Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
| 5 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹80.8 Cr
Closing Date
17 Jan 2022, 5:00 pmClosed
Superintending Engineer (R and B) NH Circle Vja
Office of the Superintending Engineer (R and B) NH Circle Room No. 508 5th floor State HOD Offices Building Complex M.G Road Vijayawada
Construction of two-lane Major Bridge across Penna River at Km.739.234 of NH-67 including approaches parallel to existing 2 lane bridge in SPS Nellore District in the State of Andhra Pradesh through EPC Contract under Annual Plan 2021-22
2021_MoRTH_660569_1
SENHVJA/51/2021-22 Dated. 01.12.2021
Open Tender
Civil Works
EPC Contract
720 days
Andhra Pradesh
As per tender document
5 documents required · 5 mandatory
₹11,200
RPAO NHs Hyderabad
Yes
O o Chief Engineer (R and B) NH and CRF Office Vja
2 Jun 2022
3 Dec 2021
18 Jan 2022
3 Dec 2021
17 Jan 2022
3 Dec 2021
3 Dec 2021 - 28 Dec 2021
29 Dec 2021
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.20 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_695346.xls
BOQ • 0.27 MB
01.12.21pennabridgeRFP.pdf
Tender Documents • 1.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .