Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹1.5 Cr+₹10,782.50 (0.07%)Rejected-AOC | ₹1.5 Cr+₹10,782.50 (0.07%) | L2 | Rejected-AOC reject |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Documnets not submited |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technical not accept |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
30 Jan 2023, 5:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER UTTARAKHAND JAL SANSTHAN PUROLA
Augmentation of DUCHANU Water Supply Scheme Under Jal Jeevan Mission In Block MORI of District Uttarkashi
2023_UKJS_53894_1
1040 /E-Nivida/2022-23 Dated 12.01.2023
Open Tender
Civil Works - Water Works
Item Wise
180 days
Purola
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Yes
EXECUTIVE ENGINEER UTTARAKHAND JAL SANSTHAN PUROLA
₹3 L
Yes
UJS PUROLA
31 Jul 2023
16 Jan 2023
1 Feb 2023
16 Jan 2023
30 Jan 2023
16 Jan 2023
20 Jan 2023
Construction of RCC Intake including all materials, labour, T&P etc. required for proper completion of work 1x1x1.5
Construction of Steel intake chamber including supply of all labour, material t&p etc.
Construction of Roughning Filter including all materials, labour, T&P etc. required for proper completion of work
RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete
RR Dry including supply of all materials, labour, T&P etc. complete
Pcc 1:4:8((1 cement: 4 coarse sand: 8 graded stone aggregate 40 mm nominal size)
Providing of all materials to site of work,Laying & jointing of GI (H) screwed pipes(including supply of all jointing materials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc complete.
G I PIPE (Medium Duty) Class 'B'
15mm dia
25mm dia
32mm dia
40mm dia
50mm dia
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 75% pipe line is laid in trenches,
Soil mixed with boulder (SMB)
Medium Rock (MR)
Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete for Wheel Valve/Gate Valve
25mm dia
40mm dia
50mm dia
Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(0.6x0.6x0.6)
FHTC( Functional Household taped connection as per Unit Estimate
constraction of C.W.R. 30.00 KL
constraction of C.W.R. 7.50 KL
constraction of C.W.R. 10.00 KL
constraction of C.W.R. 12.50 KL
Supply and fixing of Bucket type chlorinator of 25 Liter capacity at top of all service raservoirs.
Cartage of G.I. Pipe and special material
Excavation in foundation
RCC Crosswall as per Dwaing
Coolie Walling
constraction of BPT as per Drawing
Soorbir Singh Rawat
SUKHDEV SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .