Tender Value
₹3.2 Cr
EMD Value
₹3.1 L
Closing Date
27 Feb 2026, 3:00 pmClosed
Shoranur-Mangalore section: Proposed construction of additional under pass (1 x 6.00 x 3.80 m RCC box) adjacent to exg. Br.no.1131 (RUB) at km 775/100-200 between Payangadi and kannapuram station ( deposit work of state govt- Kallayassery gramapanchayat).
PGT-Works-2026-N01-01
PGT-Works-2026-N01-01
Open
12 Months
Eluru, Andhra Pradesh
₹0
₹3.1 L
28 Jan 2026
28 Jan 2026
Vol.I & Vol .II ) except reinforcement steel
Item- 01 Provision of Underpass
S No. Item No Description of Item Unit Qty Rate Amount
5.0 REINFORCED CEMENT CONCRETE
5.1S CAST IN SITU
Reinforced cement concrete work in
walls (any thickness), including
attached pilasters, buttresses, plinth
and string courses, fillets, columns,
5.2 pillars, piers, abutments, posts and
struts etc. above plinth level up to
floor five level, excluding cost of
centering, shuttering, finishing and
reinforcement :
sand(zone-III) derived from natural
1 sources : 3 graded stone aggregate 20
mm nominal size derived from natural
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and removal of
5.9.6 Columns, Pillars, Piers, Abutments, Sqm 72 804.25 57906
Posts and Struts
10.0 STEEL WORK
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
10.1 Structural steel work in single section, Kg 57 93.05 5303.85
fixed with or without connecting plate,
3 including cutting, hoisting, fixing in
position and applying a priming coat
of approved steel primer all complete.
10.2 Structural steel work riveted, bolted or Kg 2880 111.95 322416
welded in built up sections, trusses
and framed work, including cutting,
hoisting, fixing in position and
applying a priming coat of approved
steel primer all complete.
Steel work in built up tubular (round,
square or rectangular hollow tubes
etc.) trusses etc., including cutting,
hoisting, fixing in position and
applying a priming coat of approved
steel primer, including welding and
bolted with special shaped washers
10.19 Providing and fixing mild steel round Kg 96 88.5 8496
6 holding down bolts with nuts and
washer plates complete.
12.0 ROOFING
Providing and fixing on wall face
unplasticised - PVC moulded fittings/
accessories for unplasticised Rigid PVC
rain water pipes conforming to IS :
13592 Type A, including jointing with
seal ring conforming to IS : 5382,
leaving 10 mm gap for thermal
Providing & fixing at all heights, levels
and locations colour finish Aluminium
alloy roofing sheets of alloy IS
d e s i g n a t i o n 31500, temper Hx8
conforming to IS 737 and dimensions
as per IS code 2676 with
characteristics of good formability and
corrosion resistance. The profile
sheets shall be fixed to truss members
12.65 in slope or required pitch or curvature
with Hex cap headed self
drilling/tapping Stainless steel screws
M6, 50 mm long with 3 mm EPDM seal
washer etc. all inclusive of labour,
scaffolding, T&P and sundries etc.
complete as per directions of the
Engineer-In-Charge. (Cost of
truss/frame work shall be paid
troughed profile with center to center
7 pitch of 200 mm, depth of 32 mm,
overall profile width1092 mm, cover
13.0 FINISHING
13.44S EXTERIOR FINISHING
Finishing walls with textured exterior
paint of required shade :
13.45.1 New work (Two or more coats applied Sqm 378 245 92610
@ 3.28 ltr/10 sqm) over and including
priming coat of exterior primer applied
@ 2.20kg/10 sqm
16.0 ROAD WORK
16.1S ROADS
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
16.3 Supplying and stacking at site.
16.42S CONCRETE PAVEMENTS
coarse sand : 4 graded stone
aggregate 40 mm nominal size) in
11 pavements, laid to required slope and
camber in panels as required including
consolidation finishing and tamping
Providing and laying design mix
cement concrete of M-30 grade, in
roads/ taxi tracks/ runways, using
cement content as per design mix,
using coarse sand and graded stone
aggregate of 40 mm nominal size in
appropriate proportions as per
approved & specified design criteria,
providing dowel bars with sleeve/ tie
bars wherever required, laying at site,
spreading and compacting
mechanically by using needle and
surface vibrators, levelling to required
slope/ camber, finishing with required
texture, including steel form work with
sturdy M.S. channel sections, curing,
making provision for contraction/
expansion, construction & longitudinal
joints (10 mm wide x 50 mm deep) by
groove cutting machine, providing and
filling joints with approved joint filler
and sealants, complete all as per
direction of Engineer-in-charge (Item
of joint fillers, sealants, dowel bars
with sleeve/ tie bars to be paid
16.43.2 Cement concrete manufactured in cum 35 10006.65 350232.75
automatic batching plant (RMC plant)
i/c transportation to site in transit
Schedule C-List of Items of Works covered by the SRUSSOR - 2021 for TVC & PGT Division except
Schedule Cement & Reinforcement steel for which tenderer has to quote percentage rate over, below or at
par to the SRUSSOR 2021 rate.
Item- 01 Provision of under pass
S No. Item No Description of Item Unit Qty Rate Amount
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Earthwork in cutting in formation,
trolley refuges, side drains, level
crossing approaches, platforms, catch
water drains, diversion of nallah &
finishing to required dimension and
slopes to obtain a neat appearance to
standard profile inclusive of all labour,
materials, plant & machinery, leading
all cut spoils either to make spoil
dumps or for filling in embankment
with leads within 2 km on either side
o f edge of the cutting(s) including all
lifts, ascent, descent, loading,
unloading, bailing & pumping out
water, if required, clearance of site
and all other works incidental thereto
for completing the work as per RDSO
Specification No. RDSO/2020/GE: IRS-
0004 with latest updated correction
slips and to the satisfaction of the
Engineer-in-Charge. Note: (i) All usable
earth arising from cut spoils shall be
led into bank formation and Unusable
spoils shall be dumped / stacked away
from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will
be stacked by the contractor and will
be property of the Railways. (iii)Cut
trees shall be property of Railways
and to be deposited in the railway
godown unless specified otherwise in
the Conditions of Contract.
1 012011 In all conditions and classifications of cum 102.00 121.60 12403.20
soil except rock
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and watering
etc. including all lift, disposal of
surplus soil up to a lead of 300m, all
types of shoring and strutting with all
labour and material complete as per
drawing and technical specification as
directed by Engineer in charge. Note:
This item will be used for excavation
work in connection with other
miscellaneous works also like side
drains, foundation for OHE masts and
other miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
Providing and laying in position Plain
cement concrete of specified Nominal
Mix f o r miscellaneous works like side
drains, foundation for OHE masts and
other miscellaneous structures
excluding the cost of Cement,
centering and shuttering - All work up
to plinth level :
III) : 4 graded stone aggregate 20 mm
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality in
RCC raft foundation & Pile cap
including finishing, using Plasticiser in
approved proportions (as per IS:9103),
to modify workability without
impairing strength and durability
complete as per specifications and
direction of the Engineer in charge.
N o t e : 1. Payment for cement,
reinforcement and shuttering shall be
made extra under relevant item. 2.
Plasticiser shall invariably be used in
approved proportion to increase
workability with minimum possible
quantity of cement for all grade of
Design Mix Concrete unless it is
specifically approved citing reasons for
not using plasticiser at the stage of
Mix Design and in that case deduction
shall be made as per relevant item.
P r o v i d i n g and laying in position
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for
the following Reinforced cement
concrete structural elements up to
height of 9.0 m from foundation top
level, including finishing, using
Plasticiser in approved proportions (as
per IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved citing
reasons for not using plasticiser at the
stage of Mix Design and in that case
deduction shall be made as per
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Concrete 1:3:6 with graded stone
aggregate of 40mm nominal size, in
foundation and floors, retaining walls
of bridges including mechanical
mixing, vibrating, pumping and bailing
out water where ever required with all
materials and labour complete but
excluding the cost of cement and
shuttering as per drawings and
technical specifications as directed by
batched, machine mixed and machine
vibrated Cement Concrete of specified
grade as per approved Design Mix,
mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants, (Cast in-
Situ/Pre-cast) in bottom/top slab, side
walls, toe wall and sumps haunch
filling head walls, thrust bed or any
other component using 20mm graded
crushed stone aggregate and coarse
sand of approved quality of RCC box
of any size including finishing,
Plasticiser in approved proportions (as
per IS:9103), to modify workability
without impairing strength and
durability, complete as per drawings
and technical specifications as
directed by Engineer in charge. Note:
1. Payment for cement, reinforcement
and shuttering shall be made extra
under relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved citing
reasons at the stage of Mix Design
a n d in that case deduction shall be
made as per relevant item.
Centering and shuttering including
strutting, propping etc. and removal of
8 025031 All types of bridge sub-structures, e.g. Sqm 1373.00 853.04 1171223.92
pier, abutment, wing wall, retaining
wall, RCC box type foundations,
Abutment cap, Pier Cap, Inspection
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to
5m above ground level
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
9 031120 Casting and installation of single/twin cum 648.00 7246.41 4695673.68
RCC box of all sizes with or without
common web section including design
of pushing scheme, thrust bed, casting
of all RCC components, with specified
grade of controlled concrete, pushing
it in correct position and alignment
below Railway track/Road following all
measures of track safety by 'Box
pushing technique" as per approved
drawings/scheme, with or without
surcharge in all types of soils with
disposal of surplus earth away from
vent up to 1 Km, fixing arrangement
f o r all services & utilities including
parapet walls on both sides, wearing
course, foot paths, plaques, drainage
arrangements etc. and all other
incidental works to complete the
ROB/RUB/Canal crossing in all respect
as per specifications to the satisfaction
of Engineer-in-Charge. N o t e : 1. The
rate includes all items of work/supplies
for complete job in all respects except
"cost of Reinforced cement concrete,
cement, reinforcement & shuttering"
of (i) main RCC Box; (ii) Thrust Bed;
(iii) Footpath (iv) Parapet wall and (v)
wearing Course only, which shall be
paid extra under relevant items of
USSOR. 2. In case Drag Sheet and/or
Rail Cluster are to be used as per
approved scheme and design, the
same shall be paid extra under
relevant item. 3. The payment for this
item shall be made for the clear inner
cross section area of the parent RCC
Box/Boxes and barrel length i.e. clear
inner volume of parent RCC
mm thick, for protection of track from
subsidence while pushing the box as
per design over item no. 031120.
Note: The payment for this item shall
be made for the clear inner cross
section area of the parent RCC
Box/Boxes and barrel length i.e. clear
inner volume of parent RCC
Providing and fixing various size HTS
holding down bolts conforming to
r e l e v a n t Codes/Specification in
concrete column or in other structures
with proper nuts, bolts,
washers/plates, grouting of holes with
cement or epoxy concrete with all
material, labour, T&P as a complete
shall be paid extra.
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
welded and/or bolted and/or riveted
steel work in built up sections, trusses
and framed work, staging, racks,
Height Gauge etc. for Steel Structures
other than bridge girders, using RSJ,
tees, angles and channels/flats, plates,
gussets, round or square bars, cleats,
bolts etc., with contractors own steel
including cutting, bending,
straightening, drilling, riveting,
hoisting, fixing, erecting, welding,
bolting etc., with Providing stiffeners
wherever required as per approved
drawing including applying a priming
coat of a approved steel primer with
all contractor's materials, labour, tools
& plants, lead & lift including crossing
of tracks if required etc., complete as
per specification and as directed by
E n g i n e e r- i n - c h a r g e . Note: The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
including consolidation with all labour,
lead, lift, tools, plants, crossing of
tracks as per drawing and technical
specification as directed by the
Engineer in charge in case loose slush
is encountered at site of foundation
before casting the foundation or laying
the filtering media.
14 052210 Providing cast in situ bridge number Each 2.00 1206.22 2412.44
plaques as per Railway drawing in
cement concrete 1:2:4 mix using
20mm hard stone aggregate
embedded in 30mm notch in Bridge
parapet coping duly engraving the
letter and figures and an arrow
indicating the direction of flow and
finishing the top exposed surface with
cement mortar 1:3, painting letters
and figures with two coats of black
enamel paint on two coats of white
background with all labour, tools,
cement, paint etc. with all leads and
Providing & laying non pressure NP-4
Class RCC pipe with collars, jointing
with 1:2 cement and ordinary sand
mortar including testing of joints, but
excluding earthwork with all labour
and material as a complete job.
Cement for mortar will be paid
separately.(Pipes of 600mm dia and
above will be laid using crane/hydra).
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
25mm gap 'in-situ' welding during
traffic block and finishing of weld to
m e e t the prescribed tolerances and
pass all stipulated tests with all
required labour, materials,
consumables, tools, equipments etc.
to complete the work in all respect as
per IR's "Manual for Fusion Welding of
Rails by Alumino - Thermic Process"
with latest correction slips, including
marking of welded joint, painting weld
collar with anticorrosive paint,
restoration of track near weld joint to
original position and fixing of joggled
fish plate at new weld, to be removed
after passing of weld in USFD test as
directed by Engineer in charge. Note:
1. Welding shall be carried out only by
trained welder having valid
competency certificate using RDSO
approved Alumino Thermit Welding
Portions, 3 piece prefabricated mould
(ZIRCON WASHED) manually pressed,
Single shot crucible fitted with auto
tapping thimble and Compressed Air
Petrol/LPG preheating technique as
per RDSO Specification No IRST/19-
2020 with latest amendment. 2.
Hydraulic Weld trimmer shall be used
for chipping and profile Grinder for
finishing. 3. Only required nos. of
Joggled fish plates shall be supplied by
Railway at nearest P. Way Stores and
the same shall be returned at nearest
P. Way Store or at other location as
per direction of Engineer-in-Charge
after release from track. All other
items required shall be supplied by
the Contractor.
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit necessary
hand signals to the trains for their
passage over caution spot. Note: 1)
Prescribed protection equipment shall
be supplied by Railways and the same
shall be returned after work is over. 2)
If Contractor fails to post watchman at
any time during one day, penalty at
double the accepted rates will be
levied and 3) The watchman
nominated by the contractor will be
screened for suitability as per Railway
First or Second Through Packing of
track of all sleeper density including
giving a general lift, as desired to
eliminate sag after Deep Screening
work, lifting of track, lowering of track
and major realignment of curves and
formation rehabilitation as per
procedure prescribed in latest edition
of IRPWM. Note: General lift is
normally 25 mm and isolated lift may
be up to 50 mm.
Density of 1540
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
19 151130 Through Rail renewal with free service TRM 52.00 137.48 7148.96
rails of all types by removing existing
running rails, already cut into free rails
/ rail panels for making auxiliary track,
including attending alignment, cross
level, gauging, packing; wherever
required including crossing of track, as
Quick cutting with abrasive rail cutter
of all types of rail sections including
wear resistant, head hardened rails up
to 110 UTS, with contractors tools &
plants, equipment, consumable with
all lead & lift etc. complete as directed
by Engineer in-charge. Abrasive Rail
Cutter will be as per RDSO
Specification No. TM/SM/1 (Rev. 01 of
2012) with latest status of RDSO; Rail
Cutting Wheel Abrasive Disc will be as
per RDSO Specification No.TM/SM/2
Drilling holes of 16 mm to 32 mm dia.
with Rail Drilling machine including
chamfering with appropriate
chamfering tools in all types of rail
section with contractor's tools &
plants, equipment, consumable with
all lead & lift etc. complete, as
directed by Engineer in-charge. Rail
Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated
Loading of rails of any section and
length up to 1 3 metres in Wagons /
Truck / trailer including lead up to 50
metres and lift up to 5 metres.
is possible a n d traffic block is not
required or in Truck/trailer.
Unloading of rails of any section and
length up to 13 metre, in neat manner
for Railway usage from departmental
material train (DMT) or contractor's /
Railway's Truck/trailer including lead
up to 50 metre, lift up to 5 metre and
stacking in prescribed manner.
handling is possible and traffic block is
not required or in Truck / trailer.
Transportation of Rails, sleepers,
switches, crossings, SEJs and Glued
Joints by road vehicles for different
leads. Note: 1 . Lead shall be the
shortest motorable road length
between the points of loading and
unloading. 2. Loading and unloading
shall be paid extra under relevant
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Insertion of temporary girder in place
of formation involving dismantling of
track, removal of ballast and neatly
stacking for future use, excavation &
installation of CC crib or wooden crib
at both ends as per approved design
in one or more traffic blocks,
excavation for creating space for
insertion of girder as required,
placement of girder by contractor's
Crane, tools & plants, filling of
earth/sand filled bags at different
stages as required, linking of track and
connecting with the approaches,
ballasting, boxing and packing
approach sleepers to make track fit for
20 kmph to the satisfaction of
Engineer in-charge. Note: 1. The CC
Cribs as required and Temporary
Girder shall be supplied by Railways at
available location. 2. Transportation of
Temporary Girder to site shall be paid
separately under relevant item. 3. The
charges for wooden sleepers/blocks
required for matting and bearing as
per approved design shall be paid
extra as per relevant item. 4. In case
bridge timber / channel sleepers are
required to be laid on girder, the same
shall be paid separately under relevant
25 191022 RH /Temporary girder of length above Each 2.00 200812.59 401625.18
16.3m and up to 26.00 using Road
crane capacity of 80 MT
Removal of temporary girder, crib on
both ends and placing temporary
girder on crib / cess away from
Railway track as directed by engineer
at site under traffic block; filling of
Railway's earth by ramming, pulling
ballast from stack / adjoining track /
same track, laying track, linking with
approach track and packing of ballast
for opening track at 20 kmph speed,
boxing & dressing of cess, ballast
profiling etc. Note: If earth is to be
brought by contractor from outside,
the same will be paid separately.
26 191042 RH /Temporary girder of length above Each 2.00 216448.04 432896.08
16.3m and up to 26.00 using Road
crane capacity of 80 MT
PALAKKAD DIVISION-ENGINEERING/SOUTHERN RLY
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and watering
etc. including all lift, disposal of
surplus soil up to a lead of 300m, all
types of shoring and strutting with all
labour and material complete as per
drawing and technical specification as
directed by Engineer in charge. Note:
This item will be used for excavation
work in connection with other
miscellaneous works also like side
drains, foundation for OHE masts and
other miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
022014 for executing the work under
water and/or liquid mud to
compensate all additional
arrangements including pumping out
water as required. Note: The extra
percentage rate is applicable only for
the quantity of work executed under
water. [RATE = 20%]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Notes-SchAA1.pdf
Notes-Sch.B.pdf
Notes-SchCC1C2.pdf
GCC_April-2022.pdf
providentFundstt.pdf
Acs1to10.pdf
ANNEXUREVNEWasperACS4.pdf
AnnexureVaaspercorrectionslip2GCC2022.pdf
AnnexureVIA.pdf
AnnexureVI-B.pdf
AnnexureB2-DSR2021.pdf
CheckListandNEFTform.pdf
Guidelinesforprotectionofcables.pdf
eBGaccountno..pdf
AnnexureA-OT-01-01.pdf
E-TENDERNOTICE-PGT-OT-01-2026.pdf
Download all tender documents and submit your bid