Loading…
Loading…
Tender Value
₹8.4 L
EMD Value
₹10,000
Closing Date
23 Jul 2026, 6:00 pmClosed
Dy. Conservator of Forest Kachchh West Div. Bhuj
Construction of Conference Hall at Existing Divisional Office Bhuj Taluko - Bhuj, Dist - Kachchh.
322278
2026/27
Open
Civil Works - Buildings
Works
Kutch
1 document required · 1 mandatory
₹900
Deputy Conservator of Forest, Kachchh West Division, Bhuj
₹10,000
8 Jul 2026
8 Jul 2026
8 Jul 2026
23 Jul 2026
8 Jul 2026
Name of work :-
Construction of Conference Hall at Existing Divisional Office Bhuj Taluko -
Bhuj, Dist - Kachchh.
It. Qty. Est. Item of work Tendered Rates Unit Total
No. But In In Words amount
may be Figures according
more or to esti.Qty.
1 3.92 Providing and laying controlled cement 7314.42 Rupees Seven Cmt
concrete M.250 and curing complete including Thousand Three
the cost of formwork and excluding Hundred Fourteen
reinforcement for reinforced concrete work in Paise FourtyTwo
(D) Columns, Pillars posts and struts, upto Only
floor two level. (RA1)
2 5.39 Providing and laying controlled cement 5851.94 Rupees Five Cmt
concrete M.250 and curing complete including Thousand Eight
the cost of formwork and excluding Hundred FiftyOne
reinforcement for reinforced concrete work in Paise NinetyFour
(C) Beams, Girders and Cantilever upto floor Only
two level. GF Beam (RA2)
3 8.09 Providing and laying controlled cement 6374.11 Rupees Six Cmt
concrete M.250 and curing complete including Thousand Three
the cost of formwork and excluding Hundred
reinforcement for reinforced concrete work in SeventyFour Paise
(C) Slabs, landing, shelves, Balconies, Lintels, Eleven Only
Beams, Girders and Cantilever upto floor two
level. GF Slab (RA3)
4 3.50 Providing and laying controlled cement 6124.64 Rupees Six Cmt
concrete M.250 and curing complete including Thousand One
the cost of formwork and excluding Hundred
reinforcement for reinforced concrete work in TwentyFour Paise
(C) Sill and Lintels & Chhaja upto floor two SixtyFour Only
5 3908.40 Providing TMT Bar FE 500D reinforcement 77.29 Rupees KG
for R.C.C. work including bending, binding SeventySeven Paise
and placing in position complete upto floor TwentyNine Only
two level (SOR 05014C)
6 31.48 Precast concrete block masonry (including 3771.97 Rupees Three Cmt
quoin blocks jamb blocks closer etc.) with Thousand Seven
solid concrete blocks of approved size made of Hundred
cement concrete 1:3:6 mix (1- Cement : 3 SeventyOne Paise
coarse sand: 6- graded stone aggregates of 20 NinetySeven Only
mm and down grade) in foundation and plinth
cement mortar 1:6 (SOR 07012A)
7 55.21 Providing 10mm thick cement plaster in single 122.26 Rupees One Smt.
coat on brick/concrete walls for interior Hundred
plastering upto floor two level and finished TwentyTwo Paise
even and smooth in (ii) Cement mortar 1:4 (1- TwentySix Only
cement :4-sand) (SOR 17001B)
It. Qty. Est. Item of work Tendered Rates Unit Total
No. But In In Words amount
may be Figures according
more or to esti.Qty.
8 98.19 Providing 15mm thick cement plaster in single 161.20 Rupees One Smt.
coat on Rough (Similar)side of single or half Hundred SixtyOne
brick walls for interior plastering upto floor Paise Twenty Only
two level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand) (SOR
9 165.73 Providing 20mm thick cement plaster in single 203.78 Rupees Two Smt.
coat on single or half brick walls for interior Hundred Three
plastering upto floor two level and finished Paise SeventyEight
even and smooth in (ii) Cement mortar 1:4 (1- Only
cement :4-sand) (SOR 17003B)
10 153.40 Wall painting (two coats) with plastic emulsion 124.96 Rupees One Smt.
paint of approved brand and manufacture on Hundred
undecorated wall surface to give an even shade TwentyFour Paise
including throughly brushing the surface free NinetySix Only
from mortar droppings and other foreign matter
and sand papered smooth, Including two coats
of putty & two coats of primer of approved
brand and manufacture on new wall surface
sand papered smooth (SOR 18031 + SOR
11 165.73 Finishing wall with weather proof exterior 144.31 Rupees One Smt.
emulsion paint on wall surface (three coats) to Hundred
give an required shape even shade after FourtyFour Paise
thoroughly brushing the surface to remove all ThirtyOne Only
dirt, and remains of loose powdered
materials.etc complete (SOR 19031 + SOR
12 57.47 P & L 24" x 24" vitrified 8 mm thick tile 1467.72 Rupees One Smt.
flooring over 20 mm (average) base of cement Thousand Four
mortar 1:6 ( 1 cement: 6 coarse sand) on new Hundred
surface or fixing on existing flooring by SixtySeven Paise
adhesive material including dismentaling of SeventyTwo Only
existing flooring and jointed with color cement
slurry including finised with flush pointing &
cleaning the surface etc. complete for DARK
shade(SOR 14020A)
It. Qty. Est. Item of work Tendered Rates Unit Total
No. But In In Words amount
may be Figures according
more or to esti.Qty.
13 6.94 Providing and fixing window having extruded 2277.78 Rupees Two Smt.
aluminum Colour Powder Coated section Thousand Two
frame main outer size 95mm x 24mm x Hundred
1.17mm @ wt.of 0.738 Kg/mt, horizontal SeventySeven Paise
Three track member size 92mm x 31.75mm x SeventyEight Only
1.30mm @ Wt.1.07 Kg/mt, vertical member of
size 92mm x 31.75mm x 1.50mm ,@ Wt.
Kg/mt with sliding shutters of horizontal
member size 40 mmx18mm x1.29mm @ wt.of
0.456 Kg/mt, vertical member of size 40mm x
18mm x 1.29 mm @ wt.of 0.456Kg/mt with
mm thick transparent bronze colour tinted float
glass with powder coated aluminum fittings
and fixtures and transparent silicon sealant
glass fixing to frame as per details etc. With
Providing and fixing Fly proof galvanised M.S.
wire gauge of I.S.l gauge designation 85 G.
with wire of dia.0.56 mm to windows and
celevating windows including 60 x 20mm
beading of teak wood. [(SOR 11033+10027A)
14 4.30 Providing and fixing 35 mm thick flush door 2664.38 Rupees Two Smt.
shutter, solid core Confirming to IS:2202 & Thousand Six
ISI approved manufacture with Anodized Hundred SixtyFour
Aluminium section (door section no 19552- Paise ThirtyEight
weight not less than 1.1 kg/mt ) frame size Only
63.5mm x 38mm inserted Non teak wood
frame inside the aluminium section for durable
grip of hinges(4no each shutter) & shutter with
required teakwood batten having 1mm thick
lamination on both side, Durable Grip shall be
providing with both side 15cm long stainless
steel handle and necessary Locking system of,
,fixtures & fastenings etc. directed by engineer
in charge. (RA-5)
15 208.20 Providing and fixing M.S. grills of required 109.08 Rupees One Kg
Gate etc. with M.S. flats at required spacings Hundred Nine Paise
and frame alround, square or round bars with Eight Only
round headed bolts and nuts or by screws. (a)
PLAIN GRILL (SOR 10025aA 10.1)
16 6.94 Painting two coats (including priming coat) on 104.99 Rupees One Smt.
new steel and other metal surface with Hundred Four Paise
synthetic enamel paint, brushing to give an NinetyNine Only
even shade including cleaning the surface of all
dirt, dust and other foreign matter.. [(SOR
It. Qty. Est. Item of work Tendered Rates Unit Total
No. But In In Words amount
may be Figures according
more or to esti.Qty.
17 62.42 Providing and laying broken chine mosaic 779.70 Rupees Seven Smt.
flooring for terrace using 12 mm to 20 mm Hundred
broken pieces of glazed tiles to be laid over SeventyNine Paise
cement mortar 1:3 to plain or slope and to be Seventy Only
tempered to bring mortar creme out upto
surface using white cement including rounding
off junctions and extending them upto 15 cm
along the wall,clearing with water and oxalic
acid etc. as directed. (SOR 14035)
Rupees Eight Lakh ThirtySeven Thousand One Hundred NinetySeven Paise SixtyOne Only
I/We am/are willing to carry out the work at.................................. % above/below
Percent (should be written in figures and words) The tendered amount mentioned above amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct ……….......% Below Add ……...........% above
The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2 The Labour cess will be deduct as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. there fore in
R.C.C. items where the reisa change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Stamp & Sign of Contractor Dy. Conservator of Forests
West Kachchh Division-Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
All GR.pdf
BUILDING SPECIFICATIONS BOOK (4).pdf
Drawing - Conference Hall.pdf
NIT.pdf
SBD.pdf
Sch B.pdf
Terms and Conditions.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .