Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Oct 2022, 11:00 amClosed
CDR AJAY UPADHYAY
SENIOR MANAGER (RPP 0 NAVAL SHIP REPAIR YARD NAVAL BASE KOCHI - 682004
REPAIR RATE CONTRACT FOR MAINTENANCE OF NAVAL JETTY INFRASTRUCTURE AT NAVAL SHIP REPAIR YARD , KOCHI
2022_NAVY_552690_1
PT/RPP/111(I)3/JETTY/01/22-23
Open Tender
Marine Services
Fixed-rate
365 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KOCHI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
SENIOR MANAGER (YARD SERVICES), OFFICE
5 Nov 2022
17 Sept 2022
11 Oct 2022
17 Sept 2022
10 Oct 2022
27 Sept 2022
18 Sept 2022 - 26 Sept 2022
26 Sept 2022
Amount
Work/ Item description
Material Cost for Renewal of Jetty Recess Ladders
Service charge for Renewal of Jetty Recess Ladders
Material cost for Removal/ Refitting and replacement of Cope Timber
Service charge for Removal/ Refitting and replacement of Cope Timber
Material cost for Replacement of Cope box covers
Service charge for Replacement of Cope box covers
Material cost for Replacement of Jetty Manhole covers and beading
Service charge for Replacement of Jetty Manhole covers and beading
Periodical Routines (Number of Occasions during the entire contract specified in column 4)
Material cost for Painting of one in number Electrical Level Luffing (South Jetty Wharf Crane)
Service charge for Painting of one in number Electrical Level Luffing (South Jetty Wharf Crane)
Material cost for Painting of Jetty Walls
Service charge for Painting of Jetty Walls
Material cost for Painting of all 248 in number of Cope Timbers/ Boxes
Service charge for Painting all 248 in number of Cope Timbers/ Boxes
Material cost for Painting of entire 600 meters of Jetty Guard Rails
Service charge for Painting of entire 600 meters of Jetty Guard Rails
Material cost for Painting of All Lattice masts, High mast Llight and Light poles
Service charge for Painting of All Lattice masts, high mast Llight and light poles.
Material cost for Painting of all 25 Lightning Arrestor Points
Service charge for Painting of all 25 Lightning Arrestor Points
Material cost for Painting of all 600 meter Fresh Water and De-mineralised Water Pipe lines
Service charge for Painting of all 600 meter Fresh Water and De-mineralised Water Pipe lines
Material cost for Painting of all 45 in number Bollards
Service charge for Painting of all 45in number Bollards
Material cost for Painting of all 17 in number Jetty Hydrants
Service charge for Painting of all 17 in number Jetty Hydrants
Material cost for Painting of all 26 in number Pillar boxes for electrical supports
Service charge for Painting of all 26 in number Pillar boxes for electrical supports
Material cost for Cement washing of entire area of Naval Jetties at NSRY (Kochi)
Service charge for Cement washing of entire area of Naval Jetties at NSRY (Kochi)
Material cost for daily Cleaning of Galleries/ Recesses/ Cope points
Service charge for daily Cleaning of Galleries/ Recesses/ Cope points
Material cost for daily rust removal from entire Jetty crane rails and coating coating of all jetty Crane rails with oil.
Service charge for daily rust removal from entire Jetty crane rails and coating coating of all jetty Crane rails with oil.
Other Charges, if any (Breakdown should be given in additional sheet of BoQ)
Reji kr
CochinRefrigerations
BOLGATTY MARINE
MY ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .