Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance ADMIN BLOCK SCINDIA JUNCTION VISAKHAPATNAM ANDHRA PRADESH 530005 | VISAKHAPATANAM | ANDHRA PRADESH | 530005 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
30 Mar 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
RATE CONTRACT FOR DRYDOCKING ALLIED SERVICES AND ROUTINES OF IN VESSELS AND MARINE ASSETS
2021_NAVY_430918_4
COM/0100/RC-WP/HSL
Single
Marine Services
Turn-key
365 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
31 Mar 2021
16 Mar 2021
31 Mar 2021
16 Mar 2021
30 Mar 2021
17 Mar 2021
17 Mar 2021 - 30 Mar 2021
240 days
HULL WORK PACKAGE 00001 Under water Hull (a) Cleaning of Marine fouling, propeller, rudder and underwater gratings to be completed with in 24 hours of docking and readiness for underwater area inspection by HITU(V) is to be intimated to ship staff and ND(V).
00001 Under water Hull (b) Clean underwater portion of hull using hydro jetting with maximum pressure not exceeding 3000 psi and scrap marine growth and loose paint film. This includes up to 500 mm above boot topping area, shaft brackets, rope guards, eddy plates, rudders, sea chests/tubes, bow door and ramp etc.
00002 Under water Hull (a) Carry out abrasive blasting of U/W hull and boot topping area to SA 2½ standard at the areas of paint failure.
00002 Under water Hull (b) Apply one coat of Primer (M/s Jotun / M/s Akzo Nobel / M/s Sigma) immediately on completion of blasting.
00003 Under water Hull Carry out ultra sonic gauge survey of outer underwater hull of machinery spaces.
00004 Under water Hull (a) Carryout 100% Visual hull survey of external underwater hull paying particular attention to plating in the vicinity of propellers, shaft and shaft brackets, rope guards, eddy plates, rudders, fitting up to the rudder head, keel and hull plating rest on closely spaced docking blocks, double bottom tanks, peak tanks for signs of corrosion, defects and damage.
00004 Under water Hull (b) Visual survey of all the bilges to be carried out. NOTE:- Post completion of UW and AW Hull Survey, 07 copies of Survey Report (as per IN Standards) to be made and handed to ND(V)/RMT. Cost for the same (if any) to be covered in the DL
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (a) Cutting of old anodes from hull. Grinding and surface preparation of burnt area and underwater hull painting.
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (b) Welding of new sacrificial anodes on the location of old anodes. NOTE:- Details of various types of Anodes is appended below:- (i) MK-II Sacrificial anodes for UW Shell plate & Ballast tank
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (b) Welding of new sacrificial anodes on the location of old anodes. NOTE:- Details of various types of Anodes is appended below:- (ii) MK-III Sacrificial anodes for UW Sea chest
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (b) Welding of new sacrificial anodes on the location of old anodes. NOTE:- Details of various types of Anodes is appended below:- (iii) MK-V Sacrificial anodes for Rudders
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (b) Welding of new sacrificial anodes on the location of old anodes. NOTE:- Details of various types of Anodes is appended below:- (iv) MK-IV Sacrificial anodes
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (b) Welding of new sacrificial anodes on the location of old anodes. NOTE:- Details of various types of Anodes is appended below:- (v) MK-I Sacrificial anodes
00005 Under water Hull Renew sacrificial anodes wherever consumed more than 50%. Work involves following: (c) Ensure sacrificial anodes are not painted on outer side by covering with grease also ensure grease are cleaned from sacrificial anodes prior undocking. Further, any paint coating over the anodes is to be scraped / cleaned before undocking.
00006 Under water Hull Maintenance painting (a) Excessive areas of breakdown of abrasive anticorrosive paints to be recoated with full paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) post surface preparation of that area. Carry out painting of underwater Hull including Boot top on completion of all hot work, blasting of underwater hull USG survey and prior approval from Navy.
00006 Under water Hull Top coat AF Paint (b) Application of one coat of A/F paint (M/s Jotun / M/s Akzo Nobel / M/s Sigma) on underwater hull and boot top area to be carried out post adequate surface preparation. M/s Jotun underwater paint scheme is to be used. NOTE:- Painting to be carried out under supervision of Paint manufacturer/OEM and guarantee for 10 years to be given to Navy. After application of paint scheme DFT should not be less than 1075 microns which should be ensured before inspection by HITU. LLPS Paint scheme :- (i) 01 coat Primer - Dry Film Thickness- 50 microns.
00006 Under water Hull Top coat AF Paint (b) Application of one coat of A/F paint (M/s Jotun / M/s Akzo Nobel / M/s Sigma) on underwater hull and boot top area to be carried out post adequate surface preparation. M/s Jotun underwater paint scheme is to be used. NOTE:- Painting to be carried out under supervision of Paint manufacturer/OEM and guarantee for 10 years to be given to Navy. After application of paint scheme DFT should not be less than 1075 microns which should be ensured before inspection by HITU. LLPS Paint scheme :- (ii) 02 Coats of Anti corrosive - Dry Film Thickness- 150 microns each coat
00006 Under water Hull Top coat AF Paint (b) Application of one coat of A/F paint (M/s Jotun / M/s Akzo Nobel / M/s Sigma) on underwater hull and boot top area to be carried out post adequate surface preparation. M/s Jotun underwater paint scheme is to be used. NOTE:- Painting to be carried out under supervision of Paint manufacturer/OEM and guarantee for 10 years to be given to Navy. After application of paint scheme DFT should not be less than 1075 microns which should be ensured before inspection by HITU. LLPS Paint scheme :- (iii) 01 Coat Tie coat - Dry Film Thickness- 125 microns.
00006 Under water Hull Top coat AF Paint (b) Application of one coat of A/F paint (M/s Jotun / M/s Akzo Nobel / M/s Sigma) on underwater hull and boot top area to be carried out post adequate surface preparation. M/s Jotun underwater paint scheme is to be used. NOTE:- Painting to be carried out under supervision of Paint manufacturer/OEM and guarantee for 10 years to be given to Navy. After application of paint scheme DFT should not be less than 1075 microns which should be ensured before inspection by HITU. LLPS Paint scheme :- (iv) 03 Coats of Anti Fouling- Dry Film Thickness- 150 microns each coat.
00006 Under water Hull Top coat AF Paint (b) Application of one coat of A/F paint (M/s Jotun / M/s Akzo Nobel / M/s Sigma) on underwater hull and boot top area to be carried out post adequate surface preparation. M/s Jotun underwater paint scheme is to be used. NOTE:- Painting to be carried out under supervision of Paint manufacturer/OEM and guarantee for 10 years to be given to Navy. After application of paint scheme DFT should not be less than 1075 microns which should be ensured before inspection by HITU. LLPS Paint scheme :- (v) Apply one coat of black exterior on boot topping area.
00007 Under water Hull (a) Renew damaged Draught marks (Port & Stbd). Size -length of digit 100 mm, thickness 8mm, Vertical Gap between Digit- 100mm and Horizontal Gap between Digit- 20mm. Location - (i) Forward (Port & Stbd) (ii) Mid ship (Port & Stbd), (iii) Aft (Port & Stbd).
00007 Under water Hull (b) Draught marks to be painted with paint scheme as under water area and top coat to be painted with White paint.
00008 Under water Hull Ships pennant number with white and Black paint to be painted at Port, Stbd side and aft cut up area.
00009 Under water Hull (a) Clean and carry out endoscopic survey of Sea tubes covering the complete surface of sea tubes/sea chests.
00009 Under water Hull (b) Carry out renewal of defective sea tubes. Paint and Pressure test all sea tubes up to 1.7 bar post renewal. Further, Submit detailed report sea tube wise to Ship staff.
00010 Under water Hull Remove & work gratings for survey. Renew defective/ worn out fasteners. Mat-Studs/ nuts - SS.
00011 Under water Hull Pressure test repaired sea chests up to 1.7 kg/sqm. Further, Submit detailed report sea tube wise to Ship staff.
00012 Under water Hull Remove, overhaul, pressure test Storm valves. Location of valve will be indicated by ship staff. Prove serviceability of valves to ship staff post fitment. (i) Storm valve 249 mm
00012 Under water Hull Remove, overhaul, pressure test Storm valves. Location of valve will be indicated by ship staff. Prove serviceability of valves to ship staff post fitment. (ii) Storm valve 174 mm
00013 Under water Hull Remove, overhaul, pressure test OBD valve and SDNR/Gate valves. Location of valve will be indicated by ship staff. Prove serviceability of valves to ship staff post fitment. Dia 100 mm.
00014 Ship's Structure (a) Anticipated renewal of 04 tons of steel for each ship for Two Ships including plates and structural sections of entire ship including following locations :- (i) Underwater Hull (ii) Underwater compartments (iii) Ship's Tanks
00014 Ship's Structure NOTE: (I) DMR249A STEEL PLATES WOULD BE PROVIDED BY NAVY. HOWEVER, COST FOR THE CONSUMABLES, OTHER STRUCTURAL ARE TO BE CATERED BY THE SHIPYARD/ FIRM. (II) QUOTED COST SHALL INCLUDE COST OF NECESSARY DEGUTTING AND REGUTTING OF PORTABLE AND SEMI-PORTABLE FITTINGS, ELECTRICAL FITTINGS, JUNCTION BOXES / PANELS, LAGGING, PANELLING, TILING, MACROTECH AND ALL IN WAY JOBS OF RENEWAL OF THE STRUCTURE TO BE CARRIED OUT AS REQUIRED. FITTINGS THAT ARE DAMAGED DURING THE DE-GUTTING ARE TO BE RENEWED AND WORKTED IN SITU WITHIN THE QUOTED COST. (III) TESTING OF ALL WELD JOINTS BY DYE PENETRANT TEST ONCE AFTER COMPLETION OF ROOT RUN AND FINALLY ON COMPLETION OF ALL WELD RUNS FOLLOWED BY WATER HOSE TEST (3 KGF PRESSURE). (IV) DETAILS OF STRUCTURAL RENEWALS TO BE INCORPORATED IN RESPECTIVE DECK PLANS GIVING ALL DETAILS AND SUBMITTED FOR INFORMATION AND RECORD. (V) COST FOR TRANSPORTATION OF STEEL PLATES FROM ND(V) TO SHIPYARD PREMISES AND RETURN OF THE UNUSED STEEL PLATES BACK TO ND(V) MAY ALSO BE CATERED IN THIS DL ONLY AND SHIPYARDS/FIRMS TO QUOTE ACCORDINGLY.
00014 Ship's Structure (b) Job also involves degutting / regutting works like lagging, tiling, underlay/ cementing, panelling, pipes electrical wires minor eqpts. brackets, wooden fittings.
00014 Ship's Structure (c) Prepare surface and apply one coat of primer immediately after completion of hot work.
00015 .Under water Hull Scupper lips on both side of ship side perished. To be renewed. Mat - Neoprene Rubber. Work also involves Degutting and regutting of lagging/panelling, old scupper lips brackets. Mat: MS. Cater for removal and fitment of 30 Sqm lagging and 30 Sqm of panelling for each ship.
00016 Ship's Structure Carry out repair of approx. 150 nos isolated pits per Ship of size maximum 25mm by 25 mm and average depth of 4 mm with appropriate welding consumable. NOTE:- Scope of work also involves the following :- (i) The repair method involves preparing pitted surface by burr cutter / grinding wheel, deposition of weld metal, carrying out visual inspection & DPT, grinding of built up surface smooth followed by application of compatible primer coating.
00016 Ship's Structure Carry out repair of approx. 150 nos isolated pits per Ship of size maximum 25mm by 25 mm and average depth of 4 mm with appropriate welding consumable. NOTE:- Scope of work also involves the following :- (ii) Record of repair by building is to be maintained and marked on structural drawing / shell expansion by the ship repair yard. These records are to be forwarded to Ship staff and work monitoring team/ HITU.
00018 Tanks (a) UW tanks to be manually cleaned and left over fuel / freshwater / feed water / sullage/ sludge to be removed thereafter. Cater for removal of approx 0.25 Tons of sludge from each tank. Each Ship approx. 06 tanks
00018 Tanks (b) Staging for cleaning/ touch up painting in tanks.
00019 Tanks Carry out 25% Visual survey of internal structure tanks to ascertain the condition of tanks with special attention towards buckling of bulkhead or any other structure. Cater for survey of 8 no. tanks per Ship as indicated by SS where specific defects occurred.
00020 Tanks Carryout pressure testing of tanks if structural repairs undertaken. Test pressure 1 Kgf/cm2.
00021 Fuel Tanks & AVCAT Tank Maintenance painting Paint to be applied on deteriorated paint/plate renewal areas post surface preparation. Applicable paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) for fuel tanks to be used.
00022 Fresh Water Tank Maintenance painting Based on the survey of structures and paint failure, clean structures to the bare metal in way of any traces of corrosion or loose/flaking paint. Thoroughly dry exposed surfaces and paint to be applied post surface preparation. Applicable paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) for FW tanks to be used.
00023 Ballast tanks Maintenance painting Once the visual survey is over, paint to be applied on deteriorated paint/plate renewal areas post surface preparation. Applicable paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) for Ballast tanks to be used.
00024 Cofferdams/WT Compt Once the visual survey is over, paint to be applied on deteriorated paint/plate renewal areas post surface preparation. Applicable paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) for cofferdams to be used.
00025 Cofferdams/WT Compt Top coat One coat of the applicable paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) is to be applied in WT Compartments post buffing view top coat is completely deteriorated.
00026 Machinery bilges Excessive areas of breakdown of bilge paints to be power tool cleaned and recoated with full paint scheme (M/s Jotun / M/s Akzo Nobel / M/s Sigma) post surface preparation of that area in the underwater compartments.
00027 Above water Hull Maintenance painting (a) Carry out maintenance / touch-up painting of Above Water Hull (Shipside, Bulwark, Weather Decks, Superstructures) as per the existing paint schemes on completion of all hot work, suitable surface preparation and prior approval from Navy.
00028 Ship's Structure (a) Anticipated renewal of 1.5 tons of steel for each ship for Two Ships including plates and structural sections of entire ship including following locations :- (i) Internal AW Compartments (ii) Weather Decks (iii) Ship Side/ Bulwark areas (iv) Superstructure
00028 Ship's Structure NOTE: (I) DMR249A STEEL PLATES WOULD BE PROVIDED BY NAVY. HOWEVER, COST FOR THE CONSUMABLES, OTHER STRUCTURAL ARE TO BE CATERED BY THE SHIPYARD/ FIRM. (II) QUOTED COST SHALL INCLUDE COST OF NECESSARY DEGUTTING AND REGUTTING OF PORTABLE AND SEMI-PORTABLE FITTINGS, ELECTRICAL FITTINGS, JUNCTION BOXES / PANELS, LAGGING, PANELLING, TILING, MACROTECH AND ALL IN WAY JOBS OF RENEWAL OF THE STRUCTURE TO BE CARRIED OUT AS REQUIRED. FITTINGS THAT ARE DAMAGED DURING THE DE-GUTTING ARE TO BE RENEWED AND WORKTED IN SITU WITHIN THE QUOTED COST (III) TESTING OF ALL WELD JOINTS BY DYE PENETRANT TEST ONCE AFTER COMPLETION OF ROOT RUN AND FINALLY ON COMPLETION OF ALL WELD RUNS FOLLOWED BY WATER HOSE TEST (3 KGF PRESSURE). (IV) DETAILS OF STRUCTURAL RENEWALS TO BE INCORPORATED IN RESPECTIVE DECK PLANS GIVING ALL DETAILS AND SUBMITTED FOR INFORMATION AND RECORD. (V) COST FOR TRANSPORTATION OF STEEL PLATES FROM ND(V) TO SHIPYARD PREMISES AND RETURN OF THE UNUSED STEEL PLATES BACK TO ND(V) MAY ALSO BE CATERED IN THIS DL ONLY AND SHIPYARDS/FIRMS TO QUOTE ACCORDINGLY.
00028 Ship's Structure (b) Job also involves degutting / regutting works like lagging, tiling, underlay/ cementing, panelling, pipes electrical wires minor eqpts. brackets, wooden fittings.
00029 Ship's Structure Prepare surface and apply one coat of primer immediately after completion of hot work.
00030 Ship's Structure Carry out repair of approx. 200 nos isolated pits per Ship of size maximum 25mm by 25 mm and average depth of 4 mm with appropriate welding consumable. NOTE:- Scope of work also involves the following :- (i) The repair method involves preparing pitted surface by burr cutter / grinding wheel, deposition of weld metal, carrying out visual inspection & DPT, grinding of built up surface smooth followed by application of compatible primer coating. (ii) Record of repair by building is to be maintained and marked on structural drawing / shell expansion by the ship repair yard. These records are to be forwarded to Ship staff and work monitoring team/ HITU.
00031 Staging Erection Staging for cleaning/ touch up painting / laying of cables etc
00032 Ladder Steps Renewal of Ladder Steps (Mat- MS)
00033 Aluminium Renewal Undertake Aluminium Renewal jobs onboard
00034 Guard Rail Pipes Undertake Guard Rail Pipe Renewal:- (i) 26 to 50 mm Dia
00034 Guard Rail Pipes Undertake Guard Rail Pipe Renewal:- (ii) 51 to 80 mm Dia
00035 Ventilation Cowl Overhaul / repairs to Ventilation Cowl. Scope involves the following:- (i) Degutting and Regutting of Ventilation Cowl for repairs.
00035 Ventilation Cowl Overhaul / repairs to Ventilation Cowl. Scope involves the following:- ii) Overhaul onboard, remove and flap to be eased off and work.
00036 Mushroom Heads Removal, Dismantle, Overhaul and Regutting of Mushroom Heads:- (i) Upto 400mm Dia
00036 Mushroom Heads Removal, Dismantle, Overhaul and Regutting of Mushroom Heads:- (ii) 400mm to 600mm Dia
00037 Exhaust Trunking Cleaning and Repairs to Exhaust Trunking Size: 300mm Dia
00038 WT Doors (i) Renewal of Rubber Beading and Chalk testing of WT Door
00038 WT Doors (ii) Renewal of WT Door Handles / Cleats
00039 WT Hatches (i) Renewal of Rubber Beading and Chalk testing of WT Hatches
00039 WT Hatches (ii) Renewal of WT Hatch Handles / Cleats
00040 Port Holes Renewal of Port Holes
00041 Habitability (i) Renewal of Wash Basins (Mat - SS) including supporting brackets
00041 Habitability (ii) Renewal of Wash Basin Taps 13mm (Push Type)
00041 Habitability (iii) Renewal of Shower Valves 13mm with end fittings
00041 Habitability (iv) Renewal of Flush Valve 25mm wiith end fittings
00041 Habitability (v) Renewal of Door Locks
00042 Lagging (i) Renewal of Hot Lagging
00042 Lagging (ii) Renewal of MFMB Lagging
00043 Panelling (i) Renewal of Wooden / Sunmica Panelling in Cabins/ Messes
00043 Panelling (ii) Renewal of SS Panelling in Bathroom/ Galley/ WCs
00044 Deck Underlay Renewal of Deck Underlay in Wet Spaces
ENGINEERING WORK PACKAGE 10001 Steering Gear Check clearances of lower and upper bearings of both Rudders. Renew if necessary.
10002 Fire main system pipes Carry out random survey of fire main piping for corrosion and erosion especially at bends. Renew defective piping as necessary. Mat-Cu Ni. Type: Schedule 120. (i) 200 mm dia pipe
10002 Fire main system pipes Carry out random survey of fire main piping for corrosion and erosion especially at bends. Renew defective piping as necessary. Mat-Cu Ni. Type: Schedule 120. (ii) 125 mm dia pipe
10002 Fire main system pipes Carry out random survey of fire main piping for corrosion and erosion especially at bends. Renew defective piping as necessary. Mat-Cu Ni. Type: Schedule 120. (iii) 100 mm dia pipe
10002 Fire main system pipes Carry out random survey of fire main piping for corrosion and erosion especially at bends. Renew defective piping as necessary. Mat-Cu Ni. Type: Schedule 120. (iv) 50 mm dia pipe
10003 Fire main system valves Fire main system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (i) 249 mm dia valve
10003 Fire main system valves Fire main system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (ii) 174 mm dia valve
10003 Fire main system valves Fire main system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (iii) 99 mm dia valve
10003 Fire main system valves Fire main system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (iv) 49 mm dia valve
10004 Sea chests Sea chest strainers corroded, strainers to be repaired. Dia 200-300 mm, length 1 mtr, Mat -Brass.
10005 Bilge & Ballast System pipes Survey of Bilge & Ballast system pipelines, renew / repair as required. Material CuNi. Type: Schedule 120. (i) 200 mm dia pipe
10005 Bilge & Ballast System pipes Survey of Bilge & Ballast system pipelines, renew / repair as required. Material CuNi. Type: Schedule 120. (ii) 100 mm dia pipe
10005 Bilge & Ballast System pipes Survey of Bilge & Ballast system pipelines, renew / repair as required. Material CuNi. Type: Schedule 120. (iii) 80 mm dia pipe
10005 Bilge & Ballast System pipes Survey of Bilge & Ballast system pipelines, renew / repair as required. Material CuNi. Type: Schedule 120. (iv) 50 mm dia pipe
10006 Bilge & Ballast System valves Bilge & Ballast system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (i) 174 mm dia valve
10006 Bilge & Ballast System valves Bilge & Ballast system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (ii) 99 mm dia valve
10006 Bilge & Ballast System valves Bilge & Ballast system valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Type: Gate valve. (iii) 49 mm dia valve
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (i) 250 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (ii) 200 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (iii) 150 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (iv) 100 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (v) 80 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (vi) 50 mm dia clamps
10007 System pipe brackets (Clamps) Securing brackets/ Clamps for various pipe lines corroded. Brackets/ Clamps to be renewed and welded at scattered places. Rubber joint to be renewed. Job involves cutting of old brackets and welding of new brackets. Mat - MS. (vii) 25 mm dia clamps
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. (i) 399 mm dia valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. (ii) 300 mm dia sea chest valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. (iii) 250 mm dia sea chest valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. (iv) 200 mm Gate valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. (v) 150 mm SDNR valve / SD valve / Gate Valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Total valves: 24 no. (vi) 100 mm SDNR valve / Gate Valve
10008 UW Valves Underwater valves to be overhauled, pressure tested and proved to ship staff after fitment onboard. Total valves: 24 no. (vii) 65 mm SDNR valve / SD Valve
10009 OEM Engineering Undertake Engineering Jobs through OEM / Navy Nominated Firms as indicated by ND(V)/RMT on case to case basis
ELECTRICAL WORK PACKAGE 20001 Keltron Log (a) Clean Pick up head and transducer externally.
20001 Keltron Log (b) Carry out renewal of fairing around transducer.
20001 Keltron Log (c) Cover the transducer with foam lined water proof cover/ sheet to avoid damage while sand blasting and underwater painting.
20002 Keltron Echo Sounder (a) Clean transducer externally.
20002 Keltron Echo Sounder (b) Carry out renewal of fairing around transducer.
20002 Keltron Echo Sounder (c) Cover the transducer with foam lined water proof cover/ sheet to avoid damage while sand blasting and underwater painting.
20003 Motors Remove motor from Engine Room, transport ashore for rewinding/overhauling, motor dismantling, overhauling, varnishing, baking, reassembling, return onboard, work in position, reconnect cables and test onboard. (i) Upto 20KW
20003 Motors Remove motor from Engine Room, transport ashore for rewinding/overhauling, motor dismantling, overhauling, varnishing, baking, reassembling, return onboard, work in position, reconnect cables and test onboard. (ii) Upto 50KW
20003 Motors Remove motor from Engine Room, transport ashore for rewinding/overhauling, motor dismantling, overhauling, varnishing, baking, reassembling, return onboard, work in position, reconnect cables and test onboard. (iii) Upto 100KW
20003 Motors Remove motor from Engine Room, transport ashore for rewinding/overhauling, motor dismantling, overhauling, varnishing, baking, reassembling, return onboard, work in position, reconnect cables and test onboard. (iv) Upto 200KW
20004 Alternators Remove Alternator from Engine Room, transport ashore for rewinding/overhauling, alternator dismantling, overhauling, improvement of insulation, renewal of bearings (ship supply), assembling, return onboard, work in position, test & trials onboard. (i) Upto 80KW
20004 Alternators Remove Alternator from Engine Room, transport ashore for rewinding/overhauling, alternator dismantling, overhauling, improvement of insulation, renewal of bearings (ship supply), assembling, return onboard, work in position, test & trials onboard. (ii) Upto 200KW
20005 Alternators Overhaul of AVR Unit
20006 OEM Electrical & Weapon Undertake Electrical & Weapon Jobs through OEM / Nominated Firms as indicated by ND(V)/RMT on case to case basis
ADMINISTRATIVE SERVICES WORK PACKAGE AS-1 TRANSPORT FOR OFFICERS, WORK MONITORING TEAM, SAILORS, EQUIPMENT, SPARES AND OTHER STORES (A) PROVISION OF TWO CARS FOR ENTIRE DD DURATION (ONE FOR SHIP AND ONE FOR WORK MONITORING TEAM) FOR 12 HRS OR 100 KMS /DAY WHICHEVER IS LESS.
AS-1TRANSPORT FOR OFFICERS, WORK MONITORING TEAM, SAILORS, EQUIPMENT, SPARES AND OTHER STORES (B) PROVISION OF ONE 50 SEATER BUS FOR SHIP STAFF FOR DD DURATION, NOT EXCEEDING 12 HRS /100 KMS PER DAY.
AS-1 TRANSPORT FOR OFFICERS, WORK MONITORING TEAM, SAILORS, EQUIPMENT, SPARES AND OTHER STORES (C) PROVISION OF TWO MINI BUS FOR MOVEMENT OF ND(V) PRODUCTION STAFF FROM ND(V) TO HSL AND VICE VERSA FOR DD DURATION FOR 12 HRS OR 100 KMS/ DAY WHICHEVER IS LESS.
AS-2 GARBAGE CLEARANCE GARBAGE CLEARANCE FROM SHIP FOR ENTIRE DD DURATION FOR TWICE IN A DAY.
AS-5 Stationary items for ND(V)/ Project Monitoring Team Office Provide stationary / office items for entire RC duration (Consumable / Non-Returnable). Detailed requirement will be intimated by ND(V) / Project Monitoring Team Office on as required basis. Cater Budget of Rs.20,000/- per month. Payment at actuals.
AS-6 Fire Sentries 04 qualified / certified / trained Fire Sentries with 01 Fire Supervisor for 16 hrs per day. Actual No of sentries required will be intimated based on Shipyards requisitions for hot work received the previous day. Payment at actuals.
TECHNICAL SERVICES WORK PACKAGE TS-1 DOCKING AND UNDOCKING OF THE VESSEL. ONE VERSION. NOTE: DOCKING IS TO BE CARRIED OUT AS PER NAVY APPROVED DOCKING PLAN. DATE OF DOCKING TO BE INTIMATED TO NAVAL DOCKYARD/ SHIP STAFF / WORK MONITORING TEAM AT LEAST TWO WEEKS INADVANCE TO SCHEDULE JOINT INSPECTION BY HITU. ALL JOBS RELATED TO UNDERWATER HULL, FITTINGS AND PRESSURE TESTING OF TANKS FORMING PART OF SHELL PLATING TO BE COMPLETED DURING THIS PERIOD. TUG AND PILOTAGE WILL BE ARRANGED BY NAVY (ENTERING SHIPYARD DRY DOCK AND DEPARTING SHIPYARD).
TS-1 (A) DOCK HIRE CHARGES INCLUDING 01 SEPARATE GANGWAY AND CRANE FACILITY.
(B) DOCK HIRE CHARGES FOR SUBSEQUENT DAYS NOTE : INCASE VESSEL DOCKING DURATION IS EXTENDED BEYOND CONTRACTUAL DOCKING DURATION FOR REASONS NOT ATTRIBUTABLE TO HSL , ADDITIONAL DOCKING CHARGES AT 50% WILL BE LEVIED (i.a.w Para 24 (b) of Enclosure 1 to the RFP/standard attributability clause )
TS-1 (B) MOORING/UNMOORING AND LINE HANDLING
TS-1 (C) DOCK BLOCKS PREPARATION (AS PER REQUIRED VERSION), SETTING OF BLOCKS AND DOCK CLEANING.
TS-1 (D) THIRD PARTY INSPECTION FOR DOCK BLOCK PREPARATION. SHIPYARD TO ARRANGE THE NAVY APPROVED THIRD PARTY INSPECTION AGENCY (IRS/ ABS) FOR CHECKING THE ARRANGEMENT OF DOCK BLOCKS PREPARED BY SHIPYARD AS PER THE IHQ, MOD(N) APPROVED DOCKING PLAN. POST INSPECTION OF DOCK BLOCK PREPARATION, DULY RECOMMENDED CERTIFICATE BY THIRD PARTY INSPECTION AGENCY (IRS/ ABS) TO BE HANDED OVER TO NAVY.
TS-2 WHARFAGE (A) WHARFAGE AND WET BASIN FACILITY / ALONGSIDE HIRE CHARGES FOR THE QUOTED DURATION INCLUSIVE OF ONE SEPARATE GANGWAY.
TS-3 POWER SUPPLY (A) SUPPLY OF ELECTRICAL POWER MINIMUM (MANDATORY), 415 VOLTS, 50 HZ, 1000A, 3 PHASE INCLUDING CONNECTION/DISCONNECTION OF POWER CABLE. SHIPYARD TO INSTALL A CALIBRATED AND OPERATIONAL ENERGY METER IN THE SUPPLY LINE.
TS-3 POWER SUPPLY (B) POWER SUPPLY - ESTIMATED 2500 KWH PER DAY X 120 DAYS
TS-3 POWER SUPPLY (C) CONNECTION AND DIS-CONNECTION
TS-3 POWER SUPPLY (D) SHIP TO BE EARTHED AT FOUR PLACES. EARTHING CABLE TO BE PROVIDED BY SHIPYARD.
TS-4 FIRE MAIN / SEA WATER CONNECTION (A) PROVIDING FOUR FIRE MAIN LINES AT PRESSURE OF 08 BAR FOR ENTIRE WORK DURATION. 04 LINES X 120 DAYS.
TS-4 FIRE MAIN / SEA WATER CONNECTION (B) CONNECTION (4 TIMES) & DISCONNECTION (4 TIMES)
TS-5 FRESH WATER BOTTLES (A) SUPPLY OF 20 LITRE FRESH WATER BOTTLES 10 NO. PER DAY FOR ENTIRE DD DURATION OF 120 DAYS.
TS-6 CRANE CRANE SERVICES (10 TON CAPACITY, FOR 2hrs x 100 times) FOR SHIPS OWN REQUIREMENT (FOR HANDLING SHIP PROVISIONS).
TS-7 SUPPLY AND EXHAUST BLOWER 06 IN NOS PORTABLE SUPPLY AND EXHAUST BLOWER, 2 HP, 220V, 50 HZ TO BE SUPPLIED WITH SUFFICIENT HOSE (LENGTH: 15 MTRS EACH) FOR VENTILLATION OF FUEL TANK, AVCAT TANK, FW TANK, BALLAST TANK ETC TO OBTAIN GAS FREE CERTIFICATE AND THEREAFTER FOR HOT WORK. PAYMENTS AT ACTUALS.
TS-8 QC Inspectiors/ Third Party Inspection Provision of QC Inspectors from Class Society (IRS) for the entire work duration. Payment at actuals.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .