| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAdmitted-Finance | ₹38.4 L | L1 | Admitted-Finance |
| 2 | L2₹39.4 L+₹94,591.70 (2.46%)Admitted-Finance | ₹39.4 L+₹94,591.70 (2.46%) | L2 | Admitted-Finance |
| 3 | L3₹40.2 L+₹1.8 L (4.64%)Admitted-Finance | ₹40.2 L+₹1.8 L (4.64%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | LINGAM RAVI KIRAN L1 | V SURENDRA NAIDU L2 | CHINTHADA VENKATA RAO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Carefully dismantling the damaged/ out of plumb Brick masonry wall, supporting structure etc. and disposing the debris away from the monument etc., complete as directed by site-in-Charge. | 243.84 | Cu.m | 2,050 ₹4,99,872 Lowest | 2,180 ₹5,31,571.2 | 2,100 ₹5,12,064 |
| 2.00 | Dismantling the damaged roof of armoury hall and disposing the debris away from the monument etc., complete as directed by the site in charge. | 46.8 | Cu.m | 2,000 ₹93,600 Lowest | 2,100 ₹98,280 | 2,200 ₹1,02,960 |
| 3.00 | Providing and laying in position Brick jelly lime concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including laying, curing etc., complete as directed by the site in-charge. | 30.42 | Cu.m | 10,470 ₹3,18,497.4 Lowest | 10,780 ₹3,27,927.6 | 11,000 ₹3,34,620 |
| 4.00 | Construction of Random rubble masonry with hard stone in foundation and with Lime mortar including laying, curing etc., complete as directed by the site in-charge. | 31.75 | Cu.m | 11,450 ₹3,63,537.5 Lowest | 11,700 ₹3,71,475 | 11,500 ₹3,65,125 |
| 5.00 | Construction of Brick masonry wall in Lime mortar (1:2) including cost of materials and labour charges, curing etc., complete as directed by the site in-charge. | 150.82 | Cu.m | 13,050 ₹19,68,201 Lowest | 13,250 ₹19,98,365 | 14,000 ₹21,11,480 |
| 6.00 | Plastering the Brick masonry wall in Lime Mortar (1:2) with 20mm thick including cost of materials, labour charges etc., complete as directed by the site in-charge. | 621.72 | Sq.m | 785 ₹4,88,050.2 | 800 ₹4,97,376 | 780 ₹4,84,941.6 Lowest |
| 7.00 | Removal of damaged / deteriorated wooden roof members (Rafters, Beams, Capitals, Pillars etc.,) and disposing including cost of materials and labour charges etc., complete as directed by the site in-charge. | 13.55 | Cu.m | 8,100 ₹1,09,755 | 8,200 ₹1,11,110 | 8,000 ₹1,08,400 Lowest |
Tender Value
₹37.3 L
EMD Value
₹93,252
Closing Date
9 Apr 2026, 11:00 amClosed
SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada -520007 (A.P.)
As per Tender document
2026_ASI_903053_1
60/NIT/2025-26/Amaravati/ Vijayawada Sub Circle
Open Tender
Civil Works
Works
120 days
Bandar, Machilipatnam
As per Tender document
3 documents required · 3 mandatory
₹0
₹93,252
Yes
12 May 2026
20 Mar 2026
10 Apr 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carefully dismantling the damaged/ out of plumb Brick masonry wall, supporting structure etc. and disposing the debris away from the monument etc., complete as directed by site-in-Charge. | 243.84 | Cu.m | - | - |
| 2Dismantling the damaged roof of armoury hall and disposing the debris away from the monument etc., complete as directed by the site in charge. | |||||
| 3 | Providing and laying in position Brick jelly lime concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including laying, curing etc., complete as directed by the site in-charge. | 30.42 | Cu.m | - | - |
| 4 | Construction of Random rubble masonry with hard stone in foundation and with Lime mortar including laying, curing etc., complete as directed by the site in-charge. | 31.75 | Cu.m | - | - |
| 5 | Construction of Brick masonry wall in Lime mortar (1:2) including cost of materials and labour charges, curing etc., complete as directed by the site in-charge. | 150.82 | Cu.m | - | - |
| 6 | Plastering the Brick masonry wall in Lime Mortar (1:2) with 20mm thick including cost of materials, labour charges etc., complete as directed by the site in-charge. | 621.72 | Sq.m | - | - |
| 7 | Removal of damaged / deteriorated wooden roof members (Rafters, Beams, Capitals, Pillars etc.,) and disposing including cost of materials and labour charges etc., complete as directed by the site in-charge. | 13.55 | Cu.m | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.62 MB
BOQ_949167.xls
BOQ • 0.32 MB
Cover1.pdf
Additional Documents • 3.86 MB
60SignedNIT.pdf
Additional Documents • 15.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .