOM REPLACE AND CALIBRATION OF AMMETER (0-30 AMP) AND VOLTMETER (22-40 VDC) VIEW OF SHOWING ERRATIC VALUE.
BAKC RECTIFIER - (BAKC-7-30) FWD ENGINE ROOM RENEWAL OF SHOCK MOUNT
MISSILE RECTIFIER - (BAK(E)(P)-22-28-5PBM) AFT ENGINE ROOM/ FWD ENGINE ROOM OVERHAUL THE RECTIFIER AND CHANGE CONSUMABLES, DEFECTIVE DIODES NO - 20 NO, TRANSFORMERS - 4 NO, FILTERS - 04 NO ETC REFURBISH INTERNAL WIRING
MISSILE RECTIFIER - (BAK(E)(P)-22-28-5PBM) AFT ENGINE ROOM/ FWD ENGINE ROOM CARRY OUT LOAD-TRIALS AT SPECIFIED VALUE.
GT CONTROL – Scope of work 2 (RM.0788) INSTALLATION OF MAIN GAS TURBINE AGGREGATE - 1241 RE CLASS OF SHIP Vendor to quote for services including materials
Service and Material - De-gutting/Re-gutting of GT starting rectifier
Service and Material - Remove chain and motor of shaft RPM measurement system and take custody of it
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of OSTK temp. Relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/ Refurbishment, calibration and re-installation of Adaptor temp. Relay with sensor (includes disconnection old connectors & fitment, connection of new connection)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of GT inlet temp. Relay (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of GT parameters combined gauge with sensor
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of RG inlet temp 500 (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/refurbishment, calibration re-installation of RG outlet Temp 800 (includes disconnection old connectors & fitment, calibration of new connectors
Service and Material - Removal, Repair/refurbishment, calibration, re-installation of GT lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration, re-installation of RG lub oil tank level relay with sensor (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, calibration and re-installation of Ambient temp. Intake indicator with sensor (includes disconnection & connection of connectors/wiring)
Service and Material - Removal, Repair/refurbishment, calibration and re-installation of cruise GT HPC RPM indicators (MCR & Bridge) and A/D convertor (includes disconnection & connection of new connectors/wiring)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of fuel tank level relay (includes disconnection old connectors & fitment, connection of new connectors)
Service and Material - Removal, Repair/Refurbishment, calibration and re-installation of Cruise GT LPC/PT RPM Indicator with Generators (Port & Stbd) (includes disconnection & connection of connectors/wiring)
Service and Material - Removal, Repair/Refurbishment, calibration and Re-installation of Boost GT HPC/LPC/PT RPM indicator with Generators (Port & Stbd) (includes disconnection & connection of connectors)
Service and Material -Removal, Repair/Refurbishment, calibration and Re-installation of shaft speed indicators and Tacho Generator (includes disconnection & connection of connectors/ wiring connection)
Service and Material - Removal, Repair/Refurbishment, testing and Re-installation of CTP and KC 429 (includes disconnection & connection of connectors/wiring connections)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of PTR (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of LPT Exhaust temperature indicators (local, MCR & Bridge) (includes disconnection & Connection of wiring connections)
Service and Material - Removal , Repair/Refurbishment, testing and re-installation of ORT unit (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/ Refurbishment, testing and Re-installation of BCO unit with sensor (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of ABM unit with sensor (includes disconnection & connection of connectors)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of AKC 20 with sensor
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of control station for cruise & Boost GT (including all 15 Relay/ Timer /Pwer Blocks) (includes disconnection & connection of connectors)
Service and Material - Internal connection of contactor box (kk)
Service and Material - Removal, Repair/Refurbishment, testing and Re-installation of chip detector relay block
Service and Material - Removal, Repair/refurbishment, testing and re-installation of chip detector sensor
Service and Material - Removal, Repair/refurbishment, testing and Re-installation of Chip detector indication & monitoring unit
CCC PANEL BLOCKS:- Service and Material - Removal, Repair/Refurbishment, testing and re-installation of relay Blocks (BR)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of power Blocks (BP)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Main Gas Engine control Unit (BYGTG)
Service and Material - Removal, Repair/refurbishment, testing and re-Installation of Auto control Unit (BA)
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Amplifier cards (YC)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Follow-up Control sub Unit (CCY)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Remote Control sub Unit
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Scoop & Emergency valve relay Unit
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Throttle control lever (MCR & Bridge)
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Actuating Mechanism
Service and Material - Removal, Repair/refurbishment, testing and re-installation of Reversing Manipulator
Service and Material - Removal, Repair/Refurbishment, testing and re-installation of Reversing Indication Unit
Service and Material - Removal, overhauling (includes Painting), testing, tuning, fitment onboard of orion Hydraulic GT Control panels (includes testing of individual components) (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of scoop control panel (includes setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes painting), testing, tuning, fitment onboard of pump control panel (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes painting), testing, tuning, fitment onboard of Emergency control panel (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal , Overhauling (includes Painting), testing, tuning, fitment onboard of actuator mechanism (including setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of pressure reducer panel of scoop valve
Service and Material - Removal, Overhauling (includes Painting), testing, tuning, fitment onboard of Boost Door Control Panel (including Setting of work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal, overhauling (includes Painting), Testing, Tuning, Fitment onboard of locking, unlocking hydraulic panel of Boost Door ( Including Setting to work, Proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Overhauling, Testing, Tuning of scoop valve (Including Fire Main Valves) (Including Setting to work, proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Removal and Fitment of scoop valve (Including Fire Main Valves)
Service and Material - Removal, Overhauling, Fitment and onboard tuning of Tie Rod of fuel rack (including Setting to work, Proving onboard in situ as per technical standard promulgated by GTTT)
Service and Material - Flushing through and pressure testing of Hydraulic Pipes onboard
Service and Material - Setting to work of MCR Throttle to actuator mechanism for all four GT
Service and Material - Setting to work of actuator mechanism to fuel rack/valve for all four GT
Service and Material - Proving and STW of Orion Timing in FC and RC mode for all four GT
Service and Material - Connections of Starter on all four GTs
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of GT parameters combined gauge with pressure sensors
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of Condensate tank level relay (Includes disconnection of old connectors and connecton of new connectors)
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of level sensors/relays of DA lub oil tank, dirty water/bilge water tank, used oil tank, DA lub oil stowage tank and GT oil stowage tank.
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of Limit switches on RG and Link Shaft
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of Boost Door Limit switches
Service and Material - Removal, Repair/Refurbishment, Testing and Re-installation of PDK relays for fire main and KRAB
Service and Material - Repair/Refurbishment of Scoop Valve micro switches including connection and disconnection of cable and periodic checks onboard to ascertain state
Service and Material - Pre-Refit checks of flood alarm system including amplifier and sensors
Service and Material - Repair/Refurbishment of flooding amplifier including connection and disconnection of cable during dry docking and periodic checks onboard to ascertain state.
Service and Material - Repair/Refurbishment of flooding sensors including connection and disconnection of cable
Service and Material - Removal, Repair/Refurbishment Calibration and Re-installation of GT fuel pressure relays (Includes disconnection of old connectors and connection of new connectors
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-installation of Pressure Gauges of type MKY
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-Installation of pressure Alarms/Indicating devices of type MCT/MCTb (Includes disconnection of old connectors and fitment, connection of new connectors) fitment.
Service and Material - Removal, Repair/Refurbishment, Calibration and Re-Installation of GT parameters pressure sensors of type ID/IDT
Service and Material - Removal, Repair/Refurbishment, calibration and Re-installation of Hydraulic pressure sensor of type MID and KD140 indicator (Includes disconnection of old connectors and fitment, connection of new connectors)
Service - Insulation checks of all the works related to serial 19 to 87 of this list and rectification of defect
Service - Proving of Interlocks Checks to GTTT before Cold Start of GTs
Service - GT Protection checks as GTTT Guidelines before Cold Start of GTs and proving it to GTTT
Service - STW checks of all equipment and systems related to serial 19 to 89 as per GTTT guideline and proving to GTTT
Service - Offering HATs and SATs to the trial teams for all GT and RG
Service - Rectification of control defects after HATs and SATs
Service - All GT pre start checks
Service - De-Preservation of all GTs
ORION - Job Scope 3 (RM.0788) Vendor to quote for services including materials
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW FILTERS IN THE HYDRAULIC TANK. PRECAUTIONS :- A) SS TO ENSURE FILTERS ARE NEATLY PACKED IN CLEAN POLYTHENE BAGS ALL THE TIME WHEN TAKEN OUT FOR CLEANING. B) YARD TO ENSURE THAT OUTLET OF THE FILTER IS PLUGGED WHILE CLEANING. C) SS TO SEAL OFF WITH CLEAN PLASTIC SHEET THE HYDRAULIC TANK FILTER PORTIONS
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW HYDRAULIC UNITS OF HYDRAULIC PANEL (MANDATORY REPLACEMENT).
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CARRY OUT ADJUSTMENT OF SAFETY VALVE AND REDUCERS AS PER OPERATING INSTRUCTIONS. A) SAFETY VALVE OF PUMPING STATION - 15 MPA + 0.5 MPA (155 KG/CM2). B) REDUCERS ON THE CONTROL PANELS OF MAIN ENGINE - 06 MPA + 0.5 MPA (60 KG/CM2).
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CARRY OUT DEFECT SURVEY OF HYDRAULIC SECTION OF SYSTEM IN ACCORDANCE WITH ORION MICE RTDL - 16, SL.NO. 48 - 62.1.100.025 PCI.CHECK FOLLOWING :- A) BY VISUAL INSPECTION, THE STATE OF INDIVIDUAL ASSEMBLIES AND MECHANISM. B) STATE OF PAINT AND COATINGS. C) STATE OF FASTENERS. D) AIR TIGHTNESS OF NIPPLE JOINTS OF PIPELINES AND HIGH PRESSURE HOSES FOR ABSENCE OF LEAKAGE OF THE WORKING LIQUID. E) STATE OF AXLES, PINS AND ACTUATORS FOR ABSENCE OF PLAY. F) CONDITION OF EARTHING, HYDRAULIC FITTINGS AND SECURING MECHANISM. G) TEST THE SYSTEM FOR STRENGTH TO DETERMINE CRACKS AND QUALITY OF PARTS TO A PRESSURE OF 225 KG/CM2. RENEW PIPES AS NECESSARY.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - CHECK AND ADJUST PRESSURE REDUCING VALVES TO 06 Mpa
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - OPEN AND CLEAN HYRAULIC TANK. INSPECT HYDRAULIC TANK INTERNALLY FOR ANY CORROSION AND EROSION.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ON COMPLETION OF DEFECT SURVEY, CARRY OUT OVERHAUL OF ORION HYDRAULIC SYSTEM AND ASSOCIATED EQUIPMENT IN ACCORDANCE WITH RTDL-16 SL. NOS. 45 AND 48, SECTION 3 TO 6. RENEW HYDRAULIC COMPONENTS FOUND DEFECTIVE DURING THE DEFECT SURVEY.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ON COMPLETION OF FLUSHING THROUGH, CARRY OUT FITMENT AND TESTING OF COMPLETE HYDRAULIC SYSTEM AND ACTUATING MECHANISM IN ACCORDANCE WITH RTDL-16, S.NO - 48, CHAPTER - 7. NOTE :- CHECKING OF HYDRAULIC SECTION OF SYSTEM FOR FUNCTIONING AND CHECKING OF TIME CHARACTERISTICS OF THE SYSTEM ARE CARRIED OUT IN ACCORDANCE WITH OPERATING INSTRUCTIONS OPNOH-MICE - ORION-MICE , SL.NO.48 TOGETHER WITH ELECTRICAL SECTION SL. NO. 45.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - OVERAUL, REFIT AND RESET SAFETY VALVE ON PUMP PACKAGE.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW HYDRAULIC OIL AND CARRY OUT FLUSHING THROUGH OF HYDRAULIC SYSTEM WITH A PORTABLE KIT SO AS TO ACHIEVE OIL STANDARD OF 10 MICRONS AND PRESSURE TEST TO PROVE SYSTEM TO 190 KG/CM2.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - RENEW THE FOLLOWING (MANDATORY REPLACEMENT) :- A) MICRO SWITCH BLOCKS OF ACTUATORS B) MICRO SWITCHES OF STOP PANEL C) PACKING RINGS OF ACTUATORS D) FASTENERS HAVING DEFECTIVE COATING AND MECHANICAL DEFECTS. E) PARTS OF MOVABLE JOINTS OF ACTUATORS HAVING CLEARANCES. F) DEFECTIVE/DAMAGED SECTIONS OF PIPELINES
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - WITHDRAW WORKING FLUID SAMPLE AND TEST FOR ABSENCE OF MECHANICAL IMPURITIES AFTER CHECKING THE SYSTEM FOR FUNCTIONING.CARRY OUT REPAIR/FLUSHING OF ORION HYDRAULIC SYSTEM VIEW MINOR LEAKAGE IN SYSTEM..(SS LETTER OF SPECIFIC DEFECT 302/MR DATED 14 JUL 17 IS RELEVANT)
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - PROVE SYSTEM FUNCTIONALITY BY OFFERING TRIALS TO GTTT
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - ORION OIL LEAKAGE OBSERVED FROM THE PORTS OF 4/2 VALVE CAUSING INAPPROPRIATE OPERATION. UNDERTAKE REPAIR AND PROVE SERVICABILTY CHECKS OF 4/2 VALVES, "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE SERVICABILTY CHECKS OF ORION TIMING OF ALL GTs AND PROVE TIMING FROM IDLE TO 0.2 N NOT WITHIN THE LIMITS (ABOVE 90 SEC) "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE OVERHAULING OF ORION PUMP VIEW PUMP DRAWING HIGH CURRENT. "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE REAPIRS AND PROVE SERVICEABILITY CHECKS OF 27V ACOS OF ORION MOTOR IN VIEW OF ABNORMAL NOISE. "
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - "UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF ORION PRESSURE RELAYS
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE MANUFACTURING OF HYDRAULIC SYSTEM BLANKS AS PER SAMPLE TO PREVENT SYETM CONTAMINATION
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDERTAKE MANUFACTURING OF BLANKS OF ORION HYDRAULIC SYSTEM AS PER SAMPLE. MAT- MS.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - UNDETAKE REPAIR AND OVERHAULING OF HYDRAULIC VALVE (2/2 WAY ) IN VIEW OF NON OPS.
UNDERTAKE FOLLOWING ROUTINES ORION HYDRAULIC SYSTEM (FWD AND AFT) OF MGT CONTROLS: - "04 IN NOS 3/4 VALVES OF ORION SYSTEM (FOR SCOOP VALVES) LEAKING. UNDERTAKE REPAIRS AND CALIBRATION AND PROVE SERVICEABILITY CHECKS OF 3/4 WAY VALVES OF ORION SYSTEM RENEW IF REQUIRED "
ORION SYSTEM CONTROL UNDERTAKE REPAIRS AND PROVE SERVICEABILITY CHECKS OF ORION PUMP CONTROL PANEL VIEW ABNORMAL NOISE AND TRIPPING OF ORION PUMP SUPPLY. "
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- DISMANTLE PUMP, EXAMINE ALL PARTS. RENEW MOUNTS, CONSUMABLES, SEALS, BEARING AND WORN PARTS.
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE AND CALIBRATE PRESSURE GAUGES.
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- CARRY OUT SURVEY OF PUMP FOUNDATION AND RENEW FOUNDATION STIFFENERS AND SUPPORTING RIBS.
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE SAFETY RELIEF VALVE. CARRY OUT FUNCTIONAL TEST AND RESET TO SPECIFIED LIFTING PRESSURE.
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- REPLACE S.V. MOUNTS.
ORION PUMP AER PORT UNDERTAKE OVERHAUL OF ORION HYDRAULIC PUMP AS FOLLOWS:- OFFER PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS(SUCTION/ DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION AND SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. TO GTTT
GT Controls & Orion Spares list – Scope 4 (RM.0788) Vendor to quote for materials only
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-(P)B(E)(P)0-15-250-0 CABLE/CORD/WIRE IGNITION HEAT RESISTANT (P)B(E)(P)0-15-250-0
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-AKC-020-01 COMPENSATOR AUTOMATIC WITH INDIVIDUAL
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-KH(P)E-T-7X1 CABLE/CORD/WIRE KH(P)E-T 7x1 OMM2
GT ORION CONTROL SYSTEM RUSSIAN SR1199D-TXA-1172 THERMO COUPLES INDIVIDUAL SPTA SET TXA-1172
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(B)AY(I)408-744-005 CONTROL PANEL
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-1B FUSE LINK HOLDER (D)B(P)4-1B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-2B FUSE LINK HOLDER (D)B(P)4-2B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)B(P)4-3B HOLDER FOR FUSE LINK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(D)KK(P)H-20M-28B-6A MICRO SWITCH
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(G)P(P)M1-45(G)(P)2-B SOCKET
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(I)(D)-240 MANOMETER/PRESSURE GAUGE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(R)(G)-6-3 HYDRAULIC REGULATOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-(SH)P(G)28(G)7(E)(SH)7 PLUG (SH)P(G)28(G)7(E)(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-076098004 CONTROL STATION BE/DPKH
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PM(D)T18K-(P)H4(G)5B1B RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PTT-60KPH45G36B RECEPTACLE 2PTT60KPH45G36B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-2PTT20(B)3W-5B PLUG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-032-012 UNIT 2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-032-012-01 UNIT 6
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-072-004 UNIT 5
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-087-020 UNIT 3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-122-003 UNIT 7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-149-002 UNIT 8
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-157-003 UNIT 9
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-173-009 UNIT 4
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-5-182-532 UNIT 1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1100 PIPE HIGH PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1200 PIPE HIGH PRESSURE LENGTH-1200
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:1400 PIPE HIGH PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-557-62-697:500 PIPE HIGH PRESSURE LENGTH-500
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2087-03 REDUCER HYDRAULIC RG-3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-291 ELEMENT FILTER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3032-01 DISTRIBUTOR THREE-WAY CONTRO TWO PISITION WITH ELECTRO MAGN
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3048-01 DISTRIBUTOR ELECTROMAGNETIC WITH HYDRAULIC PILOT
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3077-01 DISTRIBUTOR THREE-WAY CONTRO TWO POSITION SOLENOID
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-16 RELAY PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-2-087-003 BLOCK POWER SUPPLY
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-4-568-000 RELAY UNIT (Be) (Pe)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-032-011 AMPLIFIER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-150-000-07 PANEL RESTRICTOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-62-5-154-013(E)3 GAS TURBINE ENGINE CONTROL UNIT (B)Y (G)T(D)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-624-039-020 ACTUATOR MECHANISM
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384151979 RECEPTACLE C(SH)R60P45E(SH)3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384152138 PLUG C(SH)RG60P45E(SH)3
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384152625 RECEPTACLE (SH)R28P2E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384153152 PLUG (SH)RG28P2E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384153155 PLUG (SH)RG20P3E(SH)7
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-6384581657 PLUG RPI4-30-V
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758-725-002 ALARM
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758-725-003 SWITCH BOARD
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-758725 POWER SUPPLY BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-1-0-5A FUSE B(P)1-1,0.5A
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-1-250B FUSE LINK BPI.1B.1.0A 250B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B1500-T4-T3:0-250 HPC RPM INDICATOR (0 TO 250)X100
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)32B10 PLUG 2PTT32G10SH15B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)32KP10-9 RECEPTACLE 2PTT32KPH10G15B
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(D)Y SUB UNIT (TIMER CARD C(D)Y) 7-102-014
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(G)-24-1-2 LAMP C(G)-24-1-2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-12X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 12X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-19X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 19X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-27X1 CABLE 27 CORE SCREENED
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-30X1 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 30X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-48X1 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 48X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-19X1.5 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 19X1.5
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-27X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 27X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-7X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 7X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CCY SUB UNIT (TIMER CARD CCY) 7-102-015
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CT(P)-082 SELF BALANCING POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-H-400 OSTK TEMP SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KHP(E)-T-2X1 CABLE EP RUB.INSU.HEAT,OIL&PETROL PROOF CSP RUB.SHTNG.2X1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KPM-80D-4M RELAY COMBINATION KPM OM5 80D-4M
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-KPM-TM5-OM5-45-DEG COMBINATION RELAY 45 DEG.CAPILLARY LENTH 4MTRS.
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-MCT-80 MANOMETER/PRESSURE GAUGE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P(F)4-500-408(P)2 RELAY P(E)C-47
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P79098010-11 TURBINE OVER SPEED GOVERNOR TRANSDUCER PTOG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-P79098010-12 TURBINE OVER SPEED LIMITER FOR BOOST ENGINE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-PHD-1 RELAY PRESSURE WITH SETTING 1KGF CM2
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-PHT-1:55C-125C TEMP SENSOR /RELAY 55C-125C
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-TC(P):-50TO+50 TEMP SENSOR (AIR INDUCTION)(-50TO+50)
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-TXA-1368M1 TEMPERATURE TRANSDUCER THERMO ELECTRIC TXA-1368 VERSION
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-Y(I)2-240 INDICATOR WITH 2 PLUG
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-Y(I)3-3 INDICATOR WITH 3 PLUG
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)(D)T-24 PRESSURE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)(D)T-80 PRESSURE SENSOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(I)CT-2 TACHOM.INDICATOR
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(R)1820/(I)T4 ADDITIONAL RPM UNIT FOR HPC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)1480/(I)T4 TACHOMETER CONVERTER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)1480/(I)T4O(B)XM(I)H DIGITAL RPM INDICATOR FOR HPC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-(SH)P20(P)4H(SH)8 SOCKET
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098002-01 CONTROL STATION
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098003 CONTROL STATION
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098005 BUSHESAUTOSWITCH
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098024 SIGNALLING BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-2PTT28K(P)H7(G)11B RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-758-725-004 STORAGE LOCATION BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-CKHA-22-2A IGNITION UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-KC-429M1 EL.BOX
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-MCT-25 PRESSURE SIGNALL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-MCTB-0.3 PRESSURE SIGNALL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P(P)10-22 RECEPTACLE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P76098128 RELAY UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-P76098130 POWER SUP. UNIT
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-PT(I)-012 TEMP.PULSE REGUL
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-PYM-1 OIL LEVEL RELAY
GT RECTIFIER RUSSIAN EA6330B-1.502535 POTENTIOMETER 4.7KOHM 10%
GT RECTIFIER RUSSIAN EA6330B-NB0706100079 POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-12 RELAY PRESSURE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-586-99-042-13 RELAY PRESSURE PPC-45/65-1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2471-02 FILTER
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-3027-01 DISTRIBUTOR THREE-WAY CONTRO TWO POSITION SOLENOID
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-577-99-2187-01 VALVE THROTTLE DK-4-1
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-CT(P)-082 SELF BALANCING POTENTIOMETER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098005 BUSHESAUTOSWITCH
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098024 SIGNALLING BLOCK
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-M76098001 CHIP DETECTOR CONTROL UNIT B YCC
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-076098200 TIME UNIT
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-587-182-129 VALVE STOP STRAIGHTWAY WITH ELECTRIC DRIVE
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-077518001 PNEUM.MANIPULAT.
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-076518001 PNEUMATIC MANIPULATOR LOCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-25MA EL.MAGNETIC COCK
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-Y(I)2-24 PRESSURE METER
GT ORION CONTROL SYSTEM RUSSIAN SZ6032D-C(P)O(E)B(E)-2X1 CABLE
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB(E)-3X1 CABLE THREE CORE SCREENED
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-C(P)OB-T-4X0.75 CABLE IRRA.POLYTHYLENE INSUL.IN LFH SHTNG.SCREENED 4X0.75
GT ORION CONTROL SYSTEM RUSSIAN SR6001D-B(P)1-5-0A FUSE LINK B(SH)1-5.0A 250 V
ANIBA SOLUTIONS PRIVATE LIMITED
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .