Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
22 Feb 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Auxiliary Engine Routines on MV Vishva Vijay
2023_HSL_92238_1
20 / 22014 / Auxiliary Engine / 203 / 2022-23
Open Tender
Miscellaneous Services
Service
30 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹525
Yes
HSL
₹10,000
Yes
4 Mar 2023
15 Feb 2023
22 Feb 2023
15 Feb 2023
22 Feb 2023
15 Feb 2023
Amount
E22025 ITEM : AUXILIARY ENGINE TYPE / CAPACITY / DETAILS : MAKE : MAN B&W. TYPE : CYLINDER ARRANGEMENT: IN-LINE CYLINDER BORE: 160 MM PISTON STROKE: 240 MM ENGINE : 660 KW AT 1200 RPM MEAN EFFECTIVE PRESSURE: 22.8 BAR MAX. CYLINDER PRESSURE: 170 BAR DIRECTION OF ROTATION: CLOCKWISE VIEWING FROM FLYWHEEL SIDE. STARTING: AIR MOTOR (7 - 10 BAR) MODEL :A/E #2 : MAN 6L 16/24 NO. OF CYLINDERS : 6(IN LINE) MODEL :A/E #1 AND #3 : MAKE: DAIHATSU, MODEL: 6DE18, 18MM BORE, 280 MM STROKE.680 KW OUTPUT. 900 RPM. CYLINDER BORE*STROKE : 160*240 MM RATED OUTPUT : 660KW RATED SPEED : 1200 RPM FOLLOWING WORKS TO BE CARRIED OUT ON ALL AUX ENGINE NO 3: NOTE: REQUIRED TOOLS ,TACKLES ,DP TEST KITS,COTTON RAGS ETC ARE TO BE ARRANGED BY THE VENDOR.JOB TO BE EXECUTED ON TURNKEY BASIS.CALIBRATED TOOLS ARE TO BE ARRANGED BY THE VENDOR.
AUX. ENGINENO 2 DECARB TO BE CARRIED OUT. DRAIN ALL LUBE OIL CLEAN CRANK CASE & INSPECT.C/SHAFT DEFLECTION TO BE TAKEN PRIOR AND AFTER OVERHAULING JOB.CONNECTION TO THE ENGINES REMOVED.CON ROD BOLTS LOOSENED HYDRAULICALLY AND LOWER HALF TAKEN OUT. CYLINDER HEAD BOLTS LOOSENED HYDRAULICALLY. COMPLETE CYLINDER UNITS TAKEN OUT AND TRANSPORTED TO WOKSHOP.CYLINDER UNIT DISMANTLED. PISTON TO BE TAKEN OUT AND DISMANTLED BY REMOVING PISTON PIN.CYLINDER HEAD TAKEN OUT FROM THE CYLINDER UNIT. LINER AND COVER REMOVED. LINER CALIBRATION TO BE DONE.IF CALIBRATION OK SAME TO BE PREPARED WITH NEW O RINGS.CYLINDER HEADS TO BE OVERHAULED AS PER MAKER PROCEDURE. ALL MOUNTINGD TO BE OVERHAULED.PISTON RING TO BE TAKEN OUT BOTH PISTON AND RING GROOVES TO BE CALIBRATED AND RECORDED.IF CALIBRATION OK THEN PISTON TO BE MADE READY BY PUTTING NEW PISTON RING.CONROD OVALITY TO CHECK AND ASSEMBLED ON PISTON BY PISTON PIN.CYLINDER UNIT TO BE ASSEMBLED AFTER CYLINDER HEAD LINER AND PISTON WORK.CRANK PIN TO BE CHECKED AND GAUGED.MAIN BRG AND THRUST BEARING OPENED CLEANED AND SHOWN TO SURVEYOR SAME TO BE FIT BACK WITH NEW BEARING SHELL AND THRUST RINGS. ASSEMBLED CYLINDER UNIT HAS TO BE TRANSPORTED BACK AND TO BE FITTED ON ENGINE.HYDRAULIC NUTS/BOLTS TO BE TIGHTENED AS PER MAKER PROCEDURE.CRANK CASE AND SUMP TO DRAIN CLEAN AND SYSTEM TO BE FLUSHED THROUGH USING FLUSHING OIL AND EXTERNAL CIRCULATING P/P (VENDOR SUPPLY). AFTER THOROUGH CLEANING / FLUSHING TAKE FRESH OIL (SHIP SUPPLY) AND PRIME THE LUBE OIL SYSTEM AND CHECK FOR LUB OIL FLOW IN C/CASE.
ALL CYLINDER HEADS TO BE CHEMICALLY CLEANED THOROUGHLY ON COOLING WATER SIDE TO REMOVE ALL SCALES AND TO BE PRESSURE TESTED TO 4 BAR.
ALL FUEL INJECTION PUMPS TO REMOVE FROM PLACE TRANSPORT TO VENDOR'S WORKSHOP DISMANTLE COMPLETELY AND OVERHAUL. ALL DAMAGED WORNOUT PARTS TO REPLACE WITH NEW SPARES (SHIP'S SUPPLY). ALL FUEL INJECTION PUMPS TO ASSEMBLE WITH NEW SEAL RINGS & GASKETS TRANSPORT TO SHIP FIT IN PLACE AND ALL CONNECTIONS TO BE MADE. SATISFACTORY ENGINE TRIALS TO BE GIVEN ON NO-LOAD AND ON MAXIMUM RATED LOAD.
ALL FUEL EXHAUST AND INLET CAMS TO EXAMINE. FOR REPLACING ONE OR MORE CAMS COMPLETE CAM SHAFT WILL REQUIRE TO BE WITHDRAWN AFTER REMOVING DRIVE GEAR AND BEARINGS.
AUX ENGINE NO 3 ATTACH LO HT LT PUMPS TO TAKE OUT OVERHAUL & FIT BACK.
iIF AE CRANK PIN DIMENSION FOUND BEYOND LIMIT CRANKSHAFT TO BE RENEWED.AFTER DISMANTLING THE UNITS COUPLING WITH ALTERNATOR TO OPENED ALTERNATOR TO BE SHIFTED FWD TO MAKE ACCESS FOR REMOVING FLYWHEEL FRONT END BOX TO BE OPENED AFTER REMOVAL OF LO COOLER AIR COOLER TURBOCHARGERAND OTHER MOUNTINGS.BOTTOM HALF OF THE MAIN BEARING TO BE OPENED FOUNDATION BOLTS AND CROSS BOLTS TO BE RENEWED FRAME TO BE LIFT UP AND CRANKSHAFT TO BE REMEOVED.NEW CRANKSHAFT TO BE PREPARED WITH COUNTERWEIGHT AND CYLINDRICAL PINS AND PLUGS TO BE TRANSPORTED NEAR ENGINE.FITTING TO BE DONE EXAC IN OPPOSITE SEQUESNCE.ALIGNMENT CHECKS TO BE CARRIED OUT.DAMPER TO BE OVERHAULED.FLYWHEEL TO BE FITTED BACK ALTERNATOR AND SACOS PANE TO CONNECT FRONT END BOX TO BE CONNECT AFTER FITTING ATTACHED PUMPS ALL FITTINGS TO BE ASSEMBLED.
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .