| 1 | L1₹26.0 CrAdmitted-Finance | ₹26.0 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SEABLUE SHIPYARD LTD L1 |
|---|---|---|---|---|
| 1.00SUMMARY OF QUOTATION | ||||
| 1.01 | Services
Total Cost of Dry Dock Hire Charges and other Admin & General Services quoted in the BoQ | 1 | Nos | 1,89,12,660 ₹1.9 Cr |
| 1.02 | Cost of repair part :-
(a) Total cost of Hull Work Package | 1 | Nos | 10,81,74,110.63 ₹10.8 Cr |
| 1.03 | (b) Total cost odf Engineering Work Package | 1 | Nos | 3,44,53,639.78 ₹3.4 Cr |
| 1.04 | (c ) Total cost of Electrical Work Package | 1 | Nos | 4,08,20,435.85 ₹4.1 Cr |
| 1.05 | GST on serial 1.01 to 1.04 | 1 | Nos | 1,01,18,042.31 ₹1.0 Cr |
| 1.06 | Total Budgeary Cost of Spares | 1 | Nos | 4,50,35,557.23 ₹4.5 Cr |
| 1.07 | GST applicable for 1.06 | 1 | Nos | 22,51,777.86 ₹22.5 L |
| 1.08 | Any other Taxes & Duties | 1 | Nos | - |
| 1.09 | Miscellaneous (not included in any of the serial above) | 1 | Nos | - |
Tender Value
Refer Docs
EMD Value
₹65 L
Closing Date
24 Jul 2025, 1:00 pmClosed
The Admiral Superintendent
Naval Ship Repair Yard Naval Base Kochi
Dry Docking and Allied Repairs of INS Kabra MR 25
2025_NAVY_714849_1
PP/18/3480/KABRA/MR/25
Open Tender
Marine Services
180 days
NSRY Kochi
Shipyard must have own dry dock ship lift facility to undertake the SoW in geographical Vicinity of NSRY Kochi. No sub contracting. Dry Dock ship lift should be capable to dock Kabra. Should have successfully completed atleast 3 refits of IN Ships
9 documents required · 9 mandatory
₹0
₹65 L
Yes
NSRY Kochi
3 Sept 2025
18 Jun 2025
25 Jul 2025
18 Jun 2025
24 Jul 2025
4 Jul 2025
18 Jun 2025 - 20 Jun 2025
24 Jun 2025
Amount
SUMMARY OF QUOTATION
Services Total Cost of Dry Dock Hire Charges and other Admin & General Services quoted in the BoQ
Cost of repair part :- (a) Total cost of Hull Work Package
(b) Total cost odf Engineering Work Package
(c ) Total cost of Electrical Work Package
GST on serial 1.01 to 1.04
Total Budgeary Cost of Spares
GST applicable for 1.06
Any other Taxes & Duties
Miscellaneous (not included in any of the serial above)
GST if any on serial 1.09
Description of Work / Item(s)
Amount
INSTRUCTIONS TO SHIPYARDS
(A) FIRM TO QUOTE FOR ALL SERIALS. BULK/LUMPSUM COSTING IS NOT ALLOWED. ALL PAYMENTS WILL BE BASED ON THE ACTUAL DAYS/ACTUAL QUANTITY OF SCOPE OF WORK UNDERTAKEN AS PER WCC ON NOT EXCEEDING BASIS. (B) ALL SPARES ARE TO BE SOURCED THROUGH OEM AND OEM SUPERVISION IS TO BE ENSURED FOR ROUTINE/REPAIRS OF ALL EQUIPMENT. (C) IF SHIP REFIT AT YARD PREMISES CONTINUES BEYOND 90 DAYS FOR ANY REASON, ALL ADMIN/GENERAL SERVICES ARE TO BE EXTENDED WITHOUT ADDITIONAL COST.
FIRM IS REPONSIBLE FOR THE SAFETY OF THE VESSEL AND THE VESSEL'S PROPERTY FROM INCLEMENT AND ADVERSE WEATHER, FOR SAFETY AND SECURITY OF ALL ITEMS/ MATERIAL/EQUIPMENT THAT IS DEGUTTED/REMOVED FROM ONBOARD THE SHIP AND THE SAME ITEM IS TO BE FITTED ONBOARD. FIRM IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITH 2 SENTRIES ROUND THE CLOCK. FIRM EXECUTIVES / STAFF / WORKERS / CONTRACTORS SHALL STRICTLY ABIDE BY ALL NAVAL PROCEDURES / INSTRUCTIONS INTIMATED VERBALLY OR IN WRITING BY SHIP'S OFFICERS AND PROJECT MONITORING OFFICERS. ALL YARD WORKERS / CONTRACTORS / STAFF ENTERING ONBOARD FOR WORK SHALL BE IN POSSESSION OF VALID ID CARDS AND SHALL SHOW THE SAME WHILE ENTERING / LEAVING OR AS DIRECTED. THE PASSES FOR OFFICERS, PMT AND SAILORS (INCLUDING CAR & BIKE) TO BE ISSUED WITHIN 5 DAYS OF THE ARRIVAL OF THE VESSEL WITH VALIDITY TILL COMPLETION OF REFIT. PROVIDE DEDICATED PARKING SPACE FOR VEHICLES OF SHIP’S OFFICERS AND SAILORS. THE ENTRY/ EXIT TO SHIP YARD WILL CONTINUE EVEN IN ABSENCE OF PASSES.
PRIORITY CLEARANCE TO ALL NAVAL OFFICERS FOR ENTRY/EXIT TO YARD, SAILORS OF THE SHIP AND PROJECT MONITORING TEAM INCLUDING CONTRACT STAFF TO BE GIVEN SPECIAL CHANNEL FOR UNINTERRUPTED MOVEMENT). YARD TO PERMIT UNRESTRICTED ENTRY /EXIT OF MATERIAL/ SPARES/ ITEMS/ EQUIPMENTS ON SHIP'S AND PROJECT MONITORING OFFICER'S LETTER AT ANY HOUR OF THE DAY. IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY YARD ON VERBAL INTIMATION/EMAIL/LETTER FROM SHIP AND PROJECT MONITORING TEAM. YARD TO PERMIT ENTRY/EXIT OF INDIVIDUALS AND MATERIALS OF NSRY(KOC) AND ANY FIRM /COMPANY/ ORGANIZATION /GUESTS ONBOARD THE VESSEL ON SHIPS AND PROJECT MONITORING OFFICERS LETTER. PREFERRENTIAL /IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY YARD BY VERBAL INTIMATION /EMAIL/LETTER FROMN SHIP OR PROJCT MONITORING TEAM. ALL WORKERS/ SUBCONTRACTORS ETC TO BE CHECKED/SCANNED PRIOR ENTRY ONBOARD THE SHIP AND ALSO ALL ITEMS/BAGS TO BE X-RAYED. CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE MAINTAINED FOR THE CONTRACTED DURATION.
GENERAL SERVICES
PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED THIRD PARTY INSPECTING AGENCY VIZ. LRS, IRS, ABS ETC.
A DETAILED MASTER PERT /GANTT CHART TO BE SUMITTED TO NSRY AND SHIP (IN HARD AND SOFT MEDIA) ON TWO WEEKS PRIOR COMMENCEMENT OF REFIT.
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I AND VERSION - II AS PER NHQ APPROVED DOCKING PLAN. FIRM TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION.
DOCKING IN VERSION I AND II - FIRST DAY CHARGES
SUBSEQUENT DAYS IN DOCK IN VERSION-I (45 DAYS) AND VERSION-II (15 DAYS). FIRM TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITHIN DRY DOCK TIME. ELSE FIRM TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT.
ARRANGE TUG AND PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY. SULLAGE BARGE TO BE PROVIDED ON THREE OCCASIONS. PAYMENT BASED ON THE ACTUAL TIMES AS PER WCC ON NOT EXCEEDING BASIS.
MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION. PAYMENT BASED ON THE ACTUAL TIMES AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE WHARFAGE/ WET BASIN FACILITIES (WITH 7 M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OFPROJECT AT FIRM'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
PROVISION OF STABILISED POWER SUPPLY 3 PHASE, 415V, 50HZ, FOR 60 DAYS IN DRY DOCK & FOR THE DURATION OF STAY IN WHARFAGE INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY FIRM) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY FIRM. QUOTE FOR 1000 KWH/DAY. PAYMENT BASED ON THE ACTUAL DAYS/ACTUAL READING AS PER WCC ON NOT EXCEEDING BASIS. FIRM TO INSTALL POWER . SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY FIRM METER/ ENERGY METER IN SUPPLY LINE
PROVIDE PORTABLE 100 KW DA INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/ SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT ONLY). FIRM REQUIREMENTS VIZ. DA REQUIREMENT VIEW NON AVAILABILITY OF SHORE SUPPLY TO BE CATERED SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE 03 SEA WATER FIRE MAINS WITH 07 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBRATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON START OF REFIT
SHIPYARD TO PROVIDE PORTABLE AC UNITS (TOTAL 120 TR CAPACITY) WITH AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES (MINIMUM)TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
PROVIDE FRESH WATER 03 TONS PER DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. QUOTE TO INCLUDE NECESSARY CONNECTION / DISCONNECTION
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (35 KG EACH) TWICE PER DAY FROM SHIP. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE CRANE, ONE LISTER AND ONE FORK LIFT DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER (04 MEN), TRAILOR, MOBILE CRANE (02 NOS, 5 TONNE EACH), FORK LIFT AND OTHER REQUIRED ACCESSORIES. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVISION/ ARRANGEMENT FOR DEFUELING, STORAGE OF FUEL(15KL) AFTER DEFUELING AND SURVEYED TO IOC IS THE RESPONSIBILITY OF SHIPYARD. VENTILATING, GAS FREE CERTIFICATION AND TANK CLEANING OF ALL 12 TANKS TO BE UNDERTAKEN.
PROVIDE 15 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT. NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
TEMPORARY LIGHTING AND VINTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKSMUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF 05 PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 02 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
05 NOS PORTABLE VENTILATION BLOWERS NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR VENTILATION OF THE COMPARTMENTS AND TANKS (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY)
ADMIN SERVICES
TWO SEPARATE SHORE TOILETS AND WASHROOMS FOR SHIP'S OFFICERS AND CREW RESPECTIVELY SUITABLE FOR 06 OFFICERS AND 70 SAILORS NEAR TO SHIPS BERTH / DOCK (WITHIN 100 MTRS FROM THE SHIP). OFFICERS - ONE, SAILORS - THREE. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
01 AC DINING HALL WITH LEATHER SOFA SET, DINING TABLE AND CHAIRS, TV WITH DTH CONNECTION, MUSIC SYSTEM AND ADEQUATE CUTLERY DINING OF 06 OFFICERS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
01 AC DINING HALL SUITABLE FOR DINING TABLE AND CHAIRS, TV WITH DTH CONNECTION, MUSIC SYSTEM AND ADEQUATE CUTLERY FOR DINING OF 70 SAILORS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
SUPPLY 200 LITRES OF PACKED DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (INCLUDING OFFICE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, FIRMLY MOUNTED GODREJ SAFE, 01 STRONG LOCKER AND 03 VISITORS CHAIRS AND DINING TABLE WITH CHAIR) WITH ATTACHED TOILET FOR COMMANDING OFFICER. PROVIDE 02 DAILY NEWSPAPERS (HINDI/ENGLISH) TO SHIP FOR THE ENTIRE DURATION OF STAY IN SHIPYARD. PAYMENT AT ACTUALS. FOR REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (03 ROOMS/CONTAINERS) FOR OFFICERS. INCLUDING 05 TABLE, 05 EXECUTIVE CHAIR, AND 10 VISITORS CHAIRS FOR REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
AC OFFICE SPACE FOR REFIT OFFICE (HALL WITH SEPERATORS/ ROOMS(06)/ CONTAINERS(06) FOR OFFICERS VIZ, ENGG OFFICE, ELE OFFICE, HULL OFFICE, GUNNERY/SS OFFICE, SHIPS/REG OFFICE AND REFIT OFFICE, SIX TABLES, 20 CHAIRS AND 08 RACKS WITH LOCK FOR FILE KEEPING ARE TO BE PROVIDED FOR REFIT DURATION. PROVIDE ALL-IN-ONE-PC WITH MULTIFUNCTION COLOUR LASER PRINTER AND 02 BROAD BAND CONNECTION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE FOUR 40 FT CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF SPARES / ITEMS DURING REFIT TIME.
PROVIDE 02 AC CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF CRITICAL SPARES / ITEMS DURING REFIT TIME. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
TWO PRINTERS WITH EIGHT SUITABLE CATRIDGES AND ONE HEAVY DUTY COPIER/ PRINTER WITH TWO SUITABLE TONERS ARE TO BE PROVIDED.
STATIONARY, AS INDICATED BY RMT, IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT(PLANNING & COMMERCIAL) OFFICE OF NSRY FOR Rs 50,000/-. PAYMENT AT ACTUALS.
PROVIDE ONE CHANGING ROOM WITH LOCKERS AND ATTACHED WASH ROOM FOR NSRY(K) WORKERS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
STAGING TO BE PROVIDED ON REQUEST OF NSRY(K) / SS AS NECESSARY. PAYMENT BASED ON ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE TWO FIVE SEATER AC CARS FOR FOR PROJECT OFFICERS OF NSRY, KOCHI (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE ONE FIVE SEATER AC CAR FOR SHIP'S COMMANDING OFFICER (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ONE AC SEVEN SEATER FOR SHIP'S OFFICERS (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2018, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ONE BUS (50 SEATER) FOR NSRY(KOC) WORKERS (15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVISION OF ONE MINI LORRY OF FOUR TONNE CAPACITY FOR TRANSPORTING SHIP'S MATERIALS/ITEMS/ SPARES.(15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ONE 18 SEATER MINI BUS FOR SHIP'S COMPANY (15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ONE 18 SEATER MINI BUS FOR SHIP'S DUTY WATCH (15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
HULL - PART I
SHIPYARD TO UNDERTAKE COMPLETE STEEL RENEWAL/BUILD UP STRICTLY INDICATED IN HULL SURVEY REPORT AND RENEW/REPAIR CORROSSION / UNDULATION / PITTING ETC AT ALL LOCATIONS INCLUDING TANKS / SEA TUBE / SEA CHEST / HULL PLATES/ RUDDER / BRIDGE TOP/ SOFT PATCH / MACHINERY EQUIPMENT FOUNDATION / HAWSE PIPE / FAIR LEAD / BOLLARD/ BULWARK PLATE/ DECK FITTINGS/ MISC FITTINGS ETC AS BROUGHT OUT IN HULL SURVEY REPORT. SHIPYARD TO QUOTE FOR NECESSARY DE-GUTTING / RE-GUTTING INCLUDING COST OF SPARES LIKE LAGGING ETC. COATING / PAINTING TO BE RESTORED POST STEEL RENEWAL. PAYMENT ON ACTUALS, APPROX 30 TONS OF STEEL RENEWAL ENVISAGED. ALL HOT WORK ARE TO BE UNDERTAKEN INCLUDING ALL SAFETY REQUIREMENT INCLUDING HOT WORK SENTRIES. PAYMENT BASED ON THE ACTUAL STEEL RENEWAL UNDERTAKEN AS PER WCC ON NOT EXCEEDING BASIS.
MR -1 REMOVE MARINE FOULING FROM THE HULL USING WOODEN SCRAPPER OR HYDRO JETTING WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACCESS OF EXTERNAL SHIP SIDE AREA . MT - 11023
MR -2 CARRY OUT 100% VISUAL AND 100% USG SURVEY OF COMPLETE UNDERWATER HULL AND BOOT TOP INCLUDING WIND AND WATER AREAS I.E. AREA UP TO 500MM ABOVE BOOT TOP AREA IAW NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACESSE OF EXTERNAL SHIP SIDE AREA MT- 11023 (A) IF ANY PLATE/AREA FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
MR- 3 RENEW COMPLETE PAINT SCHEME OF ENTIRE UNDERWATER HULL INCLUDING BOOT TOP AREA POST ADEQUATE SURFACE PREPARATION. PAINTING TO BE CARRIED OUT IAW NO 53/16/ POLICIES/ NCD IN VOGUE. PAINT TO BE SUPPLIED BY SHIPYARD. MT- 11023
POST REMOVAL OF ANTIFOULING PAINT. SURVEY TO BE UNDERTAKEN AND ACCORDINGLY TOUCH/UP MAINTENANCE OF ANTICORROSIVE PAINT WHERE EVER REQUIRED. PAINT TO BE SUPPLIED BY SHIPYARD.
MR-4 EXCESSIVE AREAS OF BREAKDOWN OF ABRASIVE ANTICORROSIVE PAINTS ARE TO BE BLASTED AND RECOATED WITH FULL PAINT SCHEME. SURFACE PREPARATION TO BE UNDERTAKEN IAW WITH NO 53/16. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACCESS OF EXTERNAL SHIP SIDE AREA PAINT SCHEME. REPAIRS IS TO BE UNDERTAKEN IAW IHQ, MOD (N) POLICY LETTER NC/0528/LLPS DATED 20 JUL 11 AND NCD 1491 ISSUE 1 OF MAY 11. MT- 11023
MR-5 PAINT SCHEME OF ALL TECHNICAL WINDOWS WHEREVER CUT, TO BE RESTORED IAW NO 53/16. TEST AND TRIALS OF ALL RENEWED PLATES ARE TO BE CARRIED OUT IAW PARA 42 AND 43 OF NO 01/15. PAINT TO BE SUPPLIED BY SHIPYARD.MT- 11023
MR 1- CARRY OUT 100 % VISUAL AND 100% ULTRASONIC GAUGING AND 100% ROBOTIC SCANNING OF EXTERNAL UNDERWATER HULL AREAS I.A.W. IHQ MOD LETTER NC/7631 DATED 01 NOV 22. DEGUTTING/REGUTTING OF LAGGING, PIPELIENS AND CHECKERED PLATE IS TO BE UNDERTAKEN IN BILGES FOR SURVEY,. MT- 10223 (A) IF ANY PLATE/AREA FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
CARRY OUT 100 % VISUAL AND 100% ULTRASONIC GAUGING OF WEATHER DECK AND ALL ASSOACIATED FITTINGS I.A.W. IHQ MOD LETTER NC/7631 DATED 01 NOV 22. WEATHER DECK INCLUDES BRIDGE TOP(ALUMINIUM), FLAG DECK(ALUMINIUM), FER SOFT PATCH AND AER SOFT PATCH.MT- 10223 (A) IF ANY PLATE/AREA FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
CARRY OUT 100 % VISUAL AND 100% ULTRASONIC GAUGING OF INTERNAL ABOVE WATER COMPARTMENTS INCLUDING SUPERSTRUCTURE I.A.W. IHQ MOD LETTER NC/7631 DATED 01 NOV 22. DEGUTTING/REGUTTING OF LAGGING, PIPELINES , PANELING IS TO BE UNDERTAKEN FOR SURVEY.MT- 10223 (A) IF ANY PLATE/AREA FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
CARRY OUT 100 % VISUAL AND USG OF 16 SEA TUBES AND ALL UW OPENING AND OBDS I.A.W. IHQ MOD LETTER NC/7631 DATED 01 NOV 22. DEGUTTING AND REGUTING OF GRATING IS TO BE UNDERTAKEN FOR SURVEY. CARRY OUT 100 % ENDOSCOPY OF 16 SEA TUBES AND ALL UW OPENINGS AND OBD. ENDOSCOPY OF SEA TUBES AND OBDS TO CARRIED AFTER REPAIR ALSO, IF ANY.MT- 10223 (A) IF ANY SEA TUBES, UW OPENINGS AND OBD FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
CARRY OUT 100 % VISUAL AND 100% ULTRASONIC GAUGING OF 12 FUEL AND LUB OIL TANKS I.A.W. IHQ MOD LETTER NC/7631 DATED 01 NOV 22 .MT- 10223 (A) IF ANY PLATE IN TANK FOUND UNSAT IN SURVEY REPORT, SAME TO BE RENEWED. (B) DP TEST OF WELD JOINT IS TO BE PROVED.
FIRM TO PROVIDE HULL SURVEY REPORT (COMPRISING OF VISUAL SURVEY, USG SURVEY, ENDOSCOPY SURVEY AND HAMMER SURVEY REPORT OF UW HULL, ABOVE WATER AREAS AND INTERNAL COMPARTMENTS) PRIOR COMPLETION OF THE REFIT . MT- 10223
MR 1-CARRYOUT ABRASIVE BLASTING CONFORMING TO SWEDISH STD SA-2.5 STD/ HYDRO BLASTING CONFORMING TO WJ-2L STD OF COMPLETE ABOVE WATER PLATING INCLUDES SHIP SIDE, DECK FITTINGS, ABOVE WATER AREA INCLUDING ALL THE THREE WATER JET & SUPER STRUCTURE. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACESSE OF EXTERNAL SHIP SIDE AREA TO FACILIATE SURVEY OF THE STRUCTURE FOR RENEWALS & PAINTING MT - 12206
MR 3 RENEW COMPLETE PAINT SCHEME OF COMPLETE ABOVE WATER PLATING INCLUDES SHIP SIDE, DECK FITTINGS, ABOVE WATER AREA INCLUDING ALL THE THREE WATER JET & SUPER STRUCTURE AS PER NO 53/16 AND CORRESPONDING NCDS. A BAND OF 2 INCH NEAR EDGE OF BULKHEADS, VERTICAL STRUCTURES ETC TO BE OMITTED WITHOUT APLLICATION OF NON-SKID TOP COAT IAW HQSNC LETTER NC/3000/11 DATED 10 MAY 23. PAINT TO BE SUPPLIED BY SHIPYARD. OEM CERTIFICATE OF PAINT BE PROVIDED POST COMPLETION OF PAINTING. WORKING PROROCOL IAW NCD AND TO BE SIGNED BY ALL STAKE HOLDERS PRIOR COMMENCEMENT OF EACH COAT OF PAITNING.
MR 1 - THE FOLLOWING JOBS TO BE CARRIED OUT IN FUEL OIL TANKS: - (A) VENTILATE 09 FUEL TANKS FOR 24 HOURS IAW INBR 3000 AND PROVIDE GAS FREE CERTIFICATE POST ADEQUATE VENTILATION. MANUALLY CLEANING AND DRY 03 NOS F.O TANK, 02 NO. FUEL OIL READY USE TANKS, 02 DIRTY TANK AND 02 LUBE OIL RU TANK. 09 EXHAUST BLOWER ALONG WITH HOSES IS TO BE PROVIDED FOR VENTILATION.
(B) CLEAN ALL FUEL/ LUB TANKS TO REMOVE DIRT, SLUDGE, DEBRIS AND LOOSE PAINT. SCRAP CHIP CLEAN CORRODED/ RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE FOR SURVEY/ INSPECTION BY YARD/ TRIAL AGENCY. RESTORE OM 750 COATING. ALL PRECAUTIONS AGAINST FIRE EXPLOSION, TOXIC AND OBNOXIOUS FUMES ARE TO BE TAKEN IN ACCORDANCE WITH B.R. 1754MT - 16123
(C) RESTORE / RENEW COMPLETE PAINT SCHEME OF FUEL/LUB OIL TANKS IAW NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE(OM 750) SMEARING . PROVIDE OEM CERTIFICATE OF OM 750 TO SS ON COMPLETION OF APPLICATION MT - 16123
(D) UNDERTAKE 100% AIR PRESSURE TEST OF ALL FUEL/LUB OIL TANKS POST COMPLETION OF ALL HOT WORK. IN PRESENCE OF SS AND TRIAL AGENCY, PROVIDE CERTIFICATE. DR ENTAILS (A) IF ANY TANK FAILED IN PRESSURE TESTING . NECESSARY REPAIRS TO BE CARRIED OUT (B) PRESSURE TESTING OF TANK IS TO BE PROVED.
MR 1- VENTILATE 01 FRESH WATER TANK FOR 24 HOURS IAW INBR 3000 AND PROVIDE GAS FREE CERTIFICATE POST ADEQUATE VENTILATION. EXHAUST BLOWER ALONG WITH HOSES IS TO BE PROVIDED FOR VENTILATION . MT - 16260
MR 2- CLEAN ALL FW TANKS TO REMOVE DIRT, SLUDGE, DEBRIS AND LOOSE PAINT. SCRAP CHIP CLEAN CORRODED/ RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE FOR SURVEY/ INSPECTION BY YARD/ TRIAL AGENCY. MT - 16260
MR 3- CARRY OUT 100% VISUAL SURVEY AND 100% USG SURVEY OF ALL FW TANKS/ TANK TOPS IN ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 . MT - 16260
MR 4 REPAIR/TOUCHUP OF WHEREVER REQUIRE PAINT SCHEME OF FW TANKS IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE. PAINT TO BE SUPPLIED BY SHIPYARD.
MR 5 UNDERTAKE 100% AIR PRESSURE TEST OF FW TANKS IN PRESENCE OF SS AND TRIAL AGENCY, PROVIDE CERTIFICATE. (A) IF ANY TANK FAILED IN PRESSURE TESTING NECESSARY REPAIR IS TO BE CARRIRED OUT AND PRESSURE TESTING IS TO BE PROVED)
(A) VOID COMPARTMENT - 02 NOS MT - 16473 MR 1- VENTILATE AND OBTAIN GAS FREE CERTIFICATE. CLEAN ALL COFFERDAMS AND VOID SPACES TO REMOVE DIRT, SLUDGE, DEBRIS AND LOOSE PAINT. SCRAP CLEAN CORRODED/ RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE FOR SURVEY/ INSPECTION BY YARD/ TRIAL AGENCY.
MR 2- CARRY OUT 100% VISUAL SURVEY AND 100% USG SURVEY OF ALL COFFERDAM/ VOID SPACES (02 NO) INTERNALLY AND TANK TOPS. REPAIR/ RENEW AS PER SURVEY REPORT.
MR 3- RENEW COMPLETE PAINT SCHEME OF COFFERDAMS AND VOID SPACES POST SURVEY AND RENEWAL IAW NO 53/16/ NCD 1491 /POLICY DIRECTIVES ISSUED BY IHQ/DNA AS APPLICABLE. PAINT TO BE SUPPLIED BY SHIPYARD. OEM CERTIFICATE OF PAINT BE PROVIDED POST COMPLETION OF PAINTING.WORKING PROROCOL IAW NCD 1491 TO BE SIGNED BY ALL STAKE HOLDERS PRIOR COMMENCEMENT OF EACH COAT OF PAITNING
MR 4- RENEW 100% SACRIFICIAL ANODES FITTED IN COFFERDAM AND VOID SPACES. QTY- 04. ANODE TO BE PROVIDED BY SHIPYARD.(MK-X)
MR 5 -UNDERTAKE 100% AIR PRESSURE TEST OF ALL COFFERDAM AND VOID SPACES. DR ENTAILS (A) IF ANY VOID SPACE FAILED IN PRESSURE TESTING, NECESSARY REPAIRS/PLATE RENEWAL TO BE CARRIED OUT (B) PRESSURE TESTING OF VOID SPACE IS TO BE PROVED AFTER CARRYING OUT REPAIRS ALSO.
MR-1 COMPLETELY DRY AND CLEAN 100% STRUCTURE OF BILGES IN MACHINERY SPACES AND PREPARE SURFACE FOR SURVEY BY DOCKYARD. SURFACE ARE TO BE PREPARED TO ST 3 STANDARD IAW NO 01/15. JOB MAY INVOLVE REGUTTING/DEGUTTING OF CHECKED PLATE AND PIPELINES . AREA: WJ COMPARTMENT, AER, FER, BAGGAGE STORE, PUMP ROOM, AMMO LOCKER AND CANVAS STORE. MT - 13723
MR- 2 CARRY OUT 100% INTERNAL VISUAL SURVEY AND 100% USG OF MACHINERY SPACES, BILGES, PLATING’S, BULKHEADS, MACHINERY SEATS, TANK TOPS AND MAJOR STRENGTH MEMBER FOR CORROSION AND DETERIORATION OF HULL STRENGTH IN ACCORDANCE WITH NO 01/15. (AREA WJ COMPT, AER, FER, BAGGAGE STORE, PUMP ROOM, AMMO LOCKER AND CANVAS STORE.) DR ENTAILS (A) IF ANY AREA/PLATE FOUND DEFECTIVE/UNSAT IN SURVEY REPORT SAME TO BE RENEWED (B) DP TEST OF WELD JOINT IS TO BE PROVED.
MR- 3 UNDERTAKE MAINTANCE TOUCH-UP OR PAINT SCHEME RENEWAL POST REQUISITE SURFACE PREPARATION OF MACHINERY SPACES / BILGES IAW NCD 1491 AND NO 53/16. (AREA WJ COMPT, AER, FER, BAGGAGE STORE, PUMP ROOM, AMMO LOCKER AND CANVAS STORE) PAINT TO BE PROVIDED BY SHIPYARD. OEM CERTIFICATE OF PAINT BE PROVIDED POST COMPLETION OF PAINTING.WORKING PROROCOL IAW NCD 1491 TO BE SIGNED BY ALL STAKE HOLDERS PRIOR COMMENCEMENT OF EACH COAT OF PAINTIING.
(A) PAINTING OF ALUMINUM DECK (NO 01 AND 02) (I) 01 COAT OF PRIMER DFT 50 MICRONS (II) 02 COAT OF ANTICORROSIVE PAINT DFT 125 MICRONS (III) 02 SUCCESSIVE COATS OF EPOXY HEAVY DUTY NON SKID(DARK GREY) DFT 250 MICRONS EACH. A BAND OF 2 INCH NEAR EDGE OF BULKHEADS, VERTICAL STRUCTURES ETC TO BE OMITTED WITHOUT APLLICATION OF NON-SKID TOP COAT IAW HQSNC LETTER NC/3000/11 DATED 10 MAY 23.
MR-1 CARRYOUT ABRASIVE BLASTING CONFORMING TO SWEDISH STD SA-2.5 STD/ HYDRO BLASTING CONFORMING TO WJ-2L STD OF COMPLETE EXPOSED SUPER STRUCTURE INCLUDING FITTINGS IE MAST, FUNNEL, DECK FITTINGS AND FOUNDATIONS. ETC. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACCESS OF SUPERSTRUCTURE AND MAST. MT-12231
MR-2 UNDERTAKE 100% VISUAL SURVEY OF COMPLETE EXPOSED SUPER STRUCTURE INCLUDING MAST AND FUNNEL AND USG OF AREAS FOUND CORRODED DURING VISUAL SURVEY POST UHP BLASTING. CARRY OUT REPAIR/RENEWAL OF DEFECTIVE AREA.
MR- 3 ON COMPLETION OF STRUCTURAL REPAIRS, UNDERTAKE APPLICATION OF FULL PAINT SCHEME, WITH REQUISITE SURFACE PREPARATION AS PER NO 53/16 AND NCD1493. ERECTION OF SCAFOLDINGS TO BE UNDERTAKEN FOR EASY ACESSE OF SUPERSTURCTURE AND MAST FOR PAINTING
MR 1 - CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF 16 IN NOS SEA CHEST. JOB INVOLVES MILLING OF ZINC ANODES INTO CYLINDRICAL SHAPE AND THREADING AT ONE END TO ASCERTAIN FITMENT IN SEA CHEST. ANODES TO BE CATERED BY SHIPYARD
MR 2 - CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF 48 IN NOS WATER JET UNIT AREAS,. JOB INVOLVES REMOVAL AND FITMENT OF SACRIFICIAL ANODES BY WELDING OF STUDS AND CLAMPS. ANODES TO BE CATERED BY SHIPYARD
MR 1 - REMOVE CLEAN AND EXAMINE GRATINGS ON ALL INLETS AND DISCHARGES. EXAMINE PLATING COATINGS AND ZINC OF INLETS AND DISCHARGES AND AREA ADJACENT TO THEM, REPLACE GRATINGS ON COMPLETION OF ANY REPAIR AND RECOATING WORK ON INLETS, DISCHARGES AND GRATINGS. INLETS, DISCHARGES AND GRATINGS TO BE COATED IN ACCORDANCE WITH NO 53/16 AND POLICY ISSUED BY IHQ/DNA FROM TIME TO TIME. MT - 11620
MR- 3 RESTORE/RENEW PAINT SCHEME OF ALL UW SEA CHEST/ SEA TUBES/ OBDS WITH APPROPRIATE PAINT SCHEME POST COMPLETION OF SURVEY AND REPAIR/RENEWAL OF SEATUBES AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA TIME TO TIME. SEATUBES REMOVED FOR REPAIR/RENEWAL ARE TO BE ABRASIVE BLASTED AND COATED WITH PAINT SCHEME AS BEFORE FITMENT. FAIRING PLATES LAPS, WELDS ETC TO BE FAIRED WITH EPOXIDE PUTTY BEFORE APPLICATION OF PAINT. IHQ/DNA. FOR FAC CLASS SHIPS SEPARATE PAINT SCHEME AS APPROVED BY IHQ/DNA IS TO BE FOLLOWED.
MR 4 - ALL SEA TUBES ARE TO BE PRESSURE TESTED TO 2.5 KG/CM2 AFTER RENEWAL IN PRESENCE OF SS AND INSPCTION AUTHORITY. CERTIFICATE OF THE SAME TO BE PROVIDED.
MR 1- DEGUTTING/REGUTIING OF WC AND ITS ASSOCIATED FITTINGS FOR SURVEY OF WASHROOMS AND BATHPLACES. DR ENTAILS ;- (A) REMOVAL OF DECK COVERING (B) REMOVAL OF PANNELING (C) SURVEY (D) FITMENT OF PANELING. PANELS FOUND DEFORMED AFTER REMOVAL MUST BE REPLACED WITH NEW PANEL.
MR- 2 APPLICATION OF FRESH DECK COVERING/DADOE CASTING ON COMPLETION OF VISUAL SURVEY AND HAMMER SURVEY.
MR- 3 PROVISIONING OF INSPECTION WINDOW WITH LOCKING ARRANGEMENT ON EVERY THIRD PANEL ALONG WITH LOCKING MECHANISM IAW IHQ MoD(N) DIRECTIVES ON PANELING . MAT -SS
MR 1 - UNDERTAKE SURVEY OF GALLEYS AND DINING HALLS AREA ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 AS MENTIONED:- WORK INVOLVES (A) DEGUTTING/REGUTIING OF PANELS AND UNDERLAY. (B) REMOVAL/FITMENT OF FRIDGE , ATTA NIDDING MACHINE , RANGE, LOCKERS, GDU.
MR- 2 APPLICATION OF FRESH DECK COVERING/DADOE CASTING ON COMPLETION OF VISUAL SURVEY AND HAMMER SURVEY.
MR- 3 PROVISIONING OF INSPECTION WINDOW IN EVERY THIRD CONTINOUS PANEL ALONG WITH LOCKING MECHANISM IAW IHQ MoD(N) DIRECTIVES ON PANELING.
MR 1 - DEGUTTING OF LAGGING, SS PARTITION PANNELING, BUNK , KIT LOCKER , WOODEN FURNITURE AND OTHER PORTABLE/ SEMI-PORTABLE FITTINGS ETC TO BE CARRIED OUT IN 02 MESSES, CO CABIN , WARD ROOM, 03 OFFICERS CABIN, SHIPS OFFICE AND RADIO ROOM. MT - 13060
MR 2 -CARRY OUT 100% VISUAL AND 100% USG SURVEY OF INTERNAL AND EXTERNAL STRUCTURE AS PER NAVY ORDER 01/15.
MR 3 -FITMENT OF FAT INSULATION LAGGING TO BE CARRIED OUT IAW IHQ POLICY LETTER NC/POLICY/H-145/MATERIAL DATED 17 JUL 20. LAGGING TO BE PROVIDED BY SHIPYARD
MR 4 - SURFACE ARE TO BE PREPARED TO SA 2.5/ST 3 STANDARD AND TO BE PRESERVED WITH ADVANCED INTERNAL FINISH COATING IAW IHQ POLICY LETTER PP-144/2021/MB/NC/PAINT-NCD 1485 DATED 18 OCT 21 AS FOLLOWS:- (A) 02 COATS OF EPOXY RED OXIDE PRIMER UPTO A DFT OF 2X30 MICRON (B) 01 COAT OF ADVANCED INTERNAL FINISH COATING UPTO A DFT OF 110 MICRON . OEM- M/S ADVANCE PAINTS LTD & M/S GOA PAINTS LTD.PAINT TO BE PROVIDED BY SHIPYARD
MR 1 - ANCHOR CHAIN CABLE AND ACCESSORIES TO BE HYDROJET BLASTED TO BARE METAL SURFACE SO AS TO FACILITATE SURVEY BY DOCKYARD. 02 HALF SHACKLES, 07 FULL SHACKLES, 01 ANCHOR, 01 BLAKE SLIP, 01 BOTTLE SCREW SLIP, 02 SWIVEL ADAPTORS. POST SURVEY PAINTING OF ANCHOR Chain CABLE AND ACESSORIES TO BE UNDERTAKEN IAW IHQ MOD DNA POLICY LETTER PP-03/2022/MB/NC/PAINT DATED 01 FEB 22. PAINT TO BE SUPPLIED BY SHIPYARD. MT - 14323
MR 2- ALL LUGLESS JOINING SHACKLES, ANCHOR SHACKLES, LOCKER LUGGED SHACKLES AND SWIVEL PIECES ARE TO BE DISCONNECTED BEFORE CLEANING/CHIPPING TO REMOVE ALL PAINT AND RUST. LAY OUT ALL CABLES/ ANCHOR ROPES. BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. STRIP AND GREASE SLIP IN CABLE LOCKER. RE-ARRANGE CABLE LENGTH TO ENSURE EQUALITY OF WEAR. RE-MARK CABLE LENGTH. EXAMINE HULL ASSOCIATED FITTINGS. EXAMINE ALL SPARE CHAIN CABLE AND FITTINGS, CLEAN AND COAT WITH COLD BITUMINOUS PAINT.DISMANTLE ANCHOR AS PER NO 53/16 AND POLICY LETTER IN FORCE.
MR 3 CARRY OUT SURVEY OF ALL STOPPER ASSEMBLIES BY REMOVING THE JOINING SHACKLE AND OPEN UP THE PELICAN HOOK. HAMMER TEST ALL PARTS OF THE STOPPER ASSEMBLY, INCLUDING EACH CHAIN CABLE LINK AND THE PELICAN HOOK. VISUALLY EXAMINE ALL PARTS OF THE STOPPER ASSEMBLY FOR CRACK AND DISTORTION. CHECK PELICAN HOOK, BUCKLER LINK FOR OPERATION AND EASE OF MOVEMENT AND ABILITY TO SECURE THE PELICAN HOOK. IF THE BUCKLER LINK IS DIFFICULT TO OPERATE, IT MUST BE MADE WORKABLE BY CLEANING AND GREASING THE PIN. EXAMINE FOR CORROSION, PARTICULARLY IN STRESS AREAS. IAW NO 02/21.(IF REPAIR OF BLAKE SLIP AND BOTTLE SCREW SLIPS IS NOT FEASIBLE WHEN LINKS ARE FOUND EXCESSIVELY CORRODED, PARTED OR IF CHAIN IS MISSING, THE ITEM IS TO BE DECLARED UNSERVICEABLE.
MR 4 UNSCREW BOTTLE SLIP WHEREAS FITTED TO ITS FULLEST EXTENT AND THOROUGHLY CLEAN AND GREASE THREADS BEFORE ASSEMBLY
MR 5 UNDERTAKE SURVEY OF ADAPTER PIECE FOR CRACKS OR WEAR AND UNDERTAKE REPAIR AS PER NO 02/21.
MR 6 SURVEY ALL DECK FITTINGS ASSOCIATED WITH ANCHOR CHAIN CABLE ARRANGEMENT IE DECK EYES/ EYE PLATES INCLUDING GULLETINE/ GULLETINE ROLLER, COMPRESSOR WITH COMPLETE STRUCTURE WHEREAS FITTED PAYING PARTICULAR ATTENTION EYE PLATES/ EYE BOLTS ETC FOR WEAR, CORROSION/ DETERIORATION AND OVALITY OF HOLE. UNDERTAKE REPAIR/ RENEWAL IAW NO 02/21. QTY: 06 EYES, 02 ROLLER
MR 7- CHECK ORIGINAL DIA OF EACH PARTS OF ANCHOR, CHAIN CABLE AND ACCESSORIES FROM RIGGING WARRANT & OFFER THEM SURVEY TO DYD ALONG WITH IN 305 & ANCHOR TEST CERTIFICATE. FOR 17.5 MM DIA AND OF 255 KG OF DANFORTH ANCHOR
NOTE- ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM THROUGH OEM (M/S HI POINT SERVICES PVT LTD, MUMBAI) MR 1 OBTAIN INTERNATIONAL SEWAGE POLLUTION PREVENTION CERTIFICATE VALID FOR DURATION OF FIVE YEARS FROM A STATE AUTHORISED ACCREDITED AGENCIES AS SPECIFIED IN MEPC 115(51) AND 227(64) FOR THE SHIP ADOPTED ON 01 APR 04 AS PER REGULATION 5 OF REVISED ANNEX IV OF MARPOL 73/78 (NCD 3930, ISSUE 3, SEP 16 IS RELEVANT).
MR 2- UNDERTAKE RENEWAL OF ALL PVC PIPELINES AND PVC PLUG COCK VALVES. SPECIFICATION: 25 PVC VALVE OF DIFFERENT DIA
MR 3- OVERHAUL 100% OF ALL SEWAGE/ SYSTEM PIPELINES AND CHEMICAL CLEANING. DIA-50MM
MR 4- UNDERTAKE VISUAL SURVEY AND USG SURVEY OF V1 & V2 TANKS. IF THE CORROSION IS FOUND TO BE EXCESSIVE, UNDERTAKE REPAIRS.
MR 5 - UNDERTAKE CHEMICAL CLEANING OF SOIL PIPES
MR 6 - OVERHAULING OF ALL STARTERS
MR 7- CARRY OUT CLEANING / SURVEY OF V1 AND V2 TANKS AND REPAIR AS NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECOAT WITH APPROPRIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION. PAINT TO BE SUPPLIED BY SHIPYARD AS PER REQUISITE PAINT SCHEME.
MR 7- CARRY OUT CLEANING / SURVEY OF V1 AND V2 TANKS AND REPAIR AS NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECOAT WITH APPROPRIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION. PAINT TO BE SUPPLIED BY SHIPYARD AS PER REQUISITE PAINT SCHEME.
MR - 9 OVERHAUL / REPAIR THE FOLLOWING : (A) OVERBOARD PUMP-1 (B) DISCHARGE PUMP-1 (C) MACERATOR PUMP-1 (D) GREY WATER PUMP-1 (E) VACUMMERATOR PUMP -2 (F) BLOWER PUMP- 1 (G) BOOK CELL - 1
NOTE- ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM THROUGH OEM (M/S HI POINT SERVICES PVT LTD, MUMBAI) MR 1- OVERHAUL / REPAIR 100 % VALVES
MR 2- EXAMINE ALL TOILETS ARE FIRMLY FITTED TO BASE. CHECK FOR DAMAGES TO BOWL, SEAT COVERS, RUBBER COMPONENTS, FLUSH & DISCHARGE VALVES FOR DEFECTS / DAMAGES. RENEW IF DEFECTIVE.
MR 3- CARRY OUT CALIBRATION OF LOW AND HIGH LEVEL SWITCHES, PRESSURE SWITCHES AND VACUUM GAUGE. RENEW IF DEFECTIVE
MR4- CARRY OUT CLEANING / SURVEY OF COLLECTING TANKS/GREY WATER TANKS AND REPAIR. RESTORE PAINT SCHEME POST REPAIRS.
MR 5 -OVERHAUL 100% FOLLOWING VALVES(DIA 50 MM): A) GATE VALVES (02 NO.) B) STP ISOLATING VALVE (01 NO.) C) OVERBOARD DISCHARGE VALVE (01 NO.) D) EJECTOR SCREW DOWN VALVES (02 NO.) G) SEWAGE INLET ISOLATING VALVE (02 NO.)
MR -6: OVERHAUL EVAC DISCHARGE PUMP. RENEW WORN OUT MECHANICAL SEALS, BEARINGS ON PUMP AND FAN SIDE.
MR 7 -CHECK ALL FLEXIBLE HOSES AND REPLACE IF CRACKED / DAMAGED
MR 8 -(A) UNDERTAKE CLEANING OF ALL SYSTEM / SEWAGE PIPELINES AND REPAIR / RENEW AS NECESSARY(DIA 50 MM)
(B) RENEWAL OF SOIL PIPE LINE AT DAMAGED LOCATIONS. MATERIAL: GI , DIA: 2 1/2"
(C) GREY WATER TANK TO BE CLEANED THOROUGHLY, INSPECT THE INTERNAL COATING OF THE TANKS AND RECOAT AS NECESSARY AFTER MAINTENANCE WITH HIGH GRADE COAL TAR EPOXY.
(D) RENEW WATER LEVEL SENSORS OF GREYWATER TANK ALONG WITH CABLING AND CABLE JACK.
(E) RENEW EFD VALVE (SOLENOID VALVE)
MR9 - RENEW THE FOLLOWING: -
(A) RENEW VPC CONTROLLER
(B) RENEW FD VALVE
(C) RENEW PUSH BUTTON ASSEMBLY
MR 1 - DISMANTLE AND OVERHAUL STORM VALVES OF GALLEY DRAIN AND STP DRAIN. CHANGE SEAL, WHEEL CAP AND OTHER DEFECT. RECTIFY THE DEFECTS AND PRESSURE TESTED AS PER NO 01/15. - 15210
MR 2 - DISMANTLE AND OVERHAUL STORM VALVES OF DECK DRAINS IN WJCOMPT AND MESS DECKS DRAIN. RECTIFY THE DEFECTS AND PRESSURE TEST TO 2 KG PRESSURE ON COMPLETION OF REPAIRS, IF ANY. WORK INVOLVES REMOVAL& REFITMENT OF LAGGING ON SHIP SIDE IN SR.SLS MESS AND WASH SPACES. VALVE SIZE: 65 MM NB.MT - 15506
MR 3 DISMANTLE THE ENTIRE STRETCH OF DRAIN PIPES FROM DECK DRAINS. CHEMICALLY CLEAN THE PIPINGS FREE OF SOLID DEPOSITS AND REFIT THE SAME ON COMPLETION. . MATERIAL: GI, 2 1/2" . MT - 15506
(B) RENEWAL OF SOIL PIPE LINE AT DAMAGED LOCATIONS WITH SECURING BRACKET AND RUBBER SHEET. MATERIAL: GI , DIA: 2 1/2"
MR 1- OPEN AND CLEAN ALL DAMPERS AND OPERATING HANDLE FITTED IN TRUNKING AND FAN IMPELLERS IN BLOWERS. UNDERTAKE INSPECTION AND OPERATIONAL CHECKS OF ALL DAMPERS AND FAN IMPELLERS FOR THEIR CORRECT OPERATION. RENEW DAMPER AND OPERATING HANDLE. QTY: 05 DAMPER, 03 IMPELLER
MR 3 -CARRY OUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE
MR 4 - EXHAUST TRUNKING: INTERNAL SURFACES OF THE GALLEY CHIMNEY AND TRUNKING ARE TO BE THOROUGHLY DEGREASED AND CHEMICALLY CLEANED.ONE COAT OF PRIMER IS TO BE APLLIED ON THE INTERNAL SURFACE OF THE TRUNKING. WORK INVOLVES DEGUTTING AND REGUTTING OF VENT TRUNK INCLUDING 01 MUSHROOM HEAD-BLOWER ASSEMBLY AND SS PANELLING.
MR 5 - SUPPLY TRUNKING: INTERNAL SURFACES OF THE GALLEY SUPPLY TRUNKING ARE TO BE THOROUGHLY DEGREASED AND CHEMICALLY CLEANED.ONE COAT OF PRIMER IS TO BE APLLIED ON THE INTERNAL SURFACE OF THE TRUNKING. WORK INVOLVES DEGUTTING AND REGUTTING OF VENT TRUNK INCLUDING SS PANELLING . MT - 15023
MR 6- CHEMICAL CLEANING OF TRUNKING INVOLVES DEGUTTING/ REGUTTING OF SS PANNELING ON THE DECKHEAD AND BULKHEADS FOR ACCESSIBILITY TO TRUNKING MAINTENANCE. PANNELING AND OTHER OUTFITTINGS DAMAGED/ DEFORMED DURING THE DEGUTTING ARE TO BE RENEWED BY THE REPAIRING FIRM. MT - 15023
MR 7 - PRE REFIT AND POST REFIT VENTILATION TRIALS BE UNDERTAKEN AS PART OF REFIT ROUTINES( MAINTOPS) . MT - 15023
MR 8 - CHEMICALLY CLEAN HEAT EXCHANGER FINS AND COILS. JOB INCLUDES FOLLOWING :-
(A) DISMANTLING OF HEAT EXCHANGER UNITS OF 02 NOS ATUs 01 NO IN STP LOBBY CAP - STP LOBBY ATU- 22 TR (MAIN AHU NO 1) 01 NO IN FLAG DECK CAPACITY ATU- 6 TR (GALLEY AHU NO 2)
(B) CHEMICAL CLEANING OF HEAT EXCHANGER FINS AND COILS AND RENEWAL OF 50% DAMAGED COPPER TUBES OF ATU'S
(C) SURVEY AND RENEWAL OF ATU CASING STRUCTURE AND HEAT EXCHANGER STRUCTURE(BOTTOM PLATES AND BODY CASING PLATES) OF MAIN AHU MAT - MOULDED ZN SHEETS THICKNESS 2MM( FOR AHU 1 ONLY)
(D) RENEW 02 IN NOS FAN BEARINGS AND PULLEY AS PER SAMPLE IN BLOWER FAN OF MAIN AHU
(E) PRESSURE TEST THE HEAT EXCHANGER UNITS TO 12 KG PR FOR AHU 1 AND 2.
(F) DEGUTTING/ REGUTTING AND RENEWAL OF FOLLOWING : (MAIN AHU) (I) ATU CASING BOX (II) VENTILATION BLOWER - 01 NOS (III) VENTILATION DAMPERS - 02 NOS (IV) CHILLED GAS LINE - 5 RMT (VI) COLD LAGGING - 06 SQM (VII) MFMB LAGGING - 10 SQM
MR 1 - SPINDLES OF 15 IN NO MUSHROOM HEADS ON WEATHER DECKS TO BE SURVEYED AND CHECKED FOR FREE OPERATION. CARRYOUT RENEWAL OF SCREW SHAFTS AND OPERATING WHEEL, WIRE MESH (18 GUAGE) AND RUBBER BEADING AND REFITMENT IN SITU. THE DETAILS ARE AS FOLLOWS MT - 15023
(A) DISMANTLING OF MUSHROOM HEADS, OVERHAULING AND REFITMENT ON COMPLETION
(B) RENEWAL OF SCREW SHAFTS AS PER SAMPLE. MAT: SS. DIM: 25 MM DIA, 18 INCHES LONG AND SQUARE THREADS ON IT.
(C) RENEWAL OF WIRE MESH GUARDS ON THE MUSHROOM HEADS
(D) RENEWAL OF RUBBER BEADING ON THE WT FLAPS OF MUSHROOM HEAD AS PER SAMPLE
MR 1 - CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN MESS DECKS, DINING HALL, OFFICERS'S CABINS, OFFICES AND WARDROOM.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS WITH RUBBER BELOWS AS PER EXISTING ONES. MATERIAL OF KNOB : PLASTIC MOULDED . MT - 15023
MR 1 - CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN BRIDGE, GER, MCR AND GALLEY.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS AS PER EXISTING ONES AS PER SAMPLE . MT - 15023
MR 1 - CARRY OUT CHEMICAL CLEANING BY REMOVAL OF ENTIRE LENGTH OF TRUNKINGS IN MESS DECKS, OFFICE SPACES, ALLEWAYS, GALLEY AND STORES. GALLEY WORK INVOLVES REGUTTING AND DEGUTTING OF MODULAR SS PANNELINGS. PANELLING DAMAGED DURING DEGUTTING ARE TO BE RENEWED.TRUNKING ARE TO BE INTERNALLY COATED WITH 01 COAT OF PRIMER ZINC CHROMATE . MT - 15023
(B) PANELING TO BE DEGUTTED AND REGUTTED IN GALLEY AS ENVISAGED, APPROX 19 SQM
(C ) RENEWAL OF 08 NOS EXHAUST BLOWER AND MOTOR OF SHIP'S VENTILATION SYSTEM
(D) NEW GALLEY GREASE FILTERS TO BE PROVISIONED AS PER SAMPLE EXISTING IN SHIP
MR 1- MECHANICAL CHIPPING, SCRAPPING, WIRE BRUSHING ETC IN INACCESSIBLE AREAS OF CABLE LOCKER, RENEW WOODEN FLOORING, AND APPLICATION OF REQUISITE PAINT SCHEME POST RENEW, PAINT TO BE PROVIDED BY SHIPYARD.
MR 2- POST REMOVAL OF CHAIN CABLE, CLEAN OUT CABLE LOCKERS AND REMOVE PORTABLE PERFORATED PLATES/ GRATINGS. CLEAN AND DRY THE SUMP AREA AND SEE THAT SUCTION STRAINER AND BOX IS CLEAR. EXAMINE THE STRUCTURE INCLUDING CABLE CLENCH AND PERFORATED PLATES/ GRATINGS AND OFFER THE AREA TO YARD FOR SURVEY/ REPAIR AS NECESSARY, PAYING PARTICULAR ATTENTION TO THAT IN VICINITY OF CABLE CLENCH, SHIPS SIDE BEHIND PROJECTION PLATES AND BARS, JUNCTION BETWEEN PLATING AND HORIZONTAL STIFFENERS AND SUMPS. ENSURE THAT THE INBOARD END OF THE CABLE IS PROPERLY SECURED TO THE CABLE CLENCH. ALSO, RENEW WOODEN GRATINGS AS PER REQUIREMENT.
MR 3 - STRIP, INSPECT AND OVERHAUL MANUAL OPERATION MECHANISM PAYING PARTICULAR ATTENTION TO THE TRUNNION NUT AND BEVEL GEARS OF HAND WHEEL UNI, RENEW THE OUTER COVER AND LOCKING MECHANISM. MT - 14110
MR -4 RENEW FERRODO BRAKE LININGS, PINS AND BUSHES AS PER SAMPLE. MATERIAL SPECS OF BRAKE LINING - LENGTH: 1 MTR., WIDTH- 50 MM
MR 5 - DRAIN OIL FROM GEAR BOX, OIL BATH AND REFILL WITH CLEAN OIL OC 300. MT - 14110
MR 6 - EXAMINE THE CAPSTAN/ CABLE HOLDER GEAR AND ITS FITTINGS. CHECK THE OIL SEALS FOR LEAKAGE AND RECTIFY DEFECTS IF ANY. ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE SHIPYARD
(A) DISMANTLE THE CAPSTAN DRUM, CABLE HOLDER AND ITS FITTINGS.
(B) CHECK THE OIL SEALS FOR LEAKAGES, BUSH BEARINGS FOR WEAR AND INCREASED CLEARANCES. RENEW DEFECTIVE COMPONENTS.
(C) CHECK THE EXTENT OF WEAR OF SNUGS OF CABLE HOLDER. RENEW THE CABLE HOLDER IF THE SNUGS ARE FOUND EXCESSIVELY WORN CAUSING SLIPPAGE OF CABLE.
MR 7 - REMOVE GEAR CASES AND EXAMINE SECONDARY & PRIMARY WORM AND WORM WHEEL DRIVE. STRIP AND EXAMINE ALL THRUST AND ROLLER BEARINGS. EXAMINE SLIPPING CLUTCH AND MAGNETIC BRAKES. EXAMINE FLEXIBLE COUPLINGS BETWEEN MOTOR AND CLUTCHES. ADJUST THE SLIPPING CLUTCH AS NECESSARY. RECTIFY THE DEFECTS, RENEW AS REQUIRED. MT - 14110
MR -1 INSPECT THE GEARBOX GEAR BACKLASH FOR ANY EVIDENCE OF EXCESSIVE WEAR OR DEFECT. RECTIFY AS NECESSARY. ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY SHIPYARD
MR 2- INSPECT CONDITION OF DECK PLATING UNDER CAPSTAN FOUNDATION. RENEW FOUNDATION POST SURVEY. PRESERVE IN ACCORDANCE WITH NO 53/16.
MR 3 - DISMANTLE THE CAPSTAN ASSEMBLY AND CARRY OUT COMPLETE OVERHAULING OF THE CAPSTAN AND PROVE FOR SATISFACTORY OPERATION. CARRYOUT LOAD TESTING OF CAPSTAN TO 1.5 TONNES AND ISSUE NECESSARY CERTIFICATE. NOTE - ALL NECESSARY SPARES RENEWED DURING OVERHAULING TO BE CATERED BY SHIPYARD. MT - 14110
MR 4-EXAMINE SLIPPING CLUTCH, MAGNETIC BRAKES AND COUPLINGS BETWEEN MOTOR AND CLUTCHES AFTER DISMANTLING. RENEW AS NECESSARY, REFIT.
MR5- REPLENISH SYSTEM WITH NEW CLEAN OIL OC 300.
MR 1 - 5 TONNE SWL TOWING SLIP TO BE DISMANTLED AND THOROUGLY OVERHAULED. REPLACE, DEFECTIVE COMPONENTS AND REFIT THE TOWING SLIP ON COMPLETION. DR ENTAILS (A) LOAD TESTING OF TOWING SLIP, REPLACE, IF ANY PARTS DECLARED BER OR MAJOR REPAIR CARRIED OUT. NECESSARY CERTIFICATE IS TO BE PROVIDED TO SS.
MR 2 - THE FOLLOWING DECK FITTINGS TO BE VISUALLY SURVEYED AND ULTRASONICALLY GUAGED, STEEL RENEWAL TO BE UNDERTAKEN AS PER SURVEY REPORTS: - (A) TWIN BOLLARDS - 08 NOS
(B) FAIR LEADS- 08 NOS
(C) CLOSED CHOCKS (BULL RINGS)- 02 NOS
(D) CLEATS- 12 NOS
(E) TOWING BOLARD- 01 NO
(F) CABLE CLENCH- 01 NO
(G) TOWING SLIP FOUNDATION BRACKET- 01 NO
(H) ROLLER FAIR LEADS- 02 NOS
(J) DECK EYES BLAKE AND SCREWSLIPS- 02 NOS
(K) DECK EYES OF ANCHOR STROP- 02 NOS
(L) MISCELLANEOUS DECK EYES - 40 NOS
MR1- CARRY OUT SURVEY AND RENEWAL OF FOLLOWING GUARDRAIL AND STANCHION ASSEMBLY: - (A) TULIPS
(B) BOTTLE SCREW SLIPS
(C) D SHACKLES
(D) GUARD RAILS (WIRE ROPE)
(E) LOAD TESTING OF PVC GUARD RAIL WITH 750 KG IAW INBR 1552 RANDOMLY. CERTIFICATE IS TO BE PROVIDED TO SS.
MR 2- REPLACEMENT OF SUPPORTING PIPES OF FIXED GUARDRAIL ON BRIGDE TOP. MAT- AL
MR 3- REPLACEMENT OF STANCHION SHOES WITH SECURING NUTS & BOLTS AND DROP NOSE PIN. MAT- MS, PIN-SS
MR 1 - EXAMINE ALL HATCHES AND CHECK THEIR CLIPS, CLOSING MECHANISM, HINGES FOR LOOSENESS, SPRING MECHANISM, HATCH HOLDING SLIDING MECHANISM/ RETAINING CLIP AND WEDGE PIECES FOR SIGNS OF WEAR AND WORN OUT. CHECK NEOPRENE/ TEFLON WASHERS, TOROIDAL SEALING RINGS, RUBBER SEALINGS AND OTHER STRUCTURAL DAMAGE/ DEFECTS. RENEW ALL WORN OUT PARTS. SPARES TO BECATERED BY THE SHIPYARD.
MR 2- CARRY OUT WATERTIGHT INTEGRITY TEST OF ALL W.T. HATCHES USING ULTRASONIC LEAK DETECTOR (ULD) DEVICE POST RECTIFICATION OF ALL DEFECTS IN THE PRESENCE OF SS/TRIAL AGENCY. DR ENTAILS (A) IF ANY HATCH FAILED WT INTEGRITY TEST NECESSARY REPAIRS IS TO BE DONE AND TEST TO BE PROVED IN PRESENCE OF SS.
MR 3 -RETAINER CLIPS/ SECURING ARRAGEMENT OF WT HATCHES TO BE REPLACED WITH STAINLESS STEEL RETAINER CLIPS AS PER SAMPLE IAW HQSNC LETTER NC/3000/11 DATED 10 MAY 23
MR 4 - SUPPORTING BRACKETS ALONG WHICH RETAINING CATCHES OF HATCHES ARE SECURED TO BE RENEWED IN MAIN DECK HATCHES. MAT: 'I' SECTION (FABRICATED) 10 MM THICK, WEB: 3" WIDE, RIDER: 3" WIDE & LENGTH OF BRACKET: 1 MTR.
MR 1 - SURVEYAND RENEW NWT DOOR STRUCTURE/DOOR FRAME FOR DETERIORATION/DAMAGE. INSPECT DOOR GASKETS, HINGES, ESCAPE PANEL ,LOCKING ARRANGEMENTS, SLIDING WAYS & RUNNERS (IF FITTED) FOR CORRECTNESS. REPAIR/RENEW AS NECESSARY. DR ENTAILS (A) REPLACEMENT OF DOORS FOUND DEFECTIVE,(B) REPLACEMENT OF DOOR FRAME FOUND THINNED AND DEFECTIVE.
MR 1- UNDERTAKE RENEWAL OF FIXED H2S SENSOR ON EXPIRY OF 4 YEARS OF LIFE AS PER PROCEDURES LAID DOWN IN OEM DOCUMENTATION IAW IHQ MOD(N)/ DNA POLICY LETTER NC/ POLICY/ H-113/ EQUIPMENT DATED 16 SEP 16. DR ENTAILS (A) REMOVAL/FITMENT OF FIXED H2S PANEL IN STP LOBBY (B) RENEWAL OF FIXED H2S ALARM PANEL IN STP LOBBY, MCR AND BRIDGE. (C) TUNING OF SENSOR WITH PANEL (C) ALL TRIALS IS TO BE DONE.
MR 2 - UNDERTAKE CALIBRATION OF 02 FIXED AND 03 PORTABLE SENSORS.MT - 147115 CALIBRATION CERTIFICATE IS TO BE PROVIDED TO SS.
MR 1- WEIGH THE RIB AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION.
MR 2 - CARRY OUT LEAK TEST OF FUEL TANK BY LP AIR WITH ASSISTANCE FROM REPAIR YARDS .MT - 17305. DR ENTAILS (A) IF ANY LEAK OBSERVED IN FUEL TANK REPAIR/RENEWAL IS TO BE DONE (B) FUEL TANK IS TO BE PRESSURE TESTED POST REPAIRS
MR 3 - SURVEY OF FOUR POINT LIFTING PLATES FITTED ON DECK (INCLUDING BACKUP PLATES, NUT, BOLTS) AS PER PARA 5 OF APPENDIX B OF NO 03/18.MT - 17305 DR ENTAILS (A) IF ANY OF FOUR LIFTING PLATES FOUND DEFECTIVE NECESSARY REPAIRS IS TO BE DONE.
MR 4 - TEST DISENGAGING GEAR/ BOATS FALLS. MT - 17305
MR 5 - ALL EXTERNAL SURFACE OF BOAT BE COATED WITH GEL COAT PIGMENTED WITH LIGHT GREY SHADE TO RAL 7040 TO PROVIDE SMOOTH FINISH TO THE RIB. MT - 17305
MR 6- ANNUAL SERVICEABILITY CHECKS OF ARH TO BE CARRIED OUT. QTY- 01. SERVICEABILITY CERTIFICATE IS TO BE PROVIDED TO SS.
MR 1 - WEIGHT CONTROL TEAM IS TO BE CONSTITUTED COMPRISING 04 MEMBERS TO RECORD AND MONITOR THE WEIGHT OF ITEMS TAKEN IN AND OUT OF THE SHIP. WEIGHT CHANGES ARE TO BE RECORDED IN THE WEIGHT MANAGEMENT BOOK. A SUITABLE WEIGHING MACHINE WHICH CAN MEASURE WEIGHT RANGING FROM 1 KG TO 250 KGS IS TO BE PROVIDED .TALLY FOR TAG-IN TAG-OUT POLICY TO BE FOLLOWED BY THE WEIGHT CONTROL TEAM .MT - 1010002
MR- 2 PROVIDE NECESSARY INPUT ON WEIGHT OF ITEMS REMOVED/ REPLACED TO THE SHIP STAFF DURING REFIT WITH THE FOLLOWING DETAILS: - (A) WEIGHT OF EQUIPMENT/ COMPONENTS INCLUDING INSTALLATION MATERIAL BEING ADDED/ REMOVED AND ITEMS BEING DEGUTTED/ RE-GUTTED. IN CASE OF NON- AVAILABILITY OF DETAILS OF WEIGHT, ACTUAL WEIGHING OF ITEMS IS TO BE ENSURED. (B) CO-ORDINATES (X, Y, Z) OF CENTRE OF GRAVITY OF ALL WEIGHT ARE TO BE PROVIDED FOR RECORDING IN THE WEIGHT MANAGEMENT BOOK.
MR 3 - CONDUCT INCLINING EXPERIMENT IAW NCD 0104.
MR 1 - DISMANTLE COMPLETE STRUCTURE AND CARRY OUT COMPLETE OVERHAULING OF DAVIT ASSEMBLY AND ITS SUB-COMPONENTS . RENEW WORN OUT PARTS/ DEFECTIVE COMPONENTS. THE WORK INVOLVES THE FOLLOWING: - MT - 14007
MR 2- ASSEMBLIES. OPEN THE BEARING HOUSINGS AND INSPECT BEARINGS FOR PLAY AND WEAR. INSPECT THE SHAFTS, WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES. CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER. CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION
MR 3 OVERHAUL SLEW AND HOIST MOTORS. CHECK WEAR OF ROTOR FRICTION LININGS. MEASURE THE ROTOR THICKNESSES AND COMPARE TO THE MINIMUM PERMISSIBLE LIMITS. IF NECESSARY REPLACE THE ROTOR. MEASURE AND ADJUST THE AIR GAP BETWEEN THE ARMATURE PLATE AND STATOR TO PERMISSIBLE LIMITS. HOIST MOTOR: 1.5 HP,415 V, 50 HZ, 3 PH, 132S FRAME MARINE DUTY MOTOR; SLEW MOTOR:3 HP,415 V, 50 HZ, 3 PH, 100L FRAME MARINE DUTY MOTOR; DEGREE OF PROTECTION: IP56
MR 4 (A)OVERHAUL ELECTROMAGNETIC RELEASE SPRING-APPLIED BRAKE FITTED ON HOIST MOTOR.
(B) INSPECT THE FRICTION LININGS OF THE BRAKE ON HOIST WINCH MOTOR AND RENEW IF WORN OUT
(C) ON COMPLETION OF OVERHAULING, CARRY OUT LOAD TESTING OF THE EQUIPMENT. SWL: 1.2 T, RUNNING LOAD: 1.8 T, STATIC LOAD: 2.4 T
(D) PRE-REFIT AND POST REFIT TRIALS TO BE CARRIED OUT.
(E) AFTER COMPLETION OF LOAD TEST, EXAMINE THE COMPLETE DAVIT STRUCTURE AND ASSOCIATED LIFTING GEARS FOR FLAWS DISTORTION, DEFECAUTION ETC. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES AND CARRY OUT REPAIRS IF NECESSARY AND RETEST. RECORD RESULTS OF TEST AND EXAMINATION
(J) CARRYOUT REPLACEMENT OF ARH VIEW EXPIRY OF SERVICE LIFE (AUTO RELEASE HOOK) AS PER STANDARD SPECIICATIONS. NOTE - ARH TO BE SERVICED AND CERTIFICATION TO BE PROVIDED BY M/S VANSON ENGG PVT LTD (OEM OR NAVY AUTHORISED SUPPLIER OF THE EQUIPMENT)
(K) RENEW THE EXTRA FLEXIBLE STEEL WIRE ROPE (EFSWR) OF BOAT DAVIT FROM END TO END AS PER SAMPLE AFTER VISUAL SURVEY AND THE SAME TO BE RIGGED UP ON BOAT DAVIT. WIRE ROPE DIA: 12 MM. JOB INVOLVES FOLLOWING :-
(I) REMOVAL OF EFSWR FROM THE DAVIT
(II) RENEWAL AND CONNECTION OF THIMBLE AND SPLICING OF THE NEW EFSWR ONTO THE THIMBLE AT STANDING END.
(III) RIGGING UP OF NEW EFSWR ON TO THE DAVIT WITH A SUITABLE SPOOLING MECHANSIM.
(L) CARRY OUT LOAD TESTING OF BOAT DAVIT POST COMPLETION OF ALL WORK.
CARRY OUT COMPLETE OVERHAULING OF BATTERY POWERED SELF PROPELLED LIFEBUOY(BPSPLB). UNDERTAKE SERVICEABILITY CHECKS OF HAND HELD REMOTE CONTROL UNIT. RENEW ALL WORN OUT PARTS. TRIALS TO BE DONE AFTER OVERHAULING OF BPSPLB IN PRESENCE OF SS.
CARRY OUT COMPLETE RENEWAL OF FRESH WATER AND HOT WATER SYSTEMS, PIPING AND VALVES. REFIT AS NECESSARY. TEST SYSTEM ON COMPLETION OF REPAIRS. MAT- 25MM, CU-NI, VALVE -02
OVERHAUL COMPLETE GARBAGE DISPOSAL UNIT(GDU) INCLUDING PUMP AND PULVERISER MOTORS. RENEW ALL GLAND PACKINGS SEALS, PULVERISER CUTTER BLADES, STRAINERS AND ALL WORN OUT PARTS. DR ENTAILS (A) REMOVAL OF GDU (B) FITMENT OF GDU AFTER OVERHAULING (C) TRIALS TO BE DONE AFTER FITMENT OF GDU IN PRESENCE OF SS.
TEST BOAT SLINGS. PERIOD BETWEEN TESTS NOT TO EXCEED 27 MONTHS. DETAILS IN ACCORDANCE WITH NCD 3910. (A) ALL LEGS SLINGS MUST BE MADE OF EXTRA SPECIAL FLEXIBLE STEEL WIRE ROPE AND NOT NYLON ROPE. (B) THE RING BOLT MUST HAVE 2'' INTERNAL DIAMETER BY 3/8'' DIAMETER DIAMETER MATERIAL AND NOT 5/4'' INTERNAL DIAMETER BY 1/2'' DIAMETER.
HULL - PART II
CAPSTAN FOUNDATION AND BASE FOUNDATION OF CONTROL PANEL WITH SECURING ARRANGEMENT THINNED/HOLED TO BE RENEWED.WORK INVOLVES REMOVAL AND REFITMENT OF ELECTRICAL FITTINGS OF THE SAME POST RENEWAL.MAT- MS/AL
ANCHOR CAPSTAN MANUAL OPERATING CONTROL HANDLE THINNED/CORRODED TO BE REPAIRED/RENEWED AS PER SAMPLE.
BEVEL GEAR OF ANCHOR CAPSTAN BRAKE GEAR BOX CORRODED AND DAMAGED TO BE RENEWED.(YARD TO SUPPLY)
CHAIN CABLE SLIPING OFF FROM CAPSATAN SPROCKET DURING PAYING OUT OPERATION. SUSPECTED TEETH OF SPROCKET WORN OUT. TO BE REPAIRED AND TESTED POST REPAIR.
BRAKE LINING OF ANCHOR CAPSTAN WORN OUT DUE TO FAIR , WEAR AND TEAR. TO BE RENEWED.
ANCHOR CHAIN CABLE SEPARATOR OF CAPSTAN SPROCKET BROKEN/CORRODED CAUSING FOULING NEAR CAPSTAN WHILE HEAVING. E&R TO BE CARRIED OUT.
OPERATING WHEEL OF CAPSATN DRUM AND BAND BRAKE CORRODED AND THINNED. TO BE RENEWED.
FOUNDATION, GEAR BOX, SPINDLE AND ASSOCIATED FITTINGS OF BRAKE BAND ASSEMBLY DAMAGED/DEFORMED. TO BE RENEWED AND TESTED.
ENGAGING AND DISENGAGING MECHANISM OF ANCHOR CAPSTAN DRUM JAMMED.SUSPECTED HAND WHEEL SOCKET THREAD DAMAGED TO BE REPAIRED AND RENEWED.
CABLE GUIDER PLATES OF ANCHOR CAPSATN DEFOFRMED/DAMAGED . TO BE REPAIRED/RENEWED.
BASE FOUNDATION WITH CONTROL PANEL WITH SECURING ARRANGEMENT OF MOORING CAPSTAN THINNED/HOLED TO BE RENEWED.WORK INVOLVES REMOVAL AND REFITMENT OF ELECTRICAL FITTINGS OF THE SAME POST RENEWAL.
FOUNDATION OF MOORING CAPSTAN CORRODED AND THINNED. TO BE RENEWED.
BOAT DAVIT HOISTING LIMIT MECHANISM MOUNTING THINNED AND CORRODED TO BE RENEWED.JOB INVOLVES REMOVAL AND REFITMENT OF LIMIT MECHANISM POST RENEWAL.
02 SECURING EYES OF DAVIT LIFE LINE ON DAVIT ARM THINNED AND CORRODED TO BE RENEWED.
BOAT DAVIT GEARBOX INSPECTION COVER THINNED/CORRODED AND RUBBER SEALING PERISHED TO BE RENEWED.
PULLEY BLOCK ASSEMBLY OF BOAT DAVIT CORRODED THINNED AND DEFORMED. TO BE SURVEY AND RENEWED.
ABNROMAL NOISE OBSERVED FROM GEAR BOX DURING SLEW IN OUT OPERATION. DI AND DR TO BE CARRIED OUT .
WORM WHEEL OF BOAT DAVIT CORRODED THINNED AND HOLED. TO BE REPAIRED.
REMOTE CONTROL COVER AND BOX OF BOAT DAVIT CORRODED AND DAMAGED. TO BE REPAIRED.
BASE FOUNDATION OF BOAT DAVIT CORRODED THINNED AND HOLED. TO BE SURVEYED AND RENEWED.
MANUAL OPERATING SHAFT KEY OF HOISTING GEAR OF BOAT DAVIT CORRODED AND BROKEN TO BE RENEWED.
SAFETY PREVENTETR OF RHIB DAVIT CORRODED THINNED AND HOLED. TO BE RENEWED. LOAD TEST OF NEW ONE TO CARRIED PUT IAW INBR 1552
SERVICEABILITY CHECKS OF ARH OF BOAT DAVIT TO BE CARIIED OUT
ICCP ACU CONTROL PANEL COVER AND LOCKING MECHANISM BROKEN TO BE REPAIRED/RENEWED
DEFECT RECTIFICATION TO BE CARRIED OUT AS PER DEFECT OBSERVED IN PRE DOCKING CHECKS
COFFERDAM/JUNCTION BOX OF ANODE/RE CORRODED, THINNED. TO BE RENEWED. MAT- MS
FOUNDATION OF SEWAGE TREATMENT PLANT CORRODED/THINNED. TO BE SURVEYED AND RENEWED.
ABNORMAL NOISE OBSERVED DURING STP AIR VENT BLOWER/AIR EJECTOR MOTOR SUSPECTED BEARING DAMAGED ON BRIDGE TOP TO BE REPAIRED/OVERHAULED.
CALIBRATION OF 02 STP VACCUM GAUGE FOR STP TO BE CARRIED OUT.
CONTROL PANEL OF GREY WATER TANK PUMP BROKEN TO BE REPAIRED AND RENEWED.(MAT-AL)
ISOLATING VALVE WITH PIPELINE OF STP EJECTOR ON BRIDGE TOP CORRODED TO BE RENEWED.
WATER LEAKAGE OBSERVED FROM FIREMAIN VALVE WITH PIPELINE FOR STP TO BE RENEWED.
FREQUENT CHOCKING OF LINES OBSERVED IN STP LINES INSIDE STP COMPARTMENT. SUSPECTED SCALLING OF MUD INSIDE . RA FOR CHEMICAL CLEANING.
UNUSUAL NOISE OBSERVED DURING OPERATION OF STP MACRETOR PUMP SUSPECTED BEARING AND IMPELLER OF THE SAME DAMAGED TO BE REPAIRED.
REPLACEMENT OF 01 STP OBD PUMP TO BE CARRIED OUT IAW IHQ POLICY LETTER NC/3731 DATED 14 AUG 19 . MAKE- M/S DE NORA WATER TECHONOLOGIES. MAKE-STP . DESCRIPTION- OVERBOARD PUMP AND MOTOR ASSY (TEFC) BLADOR IP56.
SUPPLY AND FITMENT OF 14 NO NON STANDARD WT HATCHES TO BE CARRIED OUT VIEW HATCH CORRODED/HOLED/THINNED. JOB INVOLVES MANUFACTURING OF HATCHES BY OEM , FITMENT AND ULD CHECK POST WORK COMPLETION. OEM DETAIL PROVIDED BY SS. DIMENSIONS OF HATCH ARE GIVEN BELOW:- RCS - 800X800 WATER JET - 800X800, AER- 800X800, FER- 800X800, GER - 800X800, AMMO LOCKER - 610X610 , PUMP ROOM - 800X800, J/S MESS ESCAPE HATCH- 800X800
AUTO SPRING RETAINING CATCH OF 14 WT HATCHES.HEAVILY CORRODED AND BROKEN(.) NOT HOLDING HATCH COVER PROPERLY TO BE RENEWED AS PER EXISTING ONE WITH SS SPRING.
ITP OF WT HATCH DAMAGED AND DEFORMED TO BE REPAIRED/RENEWED AS PER SAMPLES.(QTY-09).
SECURING BASE BAR FOR AUTO RETAINING SPRING CATCH OF WT HATCHES THINNED/CORRODED TO BE RENEWED.(QTY-14),MAT-MS
12 DECK EYES OF FIXED SHORING SECURING FOR WT HATCH DAMAGED TO BE REPAIRED/RENEWED.DP TEST TO BE CARRIED OUT POST RENEWAL.
METALIC COAMING OF 05 WT HATCH CORRDED THINNED AND HOLED TO BE REPAIRED.
METALLIC PIECES PROVIDED AT COAMING FOR SECURING OF CLIPS OF WT HATCHES IS CORRODED/THINNED. TO BE RENEWED.
LOCATION MARKING OF HATCH AND ON/OFF MARKING FADED/DAMAGED. TO BE RENEWED.
TOUGHNED GLASS OF 05 WT DOORS -WEAR AND TEAR TO BE RENEWED.
07 WT DOORS FAIILED CHALK TEST .SUSPECTED LEVER ROD GEAR AND DOG DOWN ASSEMBLY DAMAGED AND BROKEN TO BE REPAIRED.
RETAINING HOOK OF 06 WT DOORS HEAVILY CORRODED AND BROKEN(.) TO BE RENEWED.
DOG DOWN MECHANSIM OF 09 WT DOORS NOT WORKING. TO BE RECTIFIED.
RUBBER BEADING OF 11 WT DOOR UPROOTED AND DAMAGED . TO BE RENEWED.
SECURING CLIPS FOR SECURING HANDLE OF WT DOORS ARE CORRODED/THINNED TO BE RENEWED,
RA FOR MANUFACTURE AND FITMENT OF STAINLESS STEEL RETAINER FOR 11 WT DOORS IAW HQSNC POLICY LETTER NC/3000/11 DATED 10 MAY 23.
CLIPS ALONG WITH SECURING METALLIC PAD PIECE OF BRIDGE WT DOORS CORRODED/ THINNED. TO BE REPAIRED/RENEWED.
WIREMESH OF 11 MUSHROOM HEAD THINNED/CORRODED TO BE RENEWED AS PER SAMPLE.
OPENING/CLOSING FLAP MECHANISM INCLUDING OPERATING WHEEL, SPINDLE ETC. CORRODED/THINNED. TO BE RENWED.
BASE AND BODY OF 08 MUSHROOM HEAD HEAVILY CORRODED/THINNED. TO BE REPAIRED.
MUSHROOM HEAD OPENING CLOSING TALLY CORRODED/UPROOTED TO BE RENEWED AS PER SAMPLE.(MAT-SS,QTY-16)
INSPECTION COVER OF MUSHROOM HEAD DAMAGED/CORRODED. TO BE RENEWED WITH SS BUTTERFLY NUT AND BOLT.
02 VENTILATION TRUNKING IN PROVISION STORE THINNED ,CORRODED AND HOLED TO BE REPAIRED/RENEWED.(MAT-AL,GI SHEET)
RUBBER COAMING OF 15 VENTILATION FLAPS ON SUPERSTRUCTURE WORN OUT AND PERISHED TO BE RENEWED.
WIRE MESH OF EXHAUST TRUNKINGS THINNED AND CORRODED AT VARIUOS LOCATIONS.TO BE RENEWED.MAT-AL
06 AHU FILTERS BROKEN AND DAMAGED TO BE RENEWED AS PER SAMPLE.(MAT-DRY TYPE COPPER,WIREMESH
04 GREASE FILTER OF GALLEY EXHAUST THINNED AND CORRODED TO BE RENEWED AS PER SAMPLE.(MAT-SS, WIREMESH)
BASE FOUNDATION PLATE OF AHU1 THINNED/CORRODED AT INDICATED LOCATIONS.SUSPECTED PLATE THICKNESS DECREASED BELOW PERMISSIBLE LIMIT.AREA TO BE SURVEYED AND RENEWED.MAT-MS
COLD LAGGING OF AHU1 AND AHU 2 PERISHED TO BE RENEWED (AREA 15 SQM).
AHU NO1 BLOWER CASING CRACKED AND BROKEN TO BE RENEWED .(MAT- DOUBLE SKIN GI SHEET )
RUBBER BELLOW FOR BLOWER FAN OF AHU1 AND AHU 2 RUPTURED AND DAMAGED. TO BE RENEWED.
AHU NO1 INSPECTION CHAMBER COVER FOR BLOWER AND MOTOR DAMAGED/BROKEN TO BE RENEWED AS PER SAMPLE.MAT-AL ALLOY,GI SHEET
RUBBER BELLOW OF 24 AIR DIFFUSERS WORNOUT/ PERISHED TO BE RENEWED.
AIR DAMPER OPERATING VALVE OF AHU NO1 & 2 JAMMED AND CORRODED TO BE REPAIRED/RENEWED.
AHU NO 2 VENTILATION TRUNKING AND FOUNDATION THINNED AND CORRODED TO BE RENEWED.MAT-MS,AL
FLOW CONTROL CIRCULAR KNOB OF MESS DECK, OFFICERS CABIN AND BRIDGE CORRODED/THINNED, LEADING TO ESCAPE OF AIR. TO BE RENEWED WITH SECURING ARRANGEMENT.
DIFFUSERS OF MCR, BRIDGE, RADIO ROOM, SHIPS OFFICE,GALLEY, DINING HALL , MESS DECKS AND CABINS DAMAGED/DETERIORATED. TO BE RENEWED ALONGWITH RUBBER BELLOWS.
DISTRIBUTION BOX OF ATU 1 CORRODED/HOLED/THINNED, LEADING TO AIR ESCAPE IN STP LOBBY. TO BE RENEWED AS PER EXISTING ONE ALONGWITH RUBBER BELLOWS AND DUCT HOUSING.
WATER LEAKAGE OBSERVED FROM AIR CONTROL VALVES FROM VENTILATION TRUNKING SUSPECTED ELIMINATOR OF AHU1 DAMAGED/BROKEN TO BE REPAIRED / RENEWED.
COLD REPAIR CARRIED OUT AT STBD CATWALK. TO BE CROP AND RENEWED. JOB MAY INVOLVE REGUTTING/DEGUTTING OF MCS 5 CABLES AND COMPONENTS.
BEND (UNDULATION) OBSERVED AT STBD SIDE FOXLE AT FR STN 47. TO BE REPAIRED
TRANSVERSE FRAMES JOINING WEATHER DECK FROM INSIDE OF WJ COMPT, AER,FER, PROVISION STORE, NBCD STORE BUCKLED/DISTORTED. TO BE RENEWED.
BULWARK PLATES WITH STIFFENERS AND SHOES ON BOTH CATWALK AND Q.DECK THINNED/CORRODED AND HOLED AT MULTIPLE LOCATIONS .TO BE CROPPED & RENEWED.
BONDING STRAPS AT VARIOUS LOCATIONS DAMAGED AND UPROOTED TO BE RENEWED.
20 BUTTERFLY NUT OF FAIRLEAD ON UPPERDECK CORRODED TO BE RENEWED.
ANCHOR PLATFORM FULL ASSEMBLY WITH SECURING ARRANGEMEN INCLUDING FOUNDATION THINNED AND CORRODED TO BE RENEWED.MAT-AL
COMPT BELOW TALLIES WITH BASE PLATE AT VARIOUS LOCATIONS DAMAGED AND UPROOTED TO BE RENEWED.MAT-BRASS
SECURING FOUNDATION AND BASE PLATE OF DEEP FREEZER, RANGE AND LOCKER IN GALLEY THINNED AND CORRODED TO BE RENEWED. (MAT-MS)
GREASE NIPPLE OF UPPERDECK FITTINGS VIIZ. BOAT DAVIT, ANCHOR CAPSTAN AND WT DOORS CORRODED TO BE RENEWED AS PER SAMPLE.(MAT-SS,QTY - 150)
FRAME STATION TALLIES WITH WITH SECURING ARRANGEMENT ON PAD PIECE WHICH IS TO BE WELDED ON WEATHER DECK PLATE CORRODED AND UPROOTED TO BE RENEWED AND WELDED IN SITU.(QTY-88,MAT- BRASS)
BUTTERFLY CLIP OF 13 SCUTTLES BROKEN AND THREAD DAMAGED TO BE RENEWED.
TOUGHENED GLASS AND METALLIC BODY OF 13 NO SCUTTELS DAMAGED. TO BE RENEWED/REPAIR.
JACK STAFF AND ENSIGN STAFF WITH SUPPORTING BARS CORRODED/THINNED TO BE RENEWED AS PER SAMPLE.(MAT-AL,QTY-06)
ASHOKA EMBLEM OF SHIP DAMAGED AND APARTED, TO BE RENEWED AS PER SAMPLE. QTY -02
30 ELSA SECURING BRACKET BROKEN AT VARIOUS LOCATIONS IN DAMAGED AND BROKEN TO BE RENEWED.MAT-AL.
WATER LEAKAGE OBSERVED FROM SOFT PATCH IN FER AND AER. SUSPECT PLATE THINNED,RUBBER BEADING PERISHED AND CRACKED. TO BE CROP AND RENEWED.JOB INVOLVES DEGUTTING/REGUTTING OF GRP, MACHINERY,CHOCK OF GEMINI,LADDER,LOCKER ETC. .
STIFFENERS AND SUPPORT PLATES OF SOFTPATCH FOR FER AND AER IN Q.DECK THINNED, CORRODED AND HOLED TO BE REPAIRED/RENEWED.DP TEST AND HOSE TEST TO BE CARRIED OUT POST RENEWAL.
MICROPHONE SECURING BOX THINNED AND CORRODED AT 15 LOCATIONS TO BE RENEWED AS PER SAMPLE.(MAT-AL)
CANVAS COVER FOR DECK FITTINGS AND ELECTRICAL FITTINGS ON UPPER DECK WORN OUT/PERISHED TO BE MANUFACTURED AS PER SAMPLE AND SIZE.(QTY- 80)APPROX AREA 500 SQM
25 ALUMINIUM STANCHION WITH SHOES DEFORMED/CORRODED TO BE REPAIRED/RENEWED (MAT-AL)
11 WOODEN GRATING OF GUNPOST ON UPPER DECK DAMAGED/BROKEN TO BE REPAIRED/RENEWED .(MAT-WOOD)
DRAIN PIPES OF WEATHER DECK AND WET COMPTS AT SCATTERED LOCATIONS HOLED/ THINNED. TO BE RENEWED AS PER EXISTING DIA ALONG WITH SECURING ARRANGEMENT WITH RUBBER SEAL.
15 DRAIN CUP WITH STRAINER CORRODED/HOLED. TO BE RENEWED AND WELDED.
25 DECK DRAIN STRAINER CORRODED/THINNED TO BE RENEWED.MAT-SS
AFFF EXTINGUISHER SECURING BRACKET DAMAGED /CORRODED TO BE RENEWED. (MAT - MS,QTY-15)
HOSE SECURING BASKET AT VARIOUS LOCATIONS DAMAGED/CORRODED TO BE RENEWED (MAT-AL,QTY-12)
SCUPPER LIPS ON PORT & STBD SIDE OF WEATHER DECK DAMAGED/CORRODED TO BE RENEWED AND WELDED IN SITU. (MAT-MS)
SCUPPER LIPS OUTSIDE THE DISCHARGE VALVES OF PUMPS AND DRAIN BROKEN/DAMAGED. TO BE RENEWED/REPAIRED.
01 FISHERMAN PLATE WITH 02 DECK EYE AND SS BUTTERFLY NUTS THINNED AND CORRODED TO BE RENEWED AND EYE TO BE WELDED IN SITU.
SECURING CHAIN LOCK OF 13 SCUTTLES BROKEN/UPROOTED TO BE RENEWED.
SECURING ARRANGEMENT FOR OXYGEN CONCENTRATOR AND OTHER MEDICAL EQUIPMENTS IN SICKBAY DAMAGED/CORRODED TO BE RENEWED.(MAT-AL)
04 NO SLOPE LADDERS AT VARIOUS LOCATION DAMAGED/CORRDED/THINNED. TO BE RENEWED WITH HANDRAIL,ALUMINIUM STRAPS AND SECURING ARRANGEMENTS AS PER EXISTING ONE.
12 NO VERTICAL LADDERS AT VARIOUS LOCATION DAMAGED/DETERIORATED. TO BE RENEWED WITH SECURING ARRANGEMENT AS PER EXISTING ONE.
16 BREATHERS AND BREATHER LINE AT UPPER DECK WITH FLANGE AND INTAKE ASSEMBLY CORRODED/THINNED. TO BE RENEWED AS PER SAMPLE. MAT- MS.
EQUIPMENT TALLIES OF VARIOUS EQUIPMENT AND DECK FITTINGS BROKEN AND UPROOTED TO BE RENEWED.MAT-BRASS
BOAT CHOCK RIB AND GEMINI DAMAGED/DEFORMED.LEATHER COVER AND SHOCK WOOL SHEET DAMAGED TO BE REPAIRED/RENEWED.(MAT-AL,LEATHER,WOOD,MS)
COMPARTMENT TALLIES AT VARIOUS LOCATIONS BROKEN AND UPROOTED TO BE RENEWED.MAT-BRASS
WT RISK MARKINGS (X,Y,Z) AND LOCATION MARKING TALLIES WITH BASE PLATE OF WT DOORS AND HATCHES CORRODED /DAMAGED TO BE RENEWED AS PER SAMPLE.(MAT-SS,QTY-70)
BIMETTALIC JOINTS OF SUPERSTRUCTURE AND BREAKWATER ON WEATHER DECK CORRODED/THINNED AT INDICATED LOCATIONS.AFFECTED AREA TO BE REPAIRED/RENEWED. SUPPLY OF BIMETTALIC JOINT BY SHIPYARD.
SECURING CLAMP FOR DRAIN PIPE LINE ON UPPERDECK THINNED/CORRODED AT 08 LOCATIONS BE RENEWED AND WELDED IN SITU.MAT-AL,MS
BACK COVER OF MESS LADDDER AND BRIDGE LADDER CORRODED. TO BE RENEWED.
UNDULATION OBSERVED ON WEATHER DECK AT INDICATED LOCATIONS.AFFECTED AREA TO BE SURVEYED AND DEFECTIVE PLATE TO BE RENEWED.
GEMINI OBM TANK FOUNDATION ON Q.DECK THINNED/CORRODED TO BE RENEWED.(MAT-MS,AL)
SPURN WATER COAMING OF UPPER DECK CORRODED/THINNED. TO BE REPAIRED/RENEWED.
04 ROPE REEL ON UPPERDECK JAMMED AND FOUNDATION CORRODED.SUSPECTED BEARING GEAR DAMAGED TO BE RENEWED.
TULIPS WITH GUARD RAIL BROKEN AND PVC COATING WORN OUT AT SCATTERED LOCATIONS TO BE RENEWED.
SECURING MOUNTING ARRANGEMENT OF Q.DECK WASH BASIN WITH SS WASH BASIN, SS TAP AND MS DRAIN LINE FADED/THINNED/CORRODED TO BE RENEWED.
05 ALUMINIUM LADDER SHOE BROKEN AND HOLED TO BE REPAIRED AND RENEWED.MAT-AL
CRIMPING OF TULIP WITH GUARD RAILS TO BE CARRIED OUT.
ANCHOR STROP THREAD BROKEN/STRANDS OPENED/THIMBLE EYE CORRODED. TO BE RENEWED AS PER EXISTING ONE.
SECURING BRACKET FOR SPRINKING SYSTEM OF IGLA LOCKER AND LP AIR PIPE LINE ON BRIDGE TOP FOR SHIPS SIREN THINNED AND CORRODED AT 09 LOCATIONS TO BE RENEWED.MAT-AL
24 NWT DOORS CORRODED/THINNED/COAMING UPROOTED/BEND/LOCKING MECHANISM NON OPERATIONAL/KICK OUT PANELS/HYDRAULIC DOOR CLOSER BROKEN TO BE RENEWED.
24 NWT DOORS HYDRAULIC DOOR CLOSER BROKEN AND DAMAGED TO BE REPAIRED/RENEWED.
LOCKING ARRANGEMENT OF 24 NWT DOORS NON OPERATIONAL/DEFORMED. TO BE RENEWED AS PER EXISTING HOUSING IN NWT DOORS.
RA FOR MANUFACTURE AND FITMENT OF STAINLESS STEEL RETAINER FOR 24 NWT DOORS IAW HQSNC POLICY LETTER NC/3000/11 DATED 10 MAY 23.
KICK OUT PANELS OF 10 NWT DOORS WITH SECURING ARRANGENENT DEFORMED/MISALIGNED. TO BE REPAIRED/RENEWED.
DEGUTTING AND REGUTTING OF LAGGING IN AWAY OF HOT WORK AND SURVEY AREA TO BE UNDERTAKEN. REGUTTING OF LAGGING TO BE UNDERTAKEN WITH FAT INSULATION IAW NCD 1430, ISSUE 1. SUPPLY OF LAGGING BY SHIPYARD .
FOUNDATION AND BODY WITH WIRE MESH OF 02 VENTILATION TRUNKING ON PORT AND STBD CATWALK THINNED AND CORRODED TO BE RENEWED.MAT-MS
SECURING FOUNDATION OF WASHING MACHINE/DRYER CORRODED/BROKEN TO BE RENEWED.
BALL BEARING TELESCOPIC SLIDER DRAWER CHANNELOF OFFICE LOCKERS AND OFFICERS CABIN AT VARIOUS LOCATIONS DAMAGED AND BROKEN TO BE REPAIRED/RENEWED.
FOUNDATION OF RU DETONATOR LOCKER AT QUATERDECK CORRODED AND THINNED TO BE RENEWED
06 DOUBLE JACKET LMG ARMOUR PLATE AT FLAG DECK, BRIDGE TOP AND QUARTER DECK DAMAGED ,CORRODED AND PERISHED TO BE RENEWED. MAT-MS
FRESH WATER PIPE LINE SECURING BRACKET AT 18 LOCATIONS ON PORT AND STBD CATWALK THINNED/CORODDEDTO BE RENEWED.MAT-AL,MS
01 LMG RACK BROKEN IN GER COMPARTMENT TO BE REPAIRED.MAT-MS
OVERHAULING OF 08 NO OF OVERBOARD VALVES, SEAL, FLAP AND OPERATING WHEEL TO BE RENEWED.
SHIPS NAME PLATE AT PORT AND STBD SIDE OF BRIDGE WING FADED/BROKEN. TO BE RENEWED AS PER SAMPLE
CORNERS METAL OF 12 NO FAIR LEAD AND 02 BULL RINGS EATEN AWAY LEADING TO CHAFFING OF ROPES, TO BE REPAIRED.
PANAMA PLATE OF 10 FAIRLEAD ON UPPER DECKTHINNED AND CORRODED TO BE RENEWED.NUT TO BE WELDED INSITU
SAFETY LEE RAILS OF BUNKS IN JS & SS MESS BROKEN AND DEFORMED TO BE RENEWED.
METALLIC COAMING/RUBBER BEADING AND SEALING OF 09 BRIDGE GLASS WINDOWS CRACKED AND PERISHED LEADING TO WATER LEAKAGE IN TO BRIDGE.PERISHED TO BE RENEWED.
SIGNAL PISTOL RACK IN GER DAMAGED AND BROKEN TO BE RENEWED.
AMMUNITION RACK IN AMMOLOCKER BROKEN TO BE REPAIRED/ RENEWED. MAT-WOOD,AL,MS
01 SPALSH TARGET ON Q.DECK CORRODED AND BROKEN TO BE REPAIRED.MAT-WOOD,MS
PROCUREMENT AND FITMENT OF BRIDGE RADAR AND LINK II WATCH KEEPING SITTING CHAIR TO BE CARRIED OUT.QTY-2
CHART TABLE WITH SLIDING DRAWERS AT BRIDGE DEFORMED/DAMAGED. TO BE RENEWED AS PER EXISTING DIMENSION.
03 SHIPS DUTY STATE BOARD DAMAGED (.) TO BE REPAIRED/RENEWED AS PER SAMPLE.(MAT-WOOD,SUNMICA)
SILICONE RUBBER BEADING OF 13 SCUTTLES CRACKED AND PERISHED TO BE RENEWED AS PER SAMPLE
30 BUTTERFLY NUT ASSEMBLY FOR VENTILATION FLAP ON UPPER DECK TO BE RENEWED AS PER SAMPLE.(MAT- SS)
SHIP'S QUARTER MASTER TABLE BROKEN/DAMAGED TO BE REPAIRED/RENEWED. (MAT-PLYWOOD AND SUNMICA)
NBCD STATE BOARD OF DCHQ DAMAGED/BROKEN TO BE REPAIRED/RENEWED.(QTY-07,MAT- ACRYLIC SHEET, FLOURASCENT)
VOLUMETRIC MARKING IN U/W COMPARTMENTS FADED TO BE REPAINTED.
ELECTROPLATING OF 01 SHIP'S BELL TO BE CARRIED OUT.
SECURING RACK FOR UPS OF BRIDGE EQUIPMENTS BROKEN TO BE RENEWED AS PER SAMPLE.
CHECKERED BILGE PLATE AND SECUIRNG FRAMES ON WHICH PLATES REST IN FER, AER, WATER JET AND BOSUN STORE COMPARTMENT BROKEN DEFORMED. TO BE RENEWED WITH BOLT AND HINGES. SUPPLY OF MATERIAL IS TO BE DONE BY SHIPYARD . GRADE OF MATERIAL I.S. MAT- AL THICKENSS - 3MM NON SKID
SUPPORTING STIFFNER OF BILGE CORRODED AT SCATTERRED LOCATION TO BE RENEWED .
RENEWAL OF LUGGLESS JOINING SHACKLE PINS AS PER SAMPLE
CAPTAIN REVOLVING CHAIR IN BRIDGE, DAMAGED/UPROOTED BASE. TO BE RENEWED.
CONTROL MECHANISM AND PVC CONTROLLER OF EVAC SYSTEM NOT FUNCTIONING PROPERLY AND AIR LEAKAGE OBSERVED SUSPECTED FLUSH,WATER VALVES DAMAGED TO BE REPAIRED/ RENEWED
SS WC BOWLS OF SS, JS WASHROOM BROKEN. TO BE RENEWED.
COVER OF WC BOWLS OF SAILORS AND OFFICERS WC DAMAGED/UPROOTED . TO BE RENEWED.
PUSH BUTTON OF 5 WC'S BROKEN AND OPERATING SPRING DAMAGED TO BE RENEWED
08 NO HELATH FAUCET OF BATHROOM DAMAGED, TO BE RENEWED.
10 NO PILLAR TAP OF BATHROOMS BROKEN/NON OPERATIONAL TO BE RENEWED.
05 NO HOTAND COLD WATER MIXER ASSEMBLY INCLUDING HAND SHOWER AND MOUNTED SHOWER FEATURE BROKEN. TO BE RENEWED INCLUDING LINES.
05 NO GEYSER OF CO WASH,OFFICERS WASH,SS AND JS WASH NON OPERATIONAL . TO BE RENEWED.
AIR HOSE TEST OF ALL WT COMPARTMENTS TO BE CARRIED OUT IAW NO 01/15 IN PRESENCE OF HITU ,
CARRY OUT PRESSURE TESTING OF TANKS AND ALL SEA TUBES , COFFERDAM, VOID SPACES TO 0.2 KG/cm2
LOAD TESTING OF THE FOLLOWING TO BE CARRIED OUT I.A.W INBR 1552:- (A)ANCHOR CAPSTAN (B) MOORING CAPSTAN (C) ANCHOR STROPS (D) LEADSMEN'S PLATFORM (E) SHIP'S BROW(SMALL & BIG),QTY-02 (F)TOWING PENDENT(FWD & AFT),QTY-02 (G)SAFETY PREVENTOR (H) SNATCH BLOCK (J)TOWING SHACKLE(K)GUARD RAILS WITH SS FITTINGS (L)TWO LEGGED BRIDLE FOR LTT ROPE(M)TOWING BRIDLE ( N) TOWING SLIP- 7.5 t
LOAD TESTING OF THE FOLLOWING TO BE CARRIED OUT I.A.W INBR 1552:-(A) EYES FOR LTT,QTY-04 (B) DECK EYES FOR LTT,QTY-04 (C) STOPPERS DECK EYES,QTY-04 (D) GANGWAY DECK EYES,QTY-12 (E) LIFERAFT DECK EYES,QTY-04(F)DECK EYES FOR MAST&RIGGING,QTY-04(G)DECK RINGS,QTY-12. RENEWAL OF FAILED DECK EYE TO BE CARRIED OUT IN SITU.
VISUAL SURVEY / SERVICEABILITY CHECK OF THE FOLLOWING TO BE CARRIED OUT:- (A) LARNE TARGET ROPE (B) BOLLARDS,QTY -08 (C) FAIR LEADS (QTY-08) (D) ROLLER FAIR LEADS (QTY-05) (E) CABLE CLENCH (QTY-01) (F) STAG HORNS (QTY-08) (G) TOWING BOLLARD(QTY-01) (H) TOWING HOOK(QTY-01)(J)TOWING ROPE(QTY-01)(K)BERTHING HAWSER,QTY-04(L)JUMPING LADDER,QTY-01(M)BLACK SLIP CLENCH(N)BOTTLE SCREW SLIP CLENCH(P)ANCHOR STROP CLENCH
MFMB LAGGING AT VARIOUS LOCATIONS WORN OUT AND PERISHED TO BE RENEWED
SERVICEABILITY OF 01 ARH TO BE CARRIED OUT BY OEM.(M/S VANSION ENGG)
INCLINOMETER ONBOARD SHIP SHOWS ERRACTIC DEFLECTION. SERVICEABILITY CHECKS AND CALIBRATION OF 03 PENDULUM TYPE INCLINOMETER TO BE CARRIED OUT. RENEW IF NECESSARY.
CALIBRATION OF FOLLOWING HUSBANDRY TOOLS TO BE CARRIED OUT. (A) PORTABLE WELDING MACHINE-01 (B) ULTRASONIC LEAK DETECTOR-01 (C) DEMOLITION HAMMER-02 (D) ELECTRIC GRINDER-05 (E) DRILLING MACHINE-02 (F) DECK WASHING MACHINE-02 (G) INCLINOMETER-01
SAFETY INSTRCUTIONS MARKING AT SCATTERED LOCATIONS FADED TO BE PAINTED.
DECK UNDERLAY AND DADOE CASTING OF GALLEY AT SCATTERED LOCATIONS DAMAGED AND BROKEN TO BE RENEWED.POST CUTTING OF PANEL UP TO 230MM.JOB INVOLVES REMOVAL AND REFITMENT OF GALLEY FITTINNGS AND GALLEY RANGE.
DADOE CASTING OF WET COMPARTMENTS DAMAGED AND PEELED OFF. TO BE RENEWED.
DECK UNDERLAY OF WET COMPARTMENTS FADED/CRACKED/BROKEN. TO BE RENEWED.
SUPPLY AND FITMENT OF THREE TIER BUNK WITH PANEL MOUNTED SPOT LIGHT, FANS,BOTTLE & MAGAZINE HOLDER AND CHARGING POINT.Size - 1990 mm X 700 mm X 490 mm. RATING OF SOCKET 15 AMPS, 230 V. EACH BUNK SHOULD BE FITTED WITH RETRACTABLE FALL GUARD ON BOTH THE SIDE TO AVOID FALLING OF PERSONELL WHILE ASLEEP. ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR .
SUPPLY AND FITMENT OF TWO TIER BUNK WITH PANEL MOUNTED SPOT LIGHT, FANS, BOTTLE & MAGAZINE HOLDER AND CHARGING POINT.Size - 1990 mm X 700 mm X 490 mm. THE BUNK SHOULD ACCOMMODATE 04 KIT LOCKER WITH LOCKING MECHANSIM FOR STOWAGE OF PERONAL KIT . RATING OF SOCKET 15 AMPS, 230 V.LOCK SHOULD BE PROVIDED WITH THREE KEYES.EACH BUNK SHOULD BE FITTED WITH RETRACTABLE FALL GUARD ON BOTH THE SIDE TO AVOID FALLING OF PERSONELL WHILE ASLEEP.ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR .
SUPPLY AND FITMENT OF KIT LOCKERS WITH PLUNGER PUSH LOCK WITH TOWER BOLT LOCKING MECHANISM .Size - 500 mm X 900 mm X 540 mm. LOCK SHOULD BE PROVIDED WITH THREE KEYES.ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR . MAT- FR CRCA
SUPPLY AND FITMENT OF WARDROBE WITH HANGING SPACE FOR 36 UNIFORM SUITS WITH SLIDING DOOR.Size - 1200 mm X 950 mm X 550 mm. NO LOCKING MECHANISM REQUIRED.ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR . MAT- FR CRCA
SUPPLY AND FITMENT OF SHOE AND BOOT LOCKER WITH SLIDING PERPEX SHEET DOOR.Size - 1200 mm X 950 mm X 550 mm. NO LOCKING MECHANISM REQUIRED MAT- FR CRCA
SUPPLY AND FITMENT OF 04 BOOK LOCKER WITH SECURING AND LOCKING ARRNAGEMENT AS PER EXISTING DIMENSIONS. MAT- CRCA
ERECTION OF CRCA PARTION PANEL(SANDWICH PANELS) FROM INDICATED LOCATION.
SUPPLY AND FITMENT DRESSING MIRROR OF SS 304 MATERIAL IS TO BE PROVISIONED AND INSTALLED IN A SUITABLE LOCATION.SIZE - 700 MM X 450 MM
WASHING MACHINE,DRYER AND FRIDGE OF MESS LOBBY AND SS MESS DAMAGED, TO BE RENEWED, QTY- O1 EACH
SUPPLY AND FITMENT OF STOWAGE LOCKER WITH LOCKING MECHANSIM.Size - 1680 mm X 900 mm X 260 mm.
SUPPLY AND FITMENT OF 02 NOTICE BOARD WITH VELVET CLOTH IS TO BE PROVIDED. SIZE- 700 X 600 MM MAT- FR
SUPPLY OF MATTRESS WITH COVERS AND CURTAINS WITH V-CHANNEL IS TO BE PROVIDED FOR 08 IN NOS BUNK . THE UPHOLSTERY SHOULD BE OF FIRE RETARDANT GRADE MATERIAL.
RENEWAL OF 02 STOWAGE LOCKER WITH LOCKING MECHANISMIN SHIPS GALLEY =. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 130 mm X 650 mm X 700 mm. EACH LOCKER SHOULD BE PARTIONED INTO TWO PARTS. MAT- FR CRCA
RENEWAL OF 02 RATION LOCKER WITH LOCKING MECHANISM IN SHIPS GALLEY =. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 70 mm X 90 mm X 350 mm. EACH LOCKER SHOULD BE PARTIONED INTO TWO PARTS. MAT-FR CRCA
RENEWAL OF 01 CROCKERY LOCKER WITH LOCKING MECHANISM =. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 600 mm X 800 mm X 250 mm. EACH LOCKER SHOULD BE PARTIONED INTO TWO PARTS. MAT- FR CRCA
RENEWAL OF 01 UTENSIL LOCKER WITH LOCKING MECHANISM =. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 130 mm X 600 mm X 650 mm. EACH LOCKER SHOULD BE PARTIONED INTO TWO PARTS. MAT- FR CRCA
RENEWAL OF WASH BASIN. 02 LOCKER TO BE PROVISIONED BELOW THE BASIN WITH LOCKING ARRANGMENT. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 140 mm X 650 mm X600 mm. MAT- SS
RENEWAL OF WASH BASIN AN TAP ASSEMBLY OF SHIPS GALLEY
REPAIR/RENEWAL OF A REFRIGERATOR IN SHIPS GALLEY FOR KEEPING READY TO USE FRESH RATION. SUPPLY OF MARINE GRADE REFERIGERATOR OF 200L
PROVISIONING OF 02 STOOL IN SHIP'S GALLEY. MAT- SS
RENEWAL OF COMPUTER TABLE IN VARIOUS OFFICES
SUPPLY OF OF 10 OFFICE CHAIR IN VARIOUS OFFICES
RENEWAL OF 01 SOFA CUM CHAIR WITH IN SHIPS DINING HALL .Size - 2470 mm X 650 mm X 800 mm. THE SOFA SHOULD ACCOMMODATE 04 STOWAGE LOCKER WITH LOCKING MECHANSIM MATERIAL OF SOFA SHOULD BE FIRE RETARDENT .
RENEWAL 02 WALL MOUNTED UTENSIL LOCKER WITH LOCKING ARRANGMENT FOR SHIPS DINING HALL. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 760 mm X 900 mm X 280 mm. MAT- FR CRCA
RENEWALOF DINING TABLE ..Size - 2470 mm X 650 mm X 800 mm. ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR . MAT- SS
PROVISIONING OF A COOLER WITH DRAINAGE ARRANGEMENT.
PROVISIONING OF 03 NO METALLIC LOCKER FOR KEEPING DEPARTMENTAL BOOKS. HULL, GUNNERY, MEDICAL MAT- FR CRCA
RENEWAL OF 02 WALL MOUNTED UTENSIL LOCKER WITH LOCKING ARRANGMENT. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 760 mm X 900 mm X 280 mm.
SUPPLY AND FITMENT OF 02 SOFA CUM CHAIR WITH IN WARDROOM .Size - 1670 mm X 650 mm X 800 mm. THE SOFA SHOULD ACCOMMODATE 04 STOWAGE LOCKER WITH LOCKING MECHANSIM . THE SOFA COVER SHOULD BE OF FR GRADE MATERIAL.
RENEWAL 02 NOTICE BOARD WITH VELVET CLOTH IS TO BE PROVIDED. SIZE- 700 X 600 MM MAT- FR
RENEWAL OF 01 COFFEE TABLE IN WARDROOM . MAT- HDMI BOARD
RENEWAL OF CURTAIN WITH SPRING IN 03 NOS SCUTTLES
SUPPLY AND FITMENT OF 01 SOFA CUM BED WITH MATRESS .Size - 1670 mm X 650 mm X 800 mm. THE SOFA SHOULD ACCOMMODATE 01 FOLDABLE BED WITH MATTRESS . THE SOFA COVER AND MATTRESS SHOULD BE OF FR GRADE MATERIAL.
SUPPLY AND FITMENT OF 01 SOFA CUM CHAIR .Size - 1670 mm X 650 mm X 800 mm. THE SOFA SHOULD ACCOMMODATE 04 STOWAGE LOCKER WITH LOCKING MECHANSIM . THE SOFA COVER SHOULD BE OF FR GRADE MATERIAL.
ERECTION AND FITMENT OF SANDWICH PANEL IN CO'S CABIN TO BE CARRIED OUT WITH FR GRADE MATERIAL.
RENEWAL OF 02 OFFICE CHAIR FOR CAPTAIN CABIN
RENEWAL OF 01 DOUBLE DECKER COFFEE TABLE WITH TOGHENED GLASS TOP
RENEWAL OF WORKING TABLE WITH 03 DRAWER FOR STOWAGE OF BOOK AND STATIONERY WITH LOCKING ARRANGMENT. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 1550 mm X 870 mm X 570 mm. ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR .THE TABLE TOP SHOULD BE COVERED WITH REMOVABLE TOGHENED GLASS WITH SUITABLE SECURING ARRANAGEMENT.
RENEWAL OF WARDROBE WITH HANGING SPACE FOR 6 UNIFORM SUITS WITH SLIDING DOOR.Size - 700 mm X 950 mm X 550 mm. LOCKING MECHANISM WITH MINIMUM THREE KEYES IS REQUIRED.ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR .
RENEWAL OF 02 WALL MOUNTED FILE LOCKER WITH TRANSPARENT SLIDING DOOR MECHANISM AND LOCKING ARRANGMENT. LOCK SHOULD BE PROVIDED WITH THREE KEYES.Size - 650 mm X 600 mm X 300 mm. EACH LOCKER SHOULD BE PARTIONED INTO TWO PARTS.
MATTRESS WITH COVER IS TO BE PROVIDED FOR 02 IN NOS BUNK . THE UPHOLSTERY SHOULD BE OF FIRE RETARDANT GRADE MATERIAL.
RENEWAL OF WARDROBE WITH HANGING SPACE FOR 6 UNIFORM SUITS WITH SLIDING DOOR.Size - 700 mm X 950 mm X 550 mm. LOCKING MECHANISM WITH MINIMUM THREE KEYES IS REQUIRED.ERECTION OF FOUNDATION IS TO BE UNDERTAKEN BY WELDING OF ANGLE BAR .
MATTRESS WITH COVERS AND CURTAINS WITH V-CHANNEL IS TO BE PROVIDED FOR 31 IN NOS BUNK . THE UPHOLSTERY SHOULD BE OF FIRE RETARDANT GRADE MATERIAL.
PROVISIONING OF 01 OFFICE TABLE WITH CHAIR IN EO OFFICE
RENEWAL OF WASH BASIN WITH FAUCET AND DRAINING ARRANAGEMENT.
RENEWAL OF CURTAIN ROD ALONG WITH CURTAIN IS TO BE PROVIDED IN THE SHOWER AREA
CABINET MIRROR OF SS 304 MATERIAL IS TO BE PROVISIONED AND INSTALLED OVER THE WASH BASIN.SIZE - 950 MM X 400 MM
SUPPLY AND FITMENT OF 03 TOWEL HOLDER ALONG WITH 10 NOS CLOTH HANGING HOOKS TO BE UNDERTAKEN .
SUPPLY AND FITMENT OF CURTAIN ROD WITH CURTAIN
SUPPLY AND FITMENT OF CLOTH HOOKS
SUPPLY AND FITMENT OF HAND RAIL.
SUPPLY AND FITMENT OF SOAP TRAAY
SUPPLY AND FITMENT OF HAND WASH DISPENSOR.
SUPPLY OF WATER MAT IN CUBICLES AND LOBBY
SUPPLY AND FITMENT OF 01 LED LIGHTS OVER SS 304 MIRROR
SUPPLY AND FITMENT OF SHOWER WITH SHOWER MIXTURE VALVE AND HAND HELD SHOWER TO BE UNDERTAKEN .
SUPPLY AND FITMENT OF INSTANT HOT WATER GEYSER OF 10 L CAPACITY TO BE UNDERTAKEN .
THE FOLLOWING STANDING RIGGING, SEAMANSHIP EQUIPMENT AND LIFTING APPLIANCES ARE TO BE LOAD TESTED I.A.W BR 67 AND INBR 1552 AND AS PER SPECIFICATIONS GIVEN BY SHIP'S STAFF: (A) ANCHOR STROPS
(B) DECK EYES OF BLAKE AND BOTTLE SCREW SLIPS
(C) DECK EYES OF ANCHOR STROPS
(D) LEADSMAN PLATFORM
(E) PREVENTER SAFETY CHAIN HOOK
(F) TOWING PENDANT DIA 24 MM FSWR, 7.5 MTR
(G) BOLLARD STROP 24 MM DIA FSWR 2 MTR
(H) TOWING SHACKLES (STRAIGHT SHACKLE WITH SCREW BOLT)
(J) BOW SHACKLES
(K) SENHOUSE SLIP FOR TOWINNG
(L) SENHOUSE SLIP GENERAL PURPOSE
(M) STRAIGHT SHACKLE
(N) BOW SHACKLE
(O) EYE PLATES OFLLT ON BULKHEAD
(P) DECK EYES FOR LLT
(Q) SHIP'S BROW
(R) AUTO RELEASE HOOK
SURVEY AND RENEWAL OF BI-METTALIC JOINT. MATERIAL IS TO BE SUPPLIED BY THE FIRM
SHIPS DRAUGHT MARKS TO BE BUILD UP/ RENEWED AS PER EXISTING DIMENSIONS AT FWD, MID AND AFT SECTIONS OF SHIP. CONTOUR OF ALL LETTERS AND NUMBERS TO BE WELDED INTERMITTENTLY. ALL FIGURES ARE CONTAINED IN AN 80 MM WIDTH X 100 MM HIGH RECTANGLE. LETTER "M" IS CONTAINED IN AN 90 MM WIDTH X 100 MM HIGH RECTANGLE. HORIZONTAL SEPARATIONS BETWEEN LETTERS AND NUMERALS IS TO BE 20 MM. SS WILL PROVIDE DRAWINGS.
RUBBER BEADING OF 15 IN NOS WT DOORS AND 14 WT HATCHES TO BE RENEWED AS PER STANDARDISED SPECIFICATIONS. MAT: SILICON RUBBER. CARRYOUT CHALK TEST / ULD TEST OF ALL BEADINGS POST RENEWAL.
HYDRO JET BLASTING OF ALUMINIUM DECKS (450 SQMTR) TO BE UNDERTAKEN. CARRY OUT PLATE RENEWAL(ALUMINIUM) AS PER SURVEY REPORT. NECESSARY DEGUTTING/ REGUTTING TO BE CARRIED OUT, IF REQUIRED. PAYMENT BASED ON ACTUAL QUANTITY OF RENEWAL ON NOT EXCEEDING BASIS.
INSPECTION OF ALL 13 SCUTTLES TO BE UNDERTAKEN. REPLACE DEFECTIVE SCUTTLES
HULL - PART III
EXISTING AND PROPOSED AHU MAKE : M/S ZEECO AIRCON PV. ABER APPROVED vide LETTER NC/3000/07 dated 01 Sep 23. EQUIPMENT SUPPLY: AHU 1: NAVY SUPPLY AND AHU 2: FIRM TO SUPPLY DEGUTTING/ REGUTTING OF AIR HANDLING UNITS 1 AND 2 BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-
(A) DEGUTTING/ DISMANTLING OF 02 NOS AIR HANDLING UNITs WITH DISTRIBUTION BOX AND CHILLED WATER LINES. 01 NO IN AHU COMPARTMENT - 22 TR (MAIN AHU NO 1). 01 NO IN FLAG DECK - 5.6TR (GALLEY AHU NO 2)
(B) CUTTING OF TECHNICAL WINDOW AT PORT SIDE FOR IN AND OUT OF ATU 1.
(C)PROVISION AND FITMENT OF 02 MODULAR AHUS WITH CONTROL PANELS. 1. AHU 1 OF CAPACITY 10250-10500 M3/ HR, REFRIGERANT - R 134A, COOLING CAPACITY - 24 OR MORE TR 2. AHU 2 OF CAPACITY 2000-2200 M3/ HR, REFRIGERANT - R 134A, COOLING CAPACITY - 6 OR MORE TR. ADDITIONAL DETAILS WILL BE PROVIDED BY SS.
(D) REMOVAL OF OLD CONTROL PANEL WITH WIRING AT MAIN LOBBY AND STP LOBBY.
(E) RENEWAL OF FOUNDATION AND NEW FOUNDATION BRACKETS OF AHU 1 & AHU 2.
(F) DEGUTTING AND RENEWAL OF LAGGING,BRACKETS AND PAINTING IN ALL AREAS WHEREIN HOT WORK IS CARRIED OUT FOR FITMENT OF AHU 1 & AHU 2
(G) DEGUTTING/REGUTTING OF COLD LAGGING FOR CHILLED WATER LINE AND TRUNKINGS FOR ATU 1 AND 2.
(H) SUPPLY AND FITMENT OF INSTRUCTIONS TALLIES, OPERATING PROCEDURES PLATES( MAT-SS)
(J) A SUITABLE ENCLOSURE FOR WEATHER PROTECTION OF AHU 2 IS TO BE ERECTED WITH ALUMINIUM PLATE OF 3 MM THICKNESS WITH LOCKING MECHANISM.
(K) PROVISIONING OF DRAINAGE ARRANGEMENT/SECURING ARRANGEMENT WITH FINE BRASS WIRE MESH INSIDE THE CASING FOR DRAIN OUT CONDENSED WATER FROM AHU 1 AND 2. MAT- CUNI. DIA- 40MM
(L) REGUTTING/ FITMENT OF BELOW MENTIONED PARTS OF AHUs (AHU NO 1 & AHU NO 2) BE UNDERTAKEN: (I) U – TYPE TRAP - 01 EACH OF AHUs 1 & 2
(II) DRAIN TRAY - 01 EACH OF AHUs 1 & 2
(III) BASE FRAME - 01 EACH OF AHUs 1 & 2
(IV) CENTRIFUGAL FAN UNIT - 01 EACH OF AHUs 1 & 2
(V) FLEXIBLE CONNECTION - 01 EACH OF AHUs 1 & 2
(VI) CONNECTION PIECE - 01 EACH OF AHUs 1 & 2
(VII) COOLING COIL - 01 EACH OF AHUs 1 & 2
(VIII) MIXING SECTION - 01 EACH OF AHUs 1 & 2
(IX) RETURN AIR DAMPER - 01 EACH OF AHUs 1 & 2
(X) FRESH AIR DAMPER - 01 EACH OF AHUs 1 & 2
(M)SECURING OF CABLES WITH SUITABLE CABLE TREY AND CLAMS FOR ENTIRE SYSTEM
(N)POST COMPLETIONS OF FITMENT BOTH THE AHU ARE TO BE PROVEN FOR SATISFACTORY OPERATION.
(P)CARRY OUT AIR FLOW TEST OF BOTH THE AHU AS PER DESIGN SPECIFICATION IN PRESENCE OF SS AND TRIAL TEAM AS PART OF POST REFIT TRIAL. PROVIDE REPORT OF THE SAME
MAKE : DECK MACHINERY DEPARTMENT, GRSE ABER APPROVED vide LETTER NC/3000/07 dated 18 Apr 23. EQUIPMENT SUPPLY: IN DISMANTLE COMPLETE STRUCTURE ALONG WITH ALL CABLES AND WIRE ROPE
SURVEY OF EXISTING FOUNDATION, SURROUNDING DECK INCLUDING SUPPORTING BRACKETS AND DECK CABLE GLANDS BY REFITTING AUTHORITY. RENEWAL TO BE UNDERTAKEN AS PER SURVEY REPORT
INSTALLATION OF COMPLETE BOAT DAVIT ALONG WITH CONTROL PANEL AND CABLING, FITMENT OF EFSWR AND INSTALLTION OF ARH ON BOARD .
CABLE GLAND PACKING FOLLOWED BY AIR HOSE TEST AND SECURING OF CABLES WITH SUITABLE CABLE TREYS
JOINT SYSTEM TRIAL (HATS & SATS) BY OEM, YARD ,SS IN PRESENCE OF ADMIN AUTHORITY I.A.W IHQ APPROVED TRIAL PROTOCOL
DEGUTTING AND RENEWAL OF LAGGING AND PAINTING IN ALL AREAS WHEREIN HOT WORK IS CARRIED OUT FOR FITMENT OF SINGLE ARM BOAT DAVIT
MANUFACTURING AND FITMENT OF METALIC COVER BOX OF HOISTING & SLEWING MOTOR AND CONTROL PANEL . DIMENSION AS PROVIDED BY SS.
SECURING OF CABLES WITH SUITABLE CABLE TREY AND CLAMS FOR ENTIRE SYSTEM
PROVISIONING OF METALLIC COVER FOR COVERING OF MOTOR
PROVISIONING OF BRASS TALLIES, CONTENT PROVIDED BY SHIP
EXISTING SYSTEM MAKE : M/S CCPL PROPOSED SYSTEM MAKE- M/S VANSION ENGINEERING ABER APPROVED vide LETTER NC/3000/07 dated 30 Jan 24. EQUIPMENT SUPPLY: YARD TO SUPPLY DEGUTTING OF EXISTING ICCP SYSTEM INCLUDING ALL RE , ANODE, ACU , COFFERDAM,CABLES DIE ELECTRIC SHIELD AND ACCESSORIES.DEGUTTING TO BE UNDERTAKEN ONLY IN DRY DOCKING PERIOD OF THE SHIP
PROVISION OF DIVER REPLACEABLE ICCP SYSTEM WITH 02 RES, 02 ANODES, 01 ACU, COFFERDAMS AND ASSOCIATED INSTRUMENATION AND CABLING AND DIELECTRIC SHIELD. DETAILED TECH SPECIFICATION WILL BE PROVIDED BY SHIP.
FITMENT OF NEW GEN ICCP SYSTEM WITH DRIVER REPLASABLE ANODES AND RE INCLUDING ALL RE, ANODE, ACU, COFFERDAM, CABLES DIE ELECTRIC SHIELD AND CABLES ACCESSORIES
AIR HOSE TEST OF ALL CABLE GLANDS POST CABLE PACKING
HOSE TEST OF ANODE & RE IN DRY DOCK FOR PROVING WT INTEGRITY
SECURING OF CABLES WITH SUITABLE CABLE TRAY
DEGUTTING AND RENEWAL OF LAGGING AND PAINTING IN ALL AREAS WHEREIN HOT WORK IS CARRIED OUT FOR FITMENT OF NEW ICCP SYSTEM.
SECURING OF CABLES WITH SUITABLE CABLE TREY AND CLAMS FOR ENTIRE SYSTEM
POST COMPLETION OF FITMENT PROVE THE SYSTEM FOR SATISFACTORY OPERATION IN PRESENT OF REFITTING AGENCY, TRIAL UNIT AND SS
ALL ICCP COFFERDAMS HAVE TO FILLED WITH HYDROPHOBIC COMPOUND
AIR PRESSURE TEST FOR COFFERDAM TO BE UNDERTAKEN TO AVOID WATER INGRESS.
EXISTING AND PROPOSED SYSTEM MAKE : M/S INDIAN CHAIN PVT LTD ABER APPROVED vide LETTER NC/3000/07 dated 01 Sep 23 EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING ANCHOR CAPSTAN ALONG WITH ALL ACCESSORIES VIZ. CABLE HOLDER, WARDPING DRUM, GEARBOX, MOTOR, CONTROL PANEL AND CABLES.
FITMENT OF NEW ANCHOR CAPSTAN ALONG WITH ALL ACCESSORIES WITH CABLING.
PACKING OF CABLE GLAND FOLLOWED BY AIR HOSE TEST OF CABLE GLAND TO MAINTAIN WT INGRITY.
DEGUTTING AND RENEWAL OF LAGGING AND PAINTING IN ALL AREAS WHEREIN HOT WORK IS CARRIED OUT FOR FITMENT OF ANCHOR CAPSTAN
SECURING OF CABLES WITH SUITABLE CABLE TREY AND CLAMS FOR ENTIRE SYSTEM
MANUFACTURING AND FITMENT OF METALIC COVER OF CONTROL PANEL . DIMENSION AS PROVIDED BY SS.
POST COMPLETION OF FITMENT PROVE THE SYSTEM FOR SATISFACTORY OPERATION IN PRESENT OF REFITTING AGENCY, TRIAL UNIT AND SS
PROVISIONING OF BRASS TALLIES, CONTENT PROVIDED BY SS.
EXISTING AND PROPOSED SYSTEM MAKE : M/S INDIAN CHAIN PVT LTD ABER APPROVED vide LETTER NC/3000/07(i) dated 01 Sep 23 EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING MOORING CAPSTAN ALONG WITH ALL ACCESSORIES AND CABLES
FITMENT OF NEW MOORING CAPSTAN ALONG WITH ALL ACCESSORIES AND CABLE
PACKING OF CABLE GLAND FOLLOWED BY AIR HOSE TEST OF CABLE GLAND
DEGUTTING AND RENEWAL OF LAGGING AND PAINTING IN ALL AREAS WHEREIN HOT WORK IS CARRIED OUT FOR FITMENT OF MOORING CAPSTAN
SECURING OF CABLES WITH SUITABLE CABLE TREY AND CLAMS FOR ENTIRE SYSTEM
MANUFACTURING AND FITMENT OF METALIC COVER OF CONTROL PANEL . DIMENSION AS PROVIDED BY SS.
POST COMPLETION OF FITMENT PROVE THE SYSTEM FOR SATISFACTORY OPERATION IN PRESENT OF REFITTING AGENCY, TRIAL UNIT AND SS.
PROVISIONING OF BRASS TALLIES, CONTENT TO BE PROVIDED BY SS.
PTS APPROVAL TAKEN VIDE LETTER 438/06/PTS/04 dated 31 May 23. DEMAND PLACED VIDE DEMAND NO - 24E0108(WITH PORT HOLE) AND 24E0107(WITHOUT PORTHOLE). EQUIPMENT SUPPLY: IN FITMENT OF 05 IN NO WT DOORS AT UPPERDECK, JOB MAY INVOLVES CUTTING OF COAMING,FITTING OF NEW DOORS AND FINAL WELDING OF THE COAMING OVER THE WT DOORS.
BPs APPROVED VIDE HQSNC LETTER NC/3000/17 DATED 19 JUN 24 FITMENT OF NEW LADDERS AS PER APPROVED BPs. JOB INVOLVE FOLLOWING (i) DEGUTTING OF EXISTING LADDERS (ii) SUPPLY/MANUFACTURING OF NEW LADDERS (VERTICAL - 13, INCLINED-4, RUNG-1) (iii) FITMENT OF NEW LADDERS (iv) DEGUTTING/REGUTIING OF LAGGING ,PAINTING,PANELLING,TRUNKING AND PIPE LINE (v) DP TEST OF WELD SEAM (vi) TEST & TRIALS OF NEW LADDERS.
FITMENT AND REORIENTATION OF GALLEY RANGE AND ALL ASSOCIATED EQUIPMENTS AS PER APPROVED BOARD PROCEEDINGS.
MINOR As & As FOR MODIFICATION ON BOAT DAVIT AS PER APPROVED BPs. SCOPE OF WORK ENTAILS: - (A) REDUCTION OF SEPARATION BETWEEN SAFETY GUARD SWR PULLEY FROM EXISTING 40 MM TO 10 MM. (B) TWO ADDITIONAL SAFETY BRACKETS ARE TO BE FITTED AROUND PULLEY WITH 10 MM SEPARATION. (C) REPOSITIONING OF CONTROL PANEL ONTO THE GUARD RAIL AT FLAG DECK. (D) INSTALLATION OF SAFETY BRACKET OF MS MATERIAL ON EITHER SIDE (PORT AND STBD) OF DAVIT ARMS.
(A) CHECK TRAINING AND ELEVATION LIMITS OF ALL 07 SMALL ARMS POSTS ONBOARD AND CONFIRM COMPLIANCE WITH APPROVED BPs. (B) ADJUST TRAINING LIMITS AS PER REQUIREMENT. (C) MANUFACTURE/ ALTER ELEVATION LIMITS AS REQUIRED. (D) POST ALTERNATIONS, POSTS TO BE CHECKED FOR FREE MOVEMENT WITH SAs. (E) MANUFACTURE GRATINGS WITH COMPLETE COVERAGE AROUND THE SMALL ARMS POST FOR FIRER TO STAND AND ALLOW COMPLETE MOVEMENT.
A's & A's FOR RELOCATION OF MOSUM POST IAW APPROVED BPs. SCOPE OF WORK INVOLVES: - (A) REMOVE EXISTING MOSUM POST FROM BRIDGE TOP. (B) MANUFACTURE "REMOVE AND FIT" ARRANGEMENT FOR MOSUM WITH ADJUSTABLE TRAINING AND ELEVATION MECHANSIM. (DESIGN AS PER APPROVED BPs) (C) INSTALL NEW MOSUM POSTS AT BOTH CORNERS OF BRIDGE WINGS.
ENGINEERING - PART I
CARRY OUT MR ROUTINES ON STBD, PORT AND CENTRE MAIN ENGINE INTAKE AND EXHAUST SYSTEM AS PER MAINTOPS NO. MT233000 AS FOLLOWS: - SR3 - SURVEY AND RENEWAL OF UNDERWATER EXHAUST PIPES WELDED TO THE HULL (WHERE APPLICABLE). DIA 400 MM DR ENTAILS (I) SURVEY TO BE CARRIED OUT OF UNDERWATER EXHAUST PIPES WELDED TO HULL (II) IF FOUND UNSAT RENEWAL OF UNDERWATER EXHAUST PEPES TO BE UNDERTAKEN
SR4 - CHECK NON METALLIC PART, PIPES, MUFFLER AND EXHAUST LINES FOR CRACKS AND DISTORTIONS DR ENTAILS (I) CHECKS FOR CRACKS AND DISTORTIONS ON NON METALLIC PART OF EXHAUST SYSTEM (II) IF ANY CRACK AND DISTORTIONS FOUND REPLACEMENT TO BE CARRIED OUT WITH NEW ONE
SR5 - RENEWAL OF 100% LAGGING. DR ENTAILS (I) REMOVAL OF OUTER STEEL COVERING AND OLD LAGGING MATERIAL (II) NEW LAGGING TO BE CARRIED OUT AND LAGGING TO BE SECURED BY WIRE (III) OUTER STEEL COVER TO BE REPLACED WITH NEW ONE .
SR6 - CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY DR ENTAILS (I) CARRY OUT ALIGNMENT CHECKS OF COMPENSATOR (II) IF ALIGNMENT FOUND UNSAT RE ALIGNMENT TO BE CARRIED OUT .
SR9 - CHECK/GREASE ALL SUPPORT HANGERS. DR ENTAILS (I) CHECK CONDITIONS OF ALL SUPPORT HANGERS OF EXHAUST SYSTEM (II) GREASING TO BE DONE ON ALL SUPPORT HANGERS (III) IF SUPPORT HANGERS RUSTED AND CORRODED REPLACEMENT TO BE CARRIED OUT
SR12 - INSPECT FOR CONDITION AND OVERHAUL COCKS/FITTINGS FOR MEASUREMENT OF AIR INTAKE DEPRESSION AND EXHAUST BACK PRESSURE MEASUREMENT IN EXHAUST TRUNKINGS AT APPROPRIATE LOCATIONS.DR ENTAILS (I) REMOVAL OF COCKS AND VALVE OF EXHAUST SYSTEM (II) OVERHAULING TO BE CARRIED OUT OF ALL EXHAUST SYATEM (III) WORN OUT SPARES TO BE REPLACED (IV) FITMENT TO BE DONE AFTER REPAIR
SR13 - APPLICATION AND RESTORATION OF RECOMMANDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM. (PAINT TO BE SUPPLIED BY SHIPYARD) DR ENTAILS (I) SCRAPING OF OLD PAINT (II) APPLICATION OF PRIMER IS TO BE DONE (III) APPLICATION OF NEW PAINT AS PER PAINT SCHEME OF ALL COMPONENT OF THE AIR INTAKE SYSTEM.
NR1 - CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST OF EXHAUST SYATEM . RENEW DAMAGED/ DEFECTIVE PART.DR ENTAILS (I) CHEMICAL CLEANING OF EXHAUST SYSTEM TO BE CARRIED OUT (II) PRESSURE TESTING OF EXHAUST SYSTEM TO BE CARRIED OUT (III) IF DAMAGED AND DEFECTIVE DURING PRESSURE TESTING RENEWAL TO BE CARRIED OUT
NR2 - RENEW CORROSION PROTECTORS. DR ENTAILS (I) REMOVAL OF OLD CORROSION PROTECTORS (II) RENEWAL OF CORROSION PROTECTORS AS PER SAMPLE .
NR3 - REMOVE EXHAUST GAS COMPENSATOR, SEPARATOR. REMOVE ALL CARBON DEPOSITS FROM THE COMPENSATOR AND CLEAN IT. DR ENTAILS (I) REMOVAL OF EXHAUST GAS COMPENSTOR AND SEPARATOR (II) CLEANING OF ALL CARBON DEPOSITS FROM COMPENSTOR AND SEPARATOR (III) FITMENT TO BE CARRIED OUT AFTER CLAENING
NR5 - DISMANTLE/ INSPECT ALL COMPONENTS OF THE MAIN ENGINE AIR INTAKE TURNKING FROM CATCHMENT POT TO TC INLET RUBBER BELLOW. INPECT AND CLEAN ALL COMPONENTS OF THE AIR INDUCTION SYSETM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
NR6 - SURVEY AIR INDUCTION AND EXHAUST SYSTEM INCLUDING SILENCERS, COMPENSATOR. RENEW 50% PIPELINES. DR ENTAILS (I) CARRY OUT SURVEY AIR INDUCTION AND EXHAUST SYSTEM (II) IF FOUND UNSAT RENEWAL TO BE CARRIED OUT
NR7 - REPALCE COMPENSATORS/ VALVES/ NRVS AND EXHAUST DOUBLE JACKETS IN THE SYSTEM.DR ENTAILS (I) REMOVAL OF COMPENSATORS /VALVES/NRVS AND EXHAUST DOUBLE JACKET (II) REPLACEMENT TO BE CARRIED OUT AS PER SAMPLE
MR1 - RENEW COMPLETE EXHAUST DOUBLE JACKET PIPE. DR ENTAILS (I) REMOVAL OF ALL EXHAUST DOUBLE JACKET PIPE OF MAIN ENGINE EXHAUST SYSTEM (II) RENEWAL OF THE SAME
MR2 - REMOVE AND CLEAN. SURVEY EXHAUST SYSTEM PIPELINES, RENEW 75% PIPELINES. (450 MM) DR ENTAILS (I) REMOVAL OF EXHAUST PIPELINE (II) CLEANING OF EXHAUST PIPELINE (III) SURVEY TO BE DONE OF EXHAUST PIPELINE (IV) IF FOUND RUSTED AND THINNED SAME TO BE RENEW AS PER SAMPLE AND FITMENT TO BE CARRIED OUT
CARRY OUT MR ROUTINES ON DA INTAKE AND EXHAUST SYSTEM AS PER MT 233000 AS FOLLOWS: SR1 - INTERNALLY CLEAN 25% OF EXHAUST SILENCER/ FITTINGS. DR ENTAILS (I) CARRY OUT INTERNAL; CLEANING OF EXHAUST SILENCER/ FITTING. (II) POST CLEANING, NECESSARY COATING TO BE DONE.
SR3 - SURVEY AND RENEWAL OF UNDERWATER EXHAUST PIPES WELDED TO THE HULL (WHERE APPLICABLE). DIA 100 MM MAT - DR ENTAILS (I) SURVEY TO BE CARRIED OUT OF UNDERWATER EXHAUST PIPES WELDED TO HULL (II) IF FOUND UNSAT RENEWAL OF UNDERWATER EXHAUST PIPES
SR4 - CHECK NON METALLIC PART, PIPES, MUFFLER AND EXHAUST LINES FOR CRACKS AND DISTORTIONS. DR ENTAILS (I) CHECKS FOR CRACKS AND DISTORTIONS ON NON METALLIC PART OF EXHAUST SYSTEM (II) IF ANY CRACK AND DISTORTIONS FOUND REPLACEMENT TO BE CARRIED OUT WITH NEW ONE
SR5 - RENEWAL OF 100% LAGGING. DR ENTAILS (I) REMOVAL OF OUTER STEEL COVERING AND OLD LAGGING MATERIAL (II) NEW LAGGING TO BE CARRIED OUT AND LAGGING TO BE SECURED BY WIRE (III) OUTER STEEL COVER TO BE REPLACED WITH NEW ONE.
SR6 - CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY DR ENTAILS (I) CARRY OUT ALIGNMENT CHECKS OF COMPENSATOR (II) IF ALIGNMENT FOUND UNSAT RE ALIGNMENT TO BE CARRIED OUT.
SR9 - CHECK/GREASE ALL SUPPORT HANGERS. DR ENTAILS (I) CHECK CONDITIONS OF ALL SUPPORT HANGERS OF EXHAUST SYSTEM (II) GREASING TO BE DONE ON ALL SUPPORT HANGERS (III) IF SUPPORT HANGERS RUSTED AND CORRODED REPLACEMENT TO BE CARRIED OUT
SR12 - INSPECT FOR CONDITION AND OVERHAUL COCKS/FITTINGS FOR MEASUREMENT OF AIR INTAKE DEPRESSION AND EXHAUST BACK PRESSURE MEASUREMENT IN EXHAUST TRUNKINGS AT APPROPRIATE LOCATIONS.DR ENTAILS (I) REMOVAL OF COCKS AND VALVE OF EXHAUST SYSTEM (II) OVERHAULING TO BE CARRIED OUT OF ALL EXHAUST SYATEM (III) WORN OUT SPARES TO BE REPLACED (IV) FITMENT TO BE DONE AFTER REPAIR
SR13 - APPLICATION AND RESTORATION OF RECOMMANDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM. (PAINT TO BE SUPPLIED BY SHIPYARD) DR ENTAILS (I) SCRAPING OF OLD PAINT (II) APPLICATION OF PRIMER IS TO BE DONE (III) APPLICATION OF NEW PAINT AS PER PAINT SCHEME OF ALL COMPONENT OF THE AIR INTAKE SYSTEM.
NR1 - CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST OF EXHAUST SYSTEM . RENEW DAMAGED/ DEFECTIVE PART. DR ENTAILS (I) CHEMICAL CLEANING OF EXHAUST SYSTEM TO BE CARRIED OUT (II) PRESSURE TESTING OF EXHAUST SYSTEM TO BE CARRIED OUT (III) IF DAMAGED AND DEFECTIVE DURING PRESSURE TESTING RENEWAL TO BE CARRIED OUT
NR2 - RENEW CORROSION PROTECTORS. DR ENTAILS (I) REMOVAL OF OLD CORROSION PROTECTORS (II) RENEWAL OF CORROSION PROTECTORS AS PER SAMPLE .
NR3 - REMOVE EXHAUST GAS COMPENSATOR, SEPARATOR. REMOVE ALL CARBON DEPOSITS FROM THE COMPENSATOR AND CLEAN IT. DR ENTAILS (I) REMOVAL OF EXHAUST GAS COMPENSTOR AND SEPARATOR (II) CLEANING OF ALL CARBON DEPOSITS FROM COMPENSTOR AND SEPARATOR (III) FITMENT TO BE CARRIED OUT AFTER CLEANING
NR5 - DISMANTLE/ INSPECT ALL COMPONENTS OF THE MAIN ENGINE AIR INTAKE TURNKING FROM CATCHMENT POT TO TC INLET RUBBER BELLOW. INPECT AND CLEAN ALL COMPONENTS OF THE AIR INDUCTION SYSETM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
NR6 - SURVEY AIR INDUCTION AND EXHAUST SYSTEM INCLUDING SILENCERS, COMPENSATOR. RENEW 50% PIPELINES. DR ENTAILS (I) CARRY OUT SURVEY AIR INDUCTION AND EXHAUST SYSTEM (II) IF FOUND UNSAT RENEWAL TO BE CARRIED OUT
NR7 - REPLACE COMPENSATORS/ VALVES/ NRVS AND EXHAUST DOUBLE JACKETS IN THE SYSTEM.DR ENTAILS (I) REMOVAL OF COMPENSATORS /VALVES/NRVS AND EXHAUST DOUBLE JACKET (II) REPLACEMENT TO BE CARRIED OUT AS PER SAMPLE
MR1 - RENEW COMPLETE EXHAUST DOUBLE JACKET PIPE. DR ENTAILS (I) REMOVAL OF ALL EXHAUST DOUBLE JACKET PIPE OF MAIN ENGINE EXHAUST SYSTEM (II) RENEWAL OF THE SAME
MR2 - REMOVE AND CLEAN. SURVEY EXHAUST SYSTEM PIPELINES, RENEW 75% PIPELINES. (250 MM) DR ENTAILS (I) REMOVAL OF EXHAUST PIPELINE (II) CLEANING OF EXHAUST PIPELINE (III) SURVEY TO BE DONE OF EXHAUST PIPELINE (IV) IF FOUND RUSTED AND THINNED SAME TO BE RENEW AS PER SAMPLE AND FITMENT TO BE CARRIED OUT
CARRY OUT MR ROUTINES OF AC SEA WATER SYSTEM AS PER MT 440012: - SR1 - EXAMINE SEAWATER SIDE OF CONDENSER. IF REQUIRED, CHEMICALLY CLEAN SEAWATER SIDE OF CONDENSER AND PRESSURE TEST THEREAFTER TO 1.5 TIMES ITS WORKING PRESSURE. WORKING PRESSURE 4 BAR. DR ENTAILS (I) CARRY POT VISUAL INSPECTION OF SEA WATER SIDE OF CONDENSOR. (II) CARRY OUT MECHANICAL CLEANING. (III) CARRY OUT CHEMICAL CLEANING OF CONDENSOR. (IV) POST CLEANING, PRESSURE TEST TO BE DONE (1.5 TIMES ITS WORKING PRESSURE. WORKING PRESSURE 4 BAR) (V) END COVER GASKETS & ZINC PLUGS TO BE REPLACED.
SR2 - OVERHAULING DEFECTIVE STOP VALVES, DOUBLE SEATED VALVES AND PRESSURE GAUGE VALVES ON THE GAS SYSTEM. RENEW TEFLON SEATS OF VALVES, IF REQUIRED. DR ENTAILS (I) REMOVAL OF STOP VALVES, DOUBLE SEATED VALVES AND PRESSURE GAUGE VALVES ON THE GAS SYSTEM. (II) EXAMINE DEFECTIVE VALVES. (III) RENEWAL OF WORN OUT SPARES & TEFLON SEATS TO BE CARRIED OUT. (IV) POST REPAIR, FITMENT OF VALVES TO BE UNDERTAKEN.
SR3 - CHECK AC SEA WATER PUMP PERFORMANCE. OVERHAUL IF REQUIRED. DR ENTAILS (I) CARRY OUT PERFORMANCE CHECKS OF AC SEA WATER PUMP. (II) RECORD SUCTION & DISHARGE PRESSURE. (III) REMOVAL OF AC SEA WATER PUMP. (IV) DISMANTLE THE PUMP. (V) WORN OUT & MANDATOY SPARES TO BE REPLACED WITH NEW ONE. (VI) OVERHAULING TO BE CARRIED OUT. (VII) POST OVERHAULING, FITMENT & TRIAL TO BE UNDERTAKEN. (VIII) ALL PARAMETERS TO BE RECORDED.
MR1- CHEMICALLY CLEAN ALL REFRIGERANT PIPEWORK INCLUDING OIL COOLER AND OIL SEPARATOR. PRESSURE TEST TO 1.5 TIMES THE WORKING PRESSURE.(WORKING PRESSURE 12 BAR). DR ENTAILS (I) REMOVAL OF ALL REFRIGERANT PIPEWORK INCLUDING OIL COOLER AND OIL SEPARATOR FROM THE SYSTEM. (II) CHEMICAL CLEANING TO BE DONE. (III) PRESSURE TESTING OF SAME PIPES TO BE UNDERTAKEN [1.5 TIMES THE WORKING PRESSURE.(WORKING PRESSURE 12 BAR)]. (IV) DURING PRESSURE TEST, IF ANY SIGN OF LEAKAGE/ DAMAGE TO BE MANUFACTURED AS PER THE SAMPLE. (V) POST CLEANING & PRESSURE TESTING PIPES TO BE FITTED AS PER PREVIOUS ARRANGEMENT.
MR2 - CHEMICALLY CLEAN FOLLOWING:- (A) CONDENSER ON GAS SIDE (B) WATER CHILLER ON GAS SIDE. PRESSURE TEST GAS SIDE TO 1.5 TIMES OF WORKING PRESSURE. ON COMPLETION THOROUGHLY DRY OUT AND BLANK OFF ALL GAS CONNECTIONS TILL RE-INSTALLATION OF THE COMPRESSOR
CARRY OUT MR ROUTINES ON DIESEL ENGINE OF DD AIR COMPRESSOR AS PER MT 46438 AS FOLLOWS: - SR1 - CLEAN AND CALIBRATE FUEL INJECTORS.
MR2 - REMOVE CYLINDER HEAD AND CARRY OUR DE- CARBONISING. EXAMINE CYLINDER LINER FOR SCORING MARKS.
MR3 - EXAMINE CONDITION OF INLET AND EXHAUST VALVES, SPRING, PUSH RODS AND ROCKER ARMS. RENEW IF NECESSARY.
MR4 - GRIND ALL VALVES.
MR5 - RENEW S.V. MOUNTINGS
(A) DISCONNECT, REMOVE, DISMANTLE ENGINE AND CARRY OUT COMPLETE OVERHAULING OF ENGINE. GAUGE ALL PARTS. RENEW DEFECTIVE PARTS. (B) REFITMENT OF ENGINE POST OVERHAULING. (C) REPLACE COMPRESSOR AND ENGINE COUPLING GUARD. (D) TRIALS/ STW AND PROVING OF THE SYSTEM BY CHARGING AIR UPTO 30 BAR IN HP AIR BOTTLE IN FER.
MR7 - RENEW ALL JOINTS PACKING.
CARRY OUT MR ROUTINE ON HP AIR SYSTEM AS PER MAINTOP MT 35000 AS FOLLOWS: - SR2 - CHECK ALL RELIEF VALVES FOR SETTING. RESET IF REQUIRED. DR ENTAILS (I) CARRY OUT CALIBRATION OF RELIEF VALVE OF COMPRESSED AIR SYSTEM. (II) IF UNSERVICEABLE, REPAIR/ REPLACEMENT TO BE CARRIED OUT.
NR3 - REFIT 50% OF REDUCER. DR ENTAILS (I) REMOVAL OF REDUCER FROM SYSTEM. (II) REPAIR/ OVERHAULING TO BE CARRIED OUT. (III) FITMENT TO BE CARRIED OUT.
MR1 - UNDERTAKE 100% SURVEY OF SYSTEM PIPES AND RENEW DEFECTIVE PIPES. DR ENTAILS (I) CARRY OUT VISUAL SURVEY OF SYSTEM PIPE LINES. (II) IF FOUND DAMAGE, DEFECTIVE PIPES TO BE MANUFACTURED AS PER SAMPLE. (III) APPLICATION OF PAINT TO BE COMPLETED AS PER THE PAINT SCHEME. (IV) FITMENT TO BE COMPLETED. DIA - 40MM & 25MM MAT-MS
MR2 - REFIT THE FOLLOWING SYSTEM VALVES: DR ENTAILS (I) REMOVAL OF VALVE FROM SYSTEM. (II) CARRY OUT OVERHAULING. (III) CARRY OUT PRESSURE TEST. (IV) FITMENT TO BE UNDERTAKEN. (V) IF FOUND DEFECTIVE, REPLACEMENT TO BE CARRIED OUT. (A) ISOLATING VALVE, DIA-50 MM
(B) SDSL VALVE, DIA-15 MM
(C) SDNR VALVE, DIA-15 MM
(D) AIR HYDRANT VALVE, DIA-15 MM
(E) RELIEF VALVE, DIA-15 MM
(F) PRESSURE REDUCING VALVE, DIA-15MM
(G) AIR HYDRANT VALVE WITH NOZZLE, DIA-15 MM
(H) SDSL VALVE, DIA-10 MM
CARRY OUT MR ROUTINES OF SHOCK AND VIBRATION MOUNTINGS AS PER MT 41900 AS FOLLOWS: - NR1 - RENEW MOUNTINGS BASED ON RECOMMENDATION OF PRT REPORT. DR ENTAILS , AS PER PRT REPORT (I) REMOVAL OF OLD MOUNTS. (II) GROUPING OF NEW MOUNTS. (III) REPLACEMENT OF MOUNTS AS PER OEM SPECIFICATIONS. (IV) FITMENT OF NEW MOUNTS ALONG WITH SECURING FASTNERS.
(D) FIRE PUMP NO1 & NO2 MAKE- REISTOFLEX TYPE- ARCHED (MT) DESCRIPTION- FLEXI MOUNT FM 50
(E) SALVAGE PUMP NO.1 AND NO.2 MAKE- REISTOFLEX TYPE- ARCHED DESCRIPTION- ANTI VIBRATION FLEXI MOUNT
(H) MD AIR COMPRESSOR NO.1 & NO.2 MAKE- REISTOFLEX TYPE- ARCHED DESCRIPTION- FLEXI MOUNT FM 50
(J) DD AIR COMPRESSOR MAKE- REISTOFLEX TYPE- ARCHED DESCRIPTION- FLEXI MOUNT FM 50
(K) BILGE PUMP MAKE- REISTOFLEX TYPE- AVMS DESCRIPTION- FLEXI MOUNT FM 50
CARRY OUT MR ROUTINES ON FUEL TRANSFER PUMP NO.1 AND NO. 2 AS PER MT 31200 AS FOLLOWS: - SR1 - CARRY OUT PERFORMANCE TRIAL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.
SR2 - INSPECT CONDITION OF SUCTION/ DISCHARGE COMPENSATORS AND RENEW.
SR4 - CARRY OUT FUNCTIONAL TEST OF RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE.
SR5 - INSPECT THE SUCTION STRAINER AND RENEW.
SR7 - REFIT SUCTION AND DISCHARGE VALVE.
NR1 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
MR1 - DISMANTAL PUMP COMPLETELY. EXAMINE ALL PARTS FOR WEAR. MEASURE AXIAL AND DIAMETRICAL CLEARANCE OF GEAR WHEEL. CARRY OUT PERFORMANCE TRIAL ON COMPLETION.
CARRY OUT MR ROUTINES ON LO/ DIRTY OIL TRANSFER PUMP AS PER MT 31200 AS FOLLOWS: - SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.
SR2 - INSPECT CONDITION OF SUCTION/ DISCHARGE COMPENSATORS AND RENEW.
SR4 - CARRY OUT FUNCTIONAL TEST OF RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE.
SR5 - INSPECT THE SUCTION STRAINER AND RENEW.
SR7 - REFIT SUCTION AND DISCHARGE VALVE.
NR1 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
MR1 - DISMANTAL PUMP COMPLETELY. EXAMINE ALL PARTS FOR WEAR. MEASURE AXIAL AND DIAMETRICAL CLEARANCE OF GEAR WHEEL. CARRY OUT PERFORMANCE TRAIL ON COMPLETION.
CARRY OUT MR ROUTINES ON PORTABLE OIL TRANSFER PUMP AS PER MT 31200 AS FOLLOWS: - SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.
NR1 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
MR1 - DISMANTAL PUMP COMPLETELY. EXAMINE ALL PARTS FOR WEAR. MEASURE AXIAL AND DIAMETRICAL CLEARANCE OF GEAR WHEEL. CARRY OUT PERFORMANCE TRAIL ON COMPLETION.
CARRY OUT MR ROUTINES ON FIRE MAIN SYSTEM AS PER MT 46076 AS FOLLOWS: - SR1 - INSPECT THE CONDITION OF LAGGING ON THE FIRE MAIN LINE AND REPAIR.
SR4 - CALIBRATE ALL PRESSURE GAUGES SUCTION GAUGE -1 TO 2 BAR QTY - 02 DISCHARGE GAUGE 0 TO 10 BAR QTY- 07
NR4 - REFIT REDUCER, SAFTEY/ RELIEF VALVE ON THE SYSTEM.
MR1 - REFIT ALL HYDRANT VALVES. RENEW RUBBER SEALING RING.
MR2 - CARRY OUT SURVEY OF ALL SYSTEM PIPES BY ULTRASONIC THICKNESS MEASUREMENT. RENEW PIPES WHOSE RESIDUAL THICKNESS LESS THAN 75%.PRESSURE TEST 1.5 TIMES OF WORKING PRESSURE (WORKING PRESSURE-8 BAR). CHEMICALLY CLEAN PIPES WHICH HAVE NOT BEEN RENEWED.DIA- 150 MM
MR3 - CHECK AND RENEW ALL LEAKING PLUG/ BUTTERFLY VALVES
MR4 - REPAIR THE FOLLOWING LEAKING VALVES OTHER THAN THE PLUG AND BUTTERFLY VALVES: - (A) SDNR VALVE(RIGHT ANGLE TYPE), DIA-125 MM
(B) GATE VALVE, DIA-100 MM
(C) GATE VALVE WITH BEWEL GEAR ARRANGEMENT DIA-125MM
(D) SWING CHECK VALVE, DIA-100 MM
(E) GATE VALVE, DIA-80 MM
(F) BALL VALVE, DIA-80 MM
(G) PRESSURE RELIEF VALVE, DIA-80 MM
(H) SD VALVE, DIA-80 MM
(J) PRESSURE RELIEF VALVE, DIA-80 MM
(K) SDNR VALVE(RIGHT ANGLE TYPE), DIA-80 MM
(L) SD VALVE, DIA-65 MM
(M) DISC TYPE NR CHECK VALVE, DIA-80 MM
(N) SDNR VALVE(RIGHT ANGLE TYPE), DIA-65 MM
(P) DISC TYPE NR CHECK VALVE, DIA-65 MM
(Q) BALL VALVE, DIA-50 MM
(R) PRESSURE REDUCING VALVE, DIA-50 MM
(S) SDNR VALVE, DIA-50 MM
(T) SD VALVE, DIA-50 MM
(U) NR VERTICAL LIFT, DIA-50 MM
(V) PRESSURE RELIEF VALVE, DIA-50 MM
(W) NR FOOT VALVE, DIA-50 MM
DELIVERY VALVE, TWO WAY COCK AND CHECK NON RETURN VALVE OF PRIMER.
CARRY OUT MR ROUTINES ON BILGE SYSTEM AS PER MT 460012 AS FOLLOWS: - SR1 - REPAIR AND PRESSURE TEST FOLLOWING VALVES: (A) SDNR VALVE, DIA-40 MM
(B) PRESSURE REDUCING VALVE, DIA-32 MM
(C) SD VALVE, DIA-32 MM
(D) SD VALVE, DIA-20 MM
(E) PRESSURE RELIEF VALVE, DIA-25 MM
(F) BALL VALVE, DIA-20 MM
(G) SDSL VALVE(RIGHT ANGLE), DIA-20 MM
(H) SWING CHECK VALVE, DIA-20 MM
(J) SDNR VALVE(RIGHT ANGLE TYPE), DIA-20 MM
(K) PRESSURE REDUCING VALVE, DIA-15MM
(L) SD VALVE, DIA-15 MM
(M) PRESSURE RELIEF VALVE, DIA-15 MM
(N) 3 WAY COCK VALVE, DIA-6 MM
NR1 - CARRY OUT SURVEY OF 25% OF THE SYSTEM PIPES. ENSURE THAT AT LEAST 10% OF THE VALVES ARE SURVEYED ASHORE. DIA -80MM
MR1 - CARRY OUT SURVEY OF SYSTEM PIPES AS FOLLOWS: (A) CU-NI/ CU SYSTEM PIPES:- 25% ONBOARD AND 10% ASHORE, EXCLUDING PIPES BELOW BILGE PLATE IN MACHINERY COMPARTMENTS. DIA - 80 MM AND 40 MM MAT- CU-NI/CU AND FERROUS AND MS (B) FERROUS SYSTEM PIPES:- 75% ONBOARD AND 25% ASHORE, EXCLUDING BELOW BILGE PLATES IN MACHINERY COMPARTMENTS. (C) 100% SURVEY INCLUDING 50% ASHORE OF ALL SEA WATER AND BILGE SYSTEM PIPES WHICH ARE BELOW BILGE PLATE IN MACHINERY COMPARTMENTS.
CARRY OUT MR ROUTINES ON FRESH WATER SYSTEM AS PER MT 48600 AS FOLLOWS: - MR1 - OVERHAULING OF FOLLOWING VALVES IN THE SYSTEM: - (A) SDNR VALVE, DIA-32 MM
(B) SD GLOBE VALVE, DIA-32 MM
(C) BALL VALVE, DIA-32 MM
(D) SDNR VALVE, DIA-25 MM
(F) SD GLOBE VALVE, DIA-25 MM
(F) BALL VALVE, DIA-25 MM
(G) SD GLOBE VALVE, DIA-20 MM
(H) SD GLOBE VALVE, DIA-15 MM
(J) BIB COCK, DIA-15 MM
MR2 - SURVEY SYSTEM PIPES. RENEW DETERIORATED SYSTEM PIPES. ENSURE PIPE SUPPORTS/ CLAMPS ARE IN PLACE AS PER ORIGINAL DESIGN/ FIT POST ERECTION OF COMPLETE SYSTEM. PRESSURE TEST ON COMPLETION TO IDENTIFY LEAKS. DIA - 25 MM MAT-MS
SR1 - VISUALLY EXAMINE ENTIRE LENGTH OF HOT LAGGING FOR DOMESTIC HOT WATER SYSTEM AND RENEW.
SR6 - REFIT AND CALIBRATE RELIEF VALVE IN HYDROPHORE TANK PNEUMATIC CHARGING SYSTEM.
SR5 - CALIBRATE AUTOMATIC CUT-IN AND CUT-OUT MECHANISM OF HYDROPHORE TANK (PRESSURE SWITCH)
SR8 - PRESSURE TEST HYDROPHORE TANK AS PER SPECIFICATIONS BY SHIP STAFF AND PROVIDE CERTIFICATE
CARRY OUT NR ROUTINES ON SHIPS FUEL SYSTEM AS PER MT 31000 AS FOLLOWS: - SR7 - CHECK OPERATION OF HAND PUMPS IN THE SYSTEM AND OVERHAUL.
SR9 - OVERHAUL ALL QUICK SHUT VALVES OF FUEL SYSTEM.
NR3 - SURVEY 100 % SYSTEM PIPES. RENEW DETERIORATED SYSTEM PIPES AS REQUIRED. ENSURE PIPE SUPPORTS/CLAMPS ARE IN PLACE AS PER ORIGINAL DESIGN/FIT POST ERECTION OF COMPLETE SYSTEM. PRESSURE TEST ON COMPLETION TO IDENTIFY LEAKS. DIA - 40 MM MAT MS
NR4 - CARRY OUT CALIBRATION OF ALL INSTRUMENTATION AND SENSORS. REPLACE DEFECTIVE ONE. UNDERTAKE SERVICEABILITY CHECKS OF SEA FUELING HOSES.
NR1 - OVERHAUL FOLLOWING SYSTEM VALVES AND CARRY OUT PRESSURE TESTING OF SYSTEM VALVES: - (A) BALL VALVE, DIA-50 MM
(B) BALL VALVE, DIA-40 MM
(C) BALL VALVE, DIA-32
(D) BALL VALVE, DIA-15
(E) QUICK CLOSING VALVE. DIA-50 MM
(F) QUICK CLOSING VALVE. DIA-40 MM
(G) QUICK CLOSING VALVE. DIA- 25 MM
(H) QUICK CLOSING VALVE. DIA-15 MM
(J) SD GLOBE VALVE. DIA-40 MM
(K) SDNR VALVE. DIA 32 MM
(L) SWING CHECK VALVE. DIA-40 MM
(M) ISOLATING VALVE. DIA-40 MM
(N) ISOLATING VALVE. DIA-25 MM
(P) ISOLATING VALVE. DIA-20 MM
CARRY OUT MR ROUTINES ON SALVAGE SYSTEM AS PER MAINTOP MT 46540 SR1 - CALIBRATE ALL GAUGES IN THE SYSTEM.
NR3 - OVERHAUL THE FOLLOWING BALL/ FLAP VALVE OF THE SYSTEM AND PRESSURE TEST: - (A) SDSL VALVE. DIA-150MM
(B) GATE VALVE. DIA-150 MM
(C) SDNR (RIGHT ANGLE). DIA-150 MM
(D) SDNR (RIGHT ANGLE). DIA- 125 MM
(E) SDNR VALVE. DIA- 100 MM
(F) SDNR VALVE . DIA-150 MM
MR1 - SURVEY 50% SYSTEM PIPES AND VALVES AND RENEW.
CARRY OUT MR ROUTINES ON SPRINKLING SYSTEM AS PER MT 46029 AS FOLLOWS: - MR1 - CARRY OUT SURVEY OF SYSTEM PIPES AND RENEW DEFECTIVE PIPES. DIA - 40 MM AND 25 MM MAT MS
MR2 - CARRY OUT OVERHAUL OF FOLLOWING VALVE:- (A) SDSL VALVE(RIGHT ANGLE). DIA-125 MM (B) SDSLVALVE(STRAIGHT). DIA-125 MM
CARRY OUT MR ROUTINES OF HP AIR COMPRESSOR NO.1, NO.2 AND DD AIR COMPRESSOR AS PER MT 35171. AS FOLLOWS: - 2K H1 - CARRY OUT CHEMICAL CLEANING OF ALL AFTERCOOLER.FLUSH THE TUBES WITH WARM WATER AND ALLOW THEM TO TO DRY AFTER FLUSHING.
2K H2 - INSPECT CLEAN COMPRESSOR VALVES, RENEW IF DEFECTIVE.
SR1 - CALIBRATE ALL INSTUMENTATION AND SAFETIES. CALIBRATION CERTIFICATE FOR 02 YEARS TO BE PROVIDED (A) PRESSURE GAUGE (B) TEMPERATURE SENSOR. (C) PRESSURE SWITCH. (E) PRESSURE RELIEF VALVE.
PRR1 - CARRY OUT COMPREHENSIVE PERFORMANCE TRIALS OF THE COMPRESSOR INCLUDING CAPACITY TRIALS, VIBRATION TRIALS. CST REPORT BE USED AS THE REFERENCE DOCUMENT FOR TRIALS. TAKE ASSISTANCE OF MTU AS REQUIRED. CARRY OUT OVERHAUL OF COMPRESSOR DURING REFIT, IF PERFORMANCE IS SUB-OPTIMAL.
NR1 - CHECK ALL RELIEF VALVES AND SAFTEY VALVES FOR ITS PROPER FUNCTIONING AND RESET IF NECESSARY.
SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY.
SR3 - CALIBRATE ALL INSTRUMENTATION. PRESSURE GAUGES, (SUCTION GAUGES, QTY-01, RANGE -1 TO 02 BAR, DISCHARGE AND SYSTEM GAUGES, QTY-01, RANGE 0 TO 5 BAR)
SR4 - INSPECT AND RENEW SUCTION STRAINER.
NR2 - REFIT SUCTION AND DISCHARGE VALVE.
NR3 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION, STIFFENERS AND SUPPORTING RIBS.
MR1 - UNDERTAKE OVERHAUL OF PUMP NOT ENVISAGED FOR REPLACEMENT IN REFIT. UNDERTAKE TRAIL ON COMPLETION.
CARRY OUT MR ROUTINES ON FIRE PUMP NO. 1 & 2 AS PER MT 45000 AS FOLLOWS: - SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY.
SR3 - CALIBRATE ALL INSTRUMENTATION. PRESSURE GAUGES & SUCTION GAUGES, QTY-01 EACH, RANGE -1 TO 02 BAR, DISCHARGE AND SYSTEM GAUGES, QTY-01 EACH, RANGE 0 TO 5 BAR
SR4 - INSPECT AND RENEW SUCTION STRAINER.
NR2 - REFIT SUCTION AND DISCHARGE VALVE.
NR3 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
MR1 - UNDERTAKE OVERHAUL OF PUMP NOT ENVISAGED FOR REPLACEMENT IN REFIT. UNDERTAKE TRAIL ON COMPLETION.
SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY.
SR3 - CALIBRATE ALL INSTRUMENTATION. PRESSURE GAUGES, (SUCTION GAUGES, QTY-01, RANGE -1 TO 02 BAR, DISCHARGE AND SYSTEM GAUGES, QTY-01, RANGE 0 TO 5 BAR)
SR4 - INSPECT AND RENEW SUCTION STRAINER.
NR2 - REFIT SUCTION AND DISCHARGE VALVE.
NR3 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION, STIFFENERS AND SUPPORTING RIBS.
MR1 - UNDERTAKE OVERHAUL OF PUMP NOT ENVISAGED FOR REPLACEMENT IN REFIT. UNDERTAKE TRIAL ON COMPLETION.
CARRY OUT MR ROUTINES ON SALVAGE PUMP NO. 1 AND NO. 2 AS PER MT 45000 AS FOLLOWS: - SR1 - CARRY OUT PERFORMANCE TRAIL OF OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION / DISCHARGE PRESSURE ), VIBRATION TRAILS, INSULATION / SPM CHECKS ON MOTOR , MOTOR STARTING AND RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECT IF ANY.
SR3 - CALIBRATE ALL INSTRUMENTATION. PRESSURE GAUGES, SUCTION GAUGES, QTY-01 EACH, RANGE -1 TO 02 BAR, DISCHARGE AND SYSTEM GAUGES, QTY-01 EACH, RANGE 0 TO 5 BAR
SR4 - INSPECT AND RENEW SUCTION STRAINER.
NR2 - REFIT SUCTION AND DISCHARGE VALVE.
NR3 - CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. RENEW DETERIORATED FOUNDATION TIFFNERS AND SUPPORTING RIBS.
NR4 - CARRY OUT COMPLETE FUNCTIONAL TRIALS OF ALL SALVAGE PUMPS, NOT PROVIDED WITH DEDICATED ENCLOSED CATCHMENT AREA, AT THE YARD FLOOR.
MR1 - UNDERTAKE OVERHAUL OF PUMP NOT ENVISAGED FOR REPLACEMENT IN REFIT. UNDERTAKE TRIAL ON COMPLETION.
CARRY OUT MR ROUTINE ON DD PORTABLE FIRE PUMP AS PER MAINTOP MT 46442 MR1 - OVERHAUL THE PUMP. RENEW DEFECTIVE COMPONENTS.
MR2 - EXAMINE THE CARBON FACES , SEAL FACES AND " O" RINGS OF TWO SEALS RENEW WORN PARTS
MR3 - RENEW ALL SEALS AND JOINTS.
MR4 - REFIT DELIVERY VALVE , TWO WAY COCK AND CHECK NON RETURN VALVE OF PRIMER.
MR5 - RENEW S.V. MOUNTNINGS.
MR6 - EXAMINE TUBULAR FRAME. REPLACE IF DEFECTIVE.
ENGINEERING - PART II
CALIBRATION OF TORQUE WRENCHES TO BE UNDERTAKEN AND CERTIFICATE TO BE PROVIDED.(TORQUE 60NM AND 320 NM)
RENEWAL OF HOT LAGGING OF ALL THREE ENGINES POST CARRING OUT ROUTINES/ REPAIRES.
ALL THREE MAIN ENGINES SEA CHEST VALVES NOT HOLDING. OVERHAULING TO BE UNDERTAKEN. DIA- 150MM, QTY- 03
EXHAUST FLAP LIMIT SWITCH OF ALL THREE MAIN ENGINES MALFUNCTIONING. LIMIT SWITCHES TO BE REMOVED , REPLACED WITH NEW LIMIT SWITCHES . TRIALS TO BE UNDERTAKEN POST FITMENT. OEM - M/S MTU INDIA LTD
TURNING TOOL LIMIT SWITCH OF ALL THREE MAIN ENGINES MALFUNCTIONING. LIMIT SWITCHES TO BE REMOVED , REPLACED WITH NEW LIMIT SWITCHES . TRIALS TO BE UNDERTAKEN POST FITMENT. OEM - M/S MTU INDIA LTD
HOT LAGGING ON EXHAUST SYSTEM OF MAIN ENGINES DAMAGED . TO BE RENEWED. JOB ENTAILS REMOVAL OF OLD LAGGING AND RENEWAL WITH NEW HOT LAGGING. APPROX. LENGTH 100 MTRS.
COOLANT SAMPLING COCKS OF ALL THREE MAIN ENGINES LEAKING. TO BE RENEWED AND FITTED BACK AND PROVED FOR SATISFACTORY PERFORMANCE. (QTY-03)
EXHAUST FLAP OF ALL THREE MAIN ENGINES HARD TO OPERATE. OVERHAULING OF EXHAUST FLAP ASSEMBLY TO BE CARRIED OUT.
CENTRE MAIN ENGINE EXHAUST TRUNKING DECK PIERCING/ DECK TUBE PERISHED/ HOLED/ THINNED IN WATER JET COMPARTMENT. DECK TUBE TO BE RENEWED AND DEFECT TO BE RECTIFIED SUITABLY.
MANUFACTURING AND FITMENT OF EXHAUST SHIELD TO BE UNDERTAKEN IN SITU, MAT-SS SHEET.
CLEANING, REMOVAL OF MARINE GROWTH, SURFACE PREPARATION AND PAINT RENEWAL OF ALL THREE WATERJET UNITS INCLUDING BUCKETS AND NOZZLE TO BE UNDERTAKEN (PAINT TO BE SUPPLIED BY SHIPYARD)
SEA WATER LEAKAGE FROM EXHAUST MANIFOLD WATER INJECTION PIECE OF DA .WATER INJECTION PIECE TO BE MANUFACTURED AS PER FITTED SAMPLE AND FITMENT IN SITU. MAT- SS , SIZE- 100 MM
LOCAL OPERATING PANEL SECURING BOLTS OF ALL THREE DA DETORATED.SECURING BOLT TO BE MANUFACTURED AS PER FITTED SAMPLE AND FITMENT IN SITU
CONTROLS WIRING OF SDA DAMAGED AT VARIOUS LOCATION LEADING TO LOSS OF CONTINUITY,GROUNDING OF THE WIRING WHILE NORMAL OPERATION. RE-WIRING OF THE DA CONTROL SYSTEM AND PROVING IN SITU.
HOT LAGGING ON EXHAUST SYSTEM OF ALL THREE DAs PERISHED TO BE RENEWED. JOB ENTAILS REMOVAL OF OLD LAGGING AND RENEWAL WITH NEW HOT LAGGING. APPROX. LENGTH 20 MTRS.
ALL THREE DA SEA CHEST VALVES NOT HOLDING. OVERHAULING TO BE UNDERTAKEN. DIA- 80MM.
4 TPD RO PLANT CONTROL CABINET ERODED/ PERISHED. REFURBISHMENT/ REPLACEMENT OF CONTROL CABINET TO BE UNDERTAKEN. JOB INVOLVES REMOVAL AND REFITMENT OF EXISTING WIRING, COMPONENTS AND SETTING TO WORK.
RENEWAL OF ALL PERSIHED DZUS FASTENERS AND SATISFACTORY TRIALS
RUBBER INSERTS/COMINGS TO BE FITTED BETWEEN THE BILGE PLATE AND SUPPORTING FRAMES.
FIRE HYDRANT COUPLING DEFORMED/DEFECTIVE AT VARIOUS LOCATIONS. TO BE RENEWED WITH 63MM INSTANTANEOUS COUPLING. MAT- BRASS, QTY- 07.
SALVAGE PUMP NO. 1 & 2 FOUNDATION CRACKED/ DETERIORATED. NEW FOUNDATION TO BE MANUFATURED AND TO BE FITTED INSITU.
HOT LAGGING IN HPAC 1, 2 AND DD COMPRESSOR DISCHARGE LINE PERISHED. TO BE RENEWED.
LP AIR BLOWTHROUGH VALVES OF ALL SEA CHESTS NOT HOLDING AND LEAKING, FURTHER CAUSING INGRESS OF SEA WATER IN PNEUMATINC BLOW THROUGH LINES. TO BE RENEWED. DIA- 1/4 INCH, QTY- 15.
LP AIR BLOWTHROUGH PIIPE LINES OF SEA CHEST PERISHED/ HOLED/ THINNED. TO BE RENEWED ALONGWITH ADAPTERS AND FITTED INSITU. MAT- SS, DIA- 15MM
FIRE MAIN NO 1 & 2 PUMP FOUNDATION DETERIORATED/ CRACKED. NEW FOUNDATION TO BE MANUFACTURED AND TO BE FITTED INSITU. MAT- MS.
BILGE PUMP FOUNDATION DETERIORATED/ CRACKED. NEW FOUNDATION TO BE MANUFACTURED AND TO BE FITTED INSITU. MAT- MS.
COLD AND HOT LAGGING PERISHED IN AC PLANT NO. 1&2. TO BE RENEWED.
PORTABLE HALOGEN DETECTOR MALFUNCTIONING TO BE CALIBRATED AND CALIBRATION CERTIFICATE TO BE PROVIDED.
AC SEA WATER PUMP SEA CHEST VALVE NOT HOLDING. TO BE OVERHAULED AND PRESSURE TESTED UP TO 04 KG/CM2. SIZE - 80 MM.
BILGE SUCTION PIPE LINE OF FIRE MAIN NO. 2 PERISHED/ THINNED/ HOLED AT VARIOUS LOCATIONS. NEW PIPE LINE TO BE MANUFACTURED AND FITTED INSITU AS PER SAMPLE. MAT- CUNI, DIA- 65MM.
FREQUENT FAILURE OF MECHANICAL SEALS, BEARINGS, WEAR RINGS AND COUPLING PADS ENCOUNTERED ON BOTH FIRE MAIN PUMPS DURING OPS CYCLE. SUSPECT CASING CLEARANCE INCREASED. DEFECT TO BE RECTIFIED SUITABLY AND PUMPS TO BE PROVEN IN SITU.
FIRE MAIN PIPE LEADING TO BULKHEAD LEAKING IN AER. PIPE TO BE RENEWED IN SITU (MATERIAL-CUNI).
ADAPTER FOR FIRE PUMP NO 1 & 2 COOLING LINE DETERIORATED. TO BE MANUFACTURED AS PER SAMPLE.
PIPE LINE SECURING BRACKETS DAMAGED AT VARIOUS LOCATIONS. NEW BRACKETS TO BE MANUFACTURED AND FITTED IN SITU. MAT- MS, QTY- 50
RENEWAL OF VARIOUS PIPE LINES ALONGWITH END FLANGES TO BE UNDERTAKEN AS PER SAMPLE. MAT. - CUNI, DIA-65MM.
03 IN NO. AIR SYSTEM PIPES BROKEN/ PERSHIED. TO BE MANUFACTURED AS PER SAMPLE. MAT-SS, DIA -25 MM.
PRESSURE GAUGE PIPES DAMAGED/ BROKEN. TO BE MANUFACTURED AS PER SAMPLE. MAT-COPPER, DIA-6MM.
CALIBRATION OF AUTO CUT IN/ CUT OFF PRESSURE SWITCH TO BE UNDERTAKEN (CUT IN/ CUT OFF PRESSURE 25/30 KG/CM2 RESPECTIVELY).CERTIFICATE TO BE PROVIDED
CALIBRATION OF HIGH TEMPERATURE CUT OUT OF BOTH MD HP AIR COMPRESSORS TO BE UNDERTAKEN, SET TEMPERATURE-120 DEGREE CELCIUS.CERTIFICATE TO BE PROVIDED
CALIBRATION/SERVICEABILITY CHECKS OF AUTO DRAIN MECHANISM OF BOTH MD HP AIR COMPRESSORS TO BE UNDERTAKEN. CERTIFICATE TO BE PROVIDED
NON RETURN VALVE OF BILGE EDUCTOR IN FER AER AND WATERJET NOT HOLDING. TO BE OVERHAULED (SIZE-65 MM).
BILGE PUMP TO FIRE MAIN LINE VALVE NOT HOLDING. TO BE OVERHAULED. SIZE 80MM.
BILGE PUMP TO WASTE WATER TANK INTERCONNECTING LINE TO BE MANUFACTURED AS GIVEN LENGTH-4MTR ( DIA-65M)AND VALVE MALFUNCTIONING, TO BE OVERHAULED. SIZE-65MM.
FREQUENT FAILURE OF MECHANICAL SEALS, BEARINGS, WEAR RINGS AND COUPLING PADS ENCOUNTERED ON SHIP'S FITTED BILGE PUMP DURING OPS CYCLE. SUSPECT CASING CLEARANCE INCREASED. DEFECT TO BE RECTIFIED SUITABLY AND PUMP TO BE PROVEN IN SITU.
BILGE PUMP SEA CHEST VALVE NOT HOLDING. TO BE OVERHAULED AND PRESSURE TESTED UP TO 04 KG/CM2. SIZE - 80 MM.
AIR REDUCER FOR FW HYDROPHORE MALFUNCTIONING. REDUCER (08 KG/CM2 TO 04 KG/CM2) TO BE OVERHAULED AND CERTIFICATE TO BE PROVIDED.
MANUFACTURING OF GAUGE FITTING ADAPTOR AS PER SAMPLE PROVIDED BY SS VIEW PRESENTLY FITTED ONE PERISHED
WORKING AIR SYSTEM VALVES NOT HOLDING. TO BE OVERHAULED AND PRESSURE TESTED UPTO 08 KG/CM2. (SIZE - 32 MM)
VENTILLATION TRUNKING OF FER AND AER DAMAGED/PERISHED. NEW TRUNKING TO BE MANUFACTURED AND FITTED INSITU. MAT- GI.
03 IN NO. AIR SYSTEM PIPES BROKEN/ PERSHIED. TO BE MANUFACTURED AS PER SAMPLE. MAT-SS, DIA -25 MM.
FUEL SYSTEM PIPES BROKEN/ PERSHIED. TO BE MANUFACTURED AS PER SAMPLE. MAT- MS, DIA- 40 MM.
SEA WATER SYSTEM PIPES BROKEN/ PERSHIED. TO BE MANUFACTURED AS PER SAMPLE. MAT- CUNI, DIA- 80MM. OEM - GRSE LTD KOLKATA
FRESH WATER SYSTEM PIPES BROKEN/ PERSHIED. TO BE MANUFACTURED AS PER SAMPLE. MAT-CUNI, DIA- 20MM.
SHIP'S FITTED DD AIR COMPRESSOR NOISY IN OPERATION AND CHARGING CAPACITY REDUCED, SUSPECT COMPRESSION RINGS WORN OUT. COMPRESSOR TO BE OVERHAULED.
(A) BILGE PLATES DEFORMED/DETERIORATED AT VARIOUS LOCATIONS. NEW BILGE PLATES TO BE MANUFACTURED AS PER TEMPLATING AND TO BE FITTED IN SITU. MAT.-AL, QTY-50 SQM. (B) BILGE PLATE SECURING FRAMES DETERIORATED/DEFORMED AT VARIOUS LOCATIONS. TO BE MANUFACTURED AS PER TEMPLATING AND FITMENT IN SITU. MAT.-AL, QTY-50 NOS
IN VIEW OF THE FACT THAT THE DD SCOPE OF WORK WOULD BE UNDERTAKEN IN MONSOONS, THE SHIPYARD IS TO ENSURE THAT THE SHIP IS EITHER DOCKED INSIDE A COVERED DOCK OR A SUITABLE CANOPY IS PROVIDED IN DRY DOCK TO ENSURE THERE IS NO WATER INGRESS INSIDE THE SHIP AND PROGRESS OF WORK IN THE DRY DOCK PHASE IS NOT HAMPERED DUE TO MONSOONS.
FREQUENT FAILURE OF MECHANICAL SEALS, BEARINGS, WEAR RINGS AND COUPLING PADS ENCOUNTERED ON SHIP'S FITTED BILGE PUMP DURING OPS CYCLE. SUSPECT CASING CLEARANCE INCREASED. DEFECT TO BE RECTIFIED SUITABLY AND PUMP TO BE PROVEN IN SITU.
SALVAGE PUMP NO. 1&2 SEA CHEST VALVES NOT HOLDING. OVERHAULING TO BE UNDERTAKEN. DIA-150MM, QTY-02.
FIRE MAIN PUMP NO. 1&2 SEA CHEST VALVE TO BE OVERHAULED VIEW NOT HOLDING. DIA- 125MM, QTY- 02. OEM- M/S JOHNSON PUMPS INDIA LTD,
CALIBRATION OF 01 NAGMAN LP CALIBRATOR(MPC-E-P-10-N) AND 01 HP CALIBRATOR (MPCE 700). CERTIFICATE BE ISSUED
FOLLOWING EQUIPMENT TO BE REMOVED, HANDED OVER TO NSRY NOMINATED AGENCY FOR REPAIR / OVERHAULING AND INSTALLATION TO BE UNDERTAKEN SUBSEQUENTLY: - (A) MAIN ENGINE - 03 (B) DA - 03 (C) GEARBOX - 03 (D) WATERJET - 03 JOB INVOLVES CUTTING OF SOFT PATCHES AND LIFTING THE EQUIPMENT USING LOAD TESTED CRANE.ALIGNMENT OF THE FOLLOWING EQUIPMENT TO BE UNDERTAKEN THROUGH OEM / OEM AUTHORISED REPS: - (A) GEARBOX TO WATERJET (03) (B) MAIN ENGINE TO GEARBOX (03)
CALIBRATION OF NAGMAN TEMPERATURE CALIBRATOR AND CERTIFICATE BE ISSUED
CALIBRATION OF KITTIWAKE TEST KIT AND CERTIFICATE BE ISSUED.
FER , PUMP ROOM AND AER BILGE EDUCTOR SUCTION COCK HARD TO OPERATE. DIA-65 MM, TYPE-BALL TYPE COCK. TO BE OVERHAULED
RENEWAL OF 'DZUS' FASTENERS FOR EXISTING BILGE PLATES. SECURING OF TO BE UNDERTAKEN AS PER DME SPEC 464 (HQSNC LETTER EG/3000/POLICY DATED 28 MAY 18 REFERS).
HAND HELD GAS DETECTOR MALFUNCTIONING. CALIBRATION TO BE CARRIED OUT.
DD COMPRESSOR FAILED TO START. SUSPECT FUEL INJECTION PUMP DRIVE MECHANISM, FUEL INJECTOR FAULTY. FUEL INJECTOR, FIP TO BE CALIBRATED AND FIP DRIVE MECHANISM TO BE OVERHAULED.
(A) FOLLOWING TANK LEVEL SENSOR SHOWING ERRATIC READING IN MCS-5: - (I) FUEL RU TANK - 02 (PORT AND STBD ) (II) FUEL STORAGE TANK - 03 (17-19, 19-23, 23-25) (III) F/W TANK -01. TANK LEVEL SENSORS TO BE REMOVED, CALIBRATED AND FITTED BACK. REPLACE, IF DEFECTIVE
COLD LAGGING OF REFRIGERANT PIPE PERISHED AT VARIOUS LOCATIONS. COLD LAGGING TO BE RENEWED. LENGTH 12 MTR
04 GAUGE LINE OF FW SYSTEM THINNED AND FREQUENTLY BURSTING. GAUGE LINE ALONG WITH END FITTINGS TO BE MANUFACTURING OF LINE AS PER SAMPLE.
SERVICEABILITY CHECKS OF 01 REDUCER OF HYDROFORE SYSTEM TO BE CATRRIED OUT. RANGE 7 TO 4 BAR
AIR VALVE OF GENERAL POINT ON UPPER DECK NOT HOLDING, TO BE OVERHAULED. DIA 15 MM, QTY 02
LP AIR LINE AT STBD CATWALK BROKEN. ASSISTANCE REQUIRED FOR INSITU WELD OF PIPE. QTY 01, DIA 15MM
RUNNING INDICATION OF FOLLOWING EQUIPMENT NOT COMING IN REMOTE STARTER PANEL IN MCR : RO PLANT, FO CENTRIFUGE , FIREMAIN 1 AND 2. TO BE RECTIFIED
QUICK SHUT OFF VALVE AT VARIOUS LOCATION PULLY DAMAGED. RENEW COMPLETE WIRING VIEW PERISHED.
SALVAGE PUMP COOLING LINE ADAPTOR DAMAGED. ADAPTOR MAY BE MANUFACTURED AS PER SAMPLE. QTY-01. MAT BRASS
WIRE MESH OF VENTILATION TRUNKING DAMAGED IN MACHINERY COMPARTMENT. RA FOR MANUFACTURING OF WIRE MESS AS PER SAMPLE. QTY 15
QUICK SHUT OFF VALVE AT VARIOUS LOCATION DAMAGED. RENEWAL OF COMPLETE WIRING VIEW PERISHED.
CALIBRATION OF FOLLOWING GAUGES : (A) INLET PRESSURE GAUGE -1 TO 10 BAR QTY 02 (B) DISCHARGE PRESSURE GAUGE 1 TO 10 BAR, QTY 02
04 VALVE OF FOT PUMP 1 & 2 NOT HOLDING, SUSPECTED SEAT DEAMGED. SAME TO BE OVERHAULED. DIA - 25 MM
04 GAUGE LINE OF FOT SYSTEM BROKEN. MANUFACTURING OF LINE AS PER SAMPLE WITH END FITTINGS.
HANDLE OF PRIMING COCK OF DD PUMP BROKEN.SAME TO BE MANUFACTURED AS PER SAMPLE
CARRY OUT SURVEY OF 50% PIPES. RENEW AS NESSARY:- (A) DIA-150 MM, LENGTH-30 MTR (B) DIA 125 MM, LENGTH - 20 MTR
REFIT REDUCER, SAFETY - RELIEF VALVE ON THE SYSTEM.
MANUFACTURING OF SUCTION AND DISCHARGE BELLOW OF FIREMAIN NO 1 AND 2 AS PER SAMPLE
RENEW SV MOUNTINGS.
EXAMINE TUBULAR FRAME. REPLACE IF FOUND DEFECTIVE.
CALIBRATE ALL PRESSURE GAUGES, (SUNCTION GAUGES-03, RANGE--2 BAR-03 BAR, DISCHARGE GAUGES-QTY-09, RANGE-0 TO 10 BAR)
MANUFACTURING OF EDUCTOR STRAINER AS PER SAMPLE.
CALIBRATE ALL REDUCER IN FIREMAIN SYSTEN QTY-02 SET PRESSURE - 10-02BAR (DIA-65MM , 85MM)
CALIBRATE ALL AIR REDUCER , PRESSURE(10-4 BAR)QTY-02
THE FOLLOWING OVERBOARD VV TO BE OVERHAULED (1) FIREMAIN OVERBOARD VALVE(80 MM) QTY- 02 (2)OWS OVERBOARD VV (20 MM) QTY-01 (3) DA EXHAUST OVERBOARD VV (125 MM) QTY-03 (4) MAIN ENGINE EXHAUST OVERBOARD VV (450 MM) QTY-3 (5) BILGE PUMP OVERBOARD VV(80 MM) QTY- 01 (6) AC SEA WATER PUMP OVERBOARD VV (65 MM) QTY-01 (7) RO PLANT OVERBOARD VV(20 MM) QTY-01 (8) SALVAGE PUMP OVERBOARD (125 MM) QTY-02 (9) AMMO LOCKER DIRECT FLOODING SEA CHEST VV(125 MM) QTY -01 (10) GEARBOX OVERBOARD V(40 MM)QTY-03 (11) MAIN ENGINE OVERBOARD (100 MM) QTY-03 (12) EDUCTOR OVERBOARD VV (65 MM) QTY-07 (13) DISCHARGE FROM MAIN ENGINE VENT OVERBOARD VV (20 MM) QTY-03 (14) DA OVERBOARD VV(50 MM) QTY-03
THE FOLLOWING SEA CHEST VV TO BE OVERHAULED (1) FIREMAIN SEA CHEST VALVE(125 MM) QTY- 02 (2)OWS SEA CHEST VV (20 MM) QTY-01 (3) DA SE CHEST VV (50 MM) QTY-03 (4) MAIN ENGINE SEA CHEST VV (150 MM) QTY-03 (4) BILGE PUMP SEA CHEST VV(100 MM) QTY- 01 (5) AC SEA WATER PUMP SEA CHEST (65 MM) QTY-01 (6) RO PLANT SEA CHEST VV(25 MM) QTY-01 (7) SLAVAGE PUMP (125 MM) QTY-02 (8) AMMO LOCKER DIRECT FLOODING SEA CHEST VV(125 MM) QTY -01 (9) PRE FLOODING VALVE SIZE- 200 MM QTY-01
PRESSURE GAUGE PIPES DAMAGED/ BROKEN. TO BE MANUFACTURED AS PER SAMPLE. MAT- COPPER, DIA-10MM.
CALIBRATION OF COMPOUND PRESSURE GAUGE, QTY-10 RANGE -(-1 TO 6 BAR) IF DEFCETIVE SAME TO BE REPLACED
CALIBRATION OF DISCHARGE PRESSURE GAUGE, QTY-10 RANGE- ( 1 TO 10 BAR) IF DEFCETIVE SAME TO BE REPLACED
ENGINEERING - PART III
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 24 Dec 18. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN Salvage Pump to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment/modification of new pump foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Instilation and fitment of new equipment. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision (if required). (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 13 Jun 23. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN Domestic Fresh Water Pump to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment/modification of new pump foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Instilation and fitment of new equipment. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision (if required). (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 24 Dec 18 NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: YARD TO SUPPLY Fire Pump to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment of new pump foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Installation, fitment and connectorisation of new equipment with pipelines and metallic bellows. (f) Buttoning-up of systems and electrical connections with new cables catered by Shipyard. New LCP to be installed with necessary foundation modification. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision (if required). (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC EG/3000/ ABER DATED 13 Jun 23. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN Fuel oil Purifier to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment/modification of new equipment foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Instilation and fitment of new equipment. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision. (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 24 Dec 18. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN HP Air Compressor to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment/modification of new equipment foundation (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Instilation and fitment of new equipment. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision. (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 05 Sep 23. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN DD Air Compressor to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment and connection. (b) Manufacturing and necessary renewal / modification of foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Installation and fitment of new equipment. Shipyard to cater for any modification including installation material not part of BoM. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision. (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ABER APPROVED VIDE HQSNC LETTER EG/3000/ ABER DATED 24 DEC 18. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN BILGE Pump to be replaced as part of ABER. SoW includes the following:- (a) Removal of old equipment, connection and foundation. (b) Manufacturing and fitment/modification of new pump foundation. (c) Renewal of SV Mounts. (d) De-Preservation and serviceability checks of new equipment. (e) Instilation and fitment of new equipment. (f) Buttoning-up of systems and electrical connections. (g) Commissioning of equipment and trials for satisfactory / optimum performance by OEM/ under OEM supervision (if required). (h) Offer trials to Naval Trials agencies (MTU) and liquidate all observations.
ELECTRICAL - PART I
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS (30001.06 - 30001.23) AS PER MAINTOP MT 58200 AS FOLLOWS: - SR2 - CARRY OUT THE ALIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR. IF ALIGNMENT FOUND UNSAT, REALIGN ALL PUMP WITH RESPECTIVE MOTOR. STW AND TRIAL TO BE CARRIED OUT, NECESSARY ALIGNMENT CERTIFICATE TO BE ISSUED.
SR3 - CARRY OUT SPM CHECKS. DR ENTAILS IF SPM VALUE FOUND UNSAT. REPLACE ALL BEARING WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
SR6 - CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR1 - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STARTERS SUBJECT TO QC CHECKS. CARRY OUT TEST BED LOAD TRIAL FOR 4 HOURS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
SURFACE PREPARATION AND PAINTING WITH HEAT RESISTANT PAINT (EQUIPMENT PAINT) IN MOTORS AND STARTERS (30001.06 - 30001.23) AS PER NAVAL STANDARDS
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (I) AC COMPRESSOR MOTOR, CAPACITY - 30 KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (II) FIREMAIN MOTOR, CAPACITY - 37KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (III) SALVAGE PUMP MOTOR , CAPACITY - 18.5KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (IV) OIL WATER SEPERATOR MOTOR CAPACITY - 1KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (V) BEARING OIL PUMP MOTOR CAPACITY - 0.18KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS (30001.01 - 30001.04) AS PER MAINTOP MT 58200 (VI) CENTRIFUGE PUMP MOTOR CAPACITY - 0.75KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (VII) BOAT DAVIT SLEW AND HOIST MOTOR - CAPACITY - 2.2KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (VIII) HP AIR COMPRESSOR MOTOR ,CAPACITY- 7.5 KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (IX) AHU MOTOR(1&2) , CAPACITY - CAPACITY - 9.3KW & 0.75KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (X) BILGE PUMP MOTOR - CAPACITY - 15KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XI) FRESH WATER PUMP MOTOR - CAPACITY - 1.5KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XII) AC SEA WATER PUMP MOTOR- 3.7KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XIII) CAPSTAN MOTOR (5.5KW), MOORING CAPSTAN (4 KW)
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XIV) FUEL TRANSFER PUMP MOTOR (2.2 KW)
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XV) DIRTY OIL PUMP MOTOR - CAPACITY - 1KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XVI) GALLEY GARBAGE MOTOR CAPACITY - 1KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XVII) STP MOTOR CAPACITY - 3KW
CARRY OUT SR & NR ROUTINES ON HEAVY DUTY AC MOTORS AS PER DL 30001.01 - 30001.04 ON: - (XVIII) HYDRAULIC PUMP MOTOR CAPACITY - 3KW
CARRY OUT ANNUAL AND NR ROUTINES ON MOTORS (30002.04 - 30002.06) AS PER MT 58400 AS FOLLOWS: - A2 - REMOVE AND CARRY OUT REPLACEMENT OF BEARING BASED ON QC) OF THE MOTOR FITTED IN TRUNKINGS FOR ENGINE ROOM / DA COMPARTMENT AND GALLEY EXHAUST. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR1 - REMOVE AND OVERHAUL FAN UNIT SUBJECT TO QC CHECKS (A) CALIBRATE THE PROTACTION RELAYS (B) CARRY OUT DYNAMIC BALANCING OF FAN. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR2 - INSPECT THE SUPPLY CABLES / WIRING FOR DAMAGE /DETERIORATION (30002.04 - 30002.06). RENEW WITH NEW ONE IF REQUIRED.
CARRY OUT ANNUAL AND NR ROUTINES ON MOTORS (30002.01 - 30002.03) AS PER MAINTOP NO. MT 58400 FOR VENTILATION MOTOR, RATING - 0.75 KW (BOSUN STORE, PUMP ROOM, PROVISION STORE, CO2 COMPARTMENT, STP COMPARTMENT, WATERJET, EDA COMPARTMENT, GALLEY, WC BATHROOM,CAPSTAIN 'S BATHROOM MOTORS)
CARRY OUT ANNUAL AND NR ROUTINES ON MOTORS (30002.01 - 30002.03) AS PER MAINTOP NO. MT 58400 FOR TWIN MODE ENGINE ROOM VENTILATION/EXHAUST MOTOR (3.7 KW)
CARRY OUT ANNUAL AND NR ROUTINES ON MOTORS (30002.01 - 30002.03) AS PER MAINTOP NO. MT 58400 FOR EXHAUST MOTOR ENGINE ROOM (7.5KW)
CARRY OUT ANNUAL AND NR ROUTINES ON STARTERS (30003.11 - 30003.21) AS PER MT 58400 AS FOLLOWS: - A2 - REMOVE AND CARRY OUT REPLACEMENT OF BEARING BASED ON QC) OF THE MOTOR FITTED IN TRUNKINGS FOR BOILER ROOM / ENGINE ROOM / DA COMPARTMENT AND GALLEY EXHAUST. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR1 - REMOVE AND OVERHAUL FAN UNIT SUBJECT TO QC CHECKS (INCLUDING MOTOR AND STARTER). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
(A) CALIBRATE THE PROTECTION RELAYS.
(B) CARRY OUT DYNAMIC BALANCING OF FAN.
ASSEMBLE AND INSTALL THE UNIT ONBOARD, IF REQUIRED RENEW THE BEARINGS. TRY OUT UNIT IN PLACE. STW AND TRIAL TO BE CARRIED OUT.
FOR MOTORS (30003.11 - 30003.21) NOT ACCESSIBLE VIEW BEING FITTED IN TRUNKINGS / HIGHLY RESTRICTED LOCATION, THE STARTING AND RUNNING CURRENT TO BE RECORDED AND TRENDED FOR ANY INCREASING VALUE. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. NOTE:- SS TO CARRY OUT SPM CHECKS AND FORWARD REPORT TO QC.
NR2 - INSPECT THE SUPPLY CABLES/ WIRING FOR DAMAGE/ DETERIORATION. RENEW IF REQUIRED (SS TO QUOTE SPECIFIC DEFECT). NOTE :- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK FOLLOWING AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. :-
(A) THE IMPELLER IS CORRECTLY FITTED.
(B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING IN CORRECT DIRECTION.
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (I) AHU (1 & 2) CAPACITY - 9.3KW, & 0.75KW
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (II) VENTILATION (7.5KW) AND EXHAUST STARTERS (1.5KW)
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (III) OIL WATER SEPERATOR ,CAPACITY -
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (IV) BEARING OIL PUMP ,CAPACITY -0.5KW
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (V) FRESH WATER PUMP STARTER CAPACITY 1.5KW
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (VI) CENTRIFUGAL PUMP STARTER CAPACITY 0.75KW
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (VII) FUEL OIL TRANSFER PUMP CAPACITY 2.2 KW
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (VIII) STP STARTER PANEL
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (IX) OIL WATER SEPERATOR PUMP STARTER
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (X) GARBAGE MOTOR STARTER
OVERHAULING OF STARTERS (30003.11 - 30003.21) JOB INCLUDES REMOVAL OF STARTERS, CALIBRATION OF OVERLOAD MECHANISM AND IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED. (XI) FIREMAN AND SALVAGE MOTOR STARTER
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.02 - 30004.10) AS PER MAINTOP NO. MT 58200 AS FOLLOWS: - SR6 - CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (I) HP AIR COMPRESSOR (1 & 2),CAP.- 7.5KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (II) MOORING CAPSTAN STARTER , CAP.- 4KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (III) BOAT DAVIT STARTER , CAP. - 3.5KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (IV) BILGE PUMP STARTER, CAP.- 15KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (V) SALVAGE PUMP STARTER ,CAP.- 18.5KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (VI) AC MOTOR STARTER PANNEL ,CAP. - 37.5KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (VII) FIREMAINS STARTER PANEL CAP.- 37KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (VIII) HYDRAULIC PUMP MOTOR CAP.- 3.5KW
CARRY OUT SR AND NR ROUTINES ON STARTERS (30004.01 & 30004.11) AS PER MAINTOP NO. MT 58200 (IX) ANCHOR CAPSTAN STARTER , CAP. - 8KW
NR1 - CARRY OUT COMPLETE OVERHAULING OF STARTERS SUBJECT TO QC CHECKS. CARRY OUT TEST BED LOAD TRIAL FOR 4 HOURS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CARRY OUT NR ROUTINES ON GENERAL ALARM CONTROL PANEL AND COMBINED BELL AS PER MT 54284 AS FOLLOWS: - NR1 - CARRY OUT OVERHAULING OF GENERAL ALARM PANEL. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
CHECK ALL THE LIGHTS FOR CORRECT BRILLIANCY AND REPLACE IF DEFECTIVE
INTEGRATION AND PROVING OF AFDS ALARM SYSTEM WITH GENERAL ALARM SYSTEM. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
CARRY OUT NR ROUTINES ON FLOOD SENSOR AS PER MAINTOP NO. MT 54259 AS FOLLOWS: - NR1- REMOVE FLOOD ALARM UNIT TO SHOP FLOOR FOR REPAIRS, OVERHAUL/ RE-CONDITIONING/ CALIBRATION AS NECESSARY. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR2- REMOVE FLOOD SENSORS TO SHOP FLOOR FOR CALIBRATION. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CARRY OUT SR AND NR ROUTINES ON AUTO FIRE DETECTION SYSTEM AS PER MAINTOP NO. MT 54525 AS FOLLOWS: - SR1-CARRY OUT SERVICEABILITY CHECK OF ALL UNITS AND OVERALL CHECK-UP OF SYSTEM INCLUDING ACOS, PCBS, MANUAL CALL POINTS, DETECTORS & HOOTERS (WHERE APPLICABLE). PROJECT SPECIFIC DEFECT TO DOCKYARD AND UNDERTAKE REPAIR/ REPLACEMENT OF DEFECTIVE PART. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR3-REPAIR/ REPLACE DEFECTIVE CABLES AS NECESSARY. Sensor - 30, Manual Call Point - 6, Hooter-3
NR4-CARRY OUT VISUAL INSPECTION OF SHOCK MOUNTS. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
CARRY OUT SR AND NR ROUTINES ON MAIN BROADCAST & SRE SYSTEM AS PER MT 72113 AS FOLLOWS: - SR1-CARRY OUT COMPLETE EXAMINATION AND TEST OF ALL UNITS IN WORKSHOP. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
NR1-CARRY OUT OVERHAUL OF THE BROASTCAST AND SRE EQUIPMENT. CHECKS FOR OPTIMUM PERFORMANCE. PRESENT SYSTEM FOR HATS AND SATS AS PER THE STANDARDS OF WATT. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CARRY OUT NR AND MR ROUTINES ON AUTO TELEPHONE EXCHANGE AS PER MT 72306 AS FOLLOWS: - NR1-CARRY OUT OVERHAULING OF ALL PCBS/ MODULES FITTED INSIDE UNIT.STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
PROVING OF TELEPHONES LINES AT ALL LOCATIONS AS PER TELEPHONE DIRECTORY. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
MR1-RENEW ALL SHOCK/ VIBRATION MOUNTINGS. STW AND TRIAL TO BE CARRIED OUT.
CARRY OUT SR ROUTINES ON NAVIGATION LIGHT CONTROL PANEL AS PER MT 55000 AS FOLLOWS: - SR1-OVERHAUL NAVIGATIONAL LIGHTS, CONTROL PANELS, CHECK ALL THE SWITCHES AND REPLACE DEFECTIVE SWITCHES.
SR2-CHECK THE SUPPLY CABLES OF SIGNALING PROJECTORS, IF PERISHED RENEW/ REWIRE.
SR3-CHECK BELL CIRCUITS AND ALL THE LIGHTS FOR CORRECT BRILLIANCY.
CARRY OUT SR, NR AND MR ROUTINES ON COOKING RANGE WITH CONTROL PANEL AS PER MT 57101 AS FOLLOWS: - NR2-OVERHAUL, TEST AND RESET ALL SAFETY MECHANISM.
SR1-OVERHAUL THE EQUIPMENT (30027.03 - 30027.07) COMPLETELY AND DO AS MENTIONED BELOW:-
(A) CHANGE THE ELEMENT IF DEFECTIVE.
(B) RENEW THE INTERNAL WIRING IF PERISHED.
(C) CHECK THE ROTARY SWITCHES, CHANGE WITH NEW ONE IF REQUIRED.
(D) CALIBRATE TEMPERATURE SENSORS AND TEMPERATURE GAUGES IF FITTED.
(E) CHECK TEMPERATURE CUT-OUT OF WATER HEATERS FOR SATISFACTORY OPERATION AND ADJUST AS REQUIRED.
MR1-OVERHAUL ALL THE EQUIPMENTS.
MR2-RENEW ALL MOUNTINGS.
CARRY OUT COMPLETE INSPECTION OF ELECTRICALLY OPERATED RANGES, BOILERS, OVENS, GDU, IDLI MACHINE, ATTA KNITTING MACHINE AND REFRIGENERATOR ETC. FOR PROPER OPERATION.
CARRY OUT MR ROUTINES ON ACOS/HCOS AS PER MAINTOP NO. MT 53300 AS FOLLOWS: - NR1-TEST CHANGE OVER SWITCH OPERATION. REDUCE THE NORMAL SUPPLY VOLTAGE BETWEEN 75 % TO 80%, SWITCH SHOULD CHANGE TO ALTERNATIVE, INCREASE SUPPLY BETWEEN 90% TO 95%, THEN SWITCH SHOULD REVERT TO NORMAL. OBTAIN DOCKYARD ASSISTANCE IF REQUIRED.
MR1-RENEW ALL SHOCK/ VIBRATION MOUNTINGS.
MR2-CARRY OUT INSPECTION AND OVERHAULING OF CONTRACTOR PANEL.
CHECK AND CALIBRATE THE DWELL TIME OF ACOS.
ELECTRICAL - PART II
EXCESSIVE NOISE OBSERVED AND DRAWING HIGH CURRENT DURING OPERATION FROM EXHAUST MOTOR AND SUPPLY BLOWER MOTOR OF FER . OVERHAULING TO BE CARRIED OUT OF BOTH MOTORS (QTY- 02). STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
EXCESSIVE NOISE AND INTERMIDIATE TRIPPING OBSERVED IN EXHAUST AND SUPPLY BLOWER OF AER REMOVE AND OVERHAULING OF THE SAME QTY-02. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
SPM READING OF EXHAUST BLOWERS OF WATER JET, FER , CAPTAIN BATHROOM EXHAUST MOTOR OBSERVED IN YELLOW ZONE. SUSPECT BEARING FAULTY/DAMAGED. RENEWAL OF BEARING AND OVERHAULING OF MOTOR TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
SPM READING FOR AC SEA WATER PUMP MOTOR OBESERVED IN YELLOW ZONE WHILE IN NORMAL OPERATIONAL. SUSPECT BEARING DAMEGED/FAULTY . RENEWAL OF BEARING AND OVERHAULING OF MOTOR TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
SPM READING OF NONDRIVEN END OF MOORING CAPSTAN MOTOR OBSERVED IN YELLOW ZONE .SUSPECT BEARING DAMAGED. RENEWAL OF BEARING AND OVERHAULING OF MOTOR TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
OVERHAULING OF STARTER PANEL OF RO PLANT , INTERNAL WIRING AND TERMINAL BLOCK BROKEN . REWIRING OF STARTER AND REPLACEMENT OF TERMINAL BLOCK TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT
CALIBRATION OF STP CONTROL PANEL METERS. (A) AMP METER - 01 (B) VOLTMETER - 01 IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
FOT STARTER FREQUENTLY GETTING OVER TRIP WHILE IN OPERATION ,SUSPECT STARTER PCB AND MPU MALFUNCTIONING . OVERHAULING OF STARTER TO BE CARRIED OUT. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
HP AIR COMPRESSOR STARTER FREQUENTLY TRIP DURING OPERATION ,TRIP INDICATION NOT SHOWING IN MPU LED ,OVERHAULING TO BE CARRIED OUT . IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CALIBRATION /SERVICEABILITY CHECKS OF FOLLOWING STARTER . THE FOLLOWING OPERATION TO BE CARRIED OUT VIEW SUB OPTIMAL AND INTERMIDIATE TRIPPING OBSERVED. (A)MOORING CAPSTAN (B) BOAT DAVIT (C) FRESH WATER PUMP 1&2 (D) DIRTY OIL PUMP (E) FUEL OIL TRANSFER PUMP 1&2 (EACH). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
GENERAL ALARM SYSTEM NOT WORKING AT MULTIPLE PLACES. SUSPECT COMBINED BELL AND LAMP UNIT TO BE REPLACE OR REPAIRE .
SERVICEABILITY CHECKS OF FLOOD SENSOR TO BE CARRIED OUT (QTY-34). IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
REWIRING OF FOLLOWING FLOOD SENSOR JUNCTION BOX (A) AER (B) FER (C) BOSUN STORE (D) PUMP ROOM (E) WJ COMPARTMENT (F ) BAGGAGE STORE (H) GER.
JUNCTION BOX OF FLOOD ALARM PERSHIED/ CORRODED AT VARIOUS PLACES, JUNCTION BOX TO BE REPLACE AND FITMENT. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
CONTROL PANEL SWITCHES, INDICATION LAMP AND OTHER COMPONENTS MALFUNCTIONING. OVERHAULING OF CONTROL PANEL, CHECK ALL SWITCHES AND INDICATION LAMP BRILLENCY, REPLACE DEFECTIVE SWITCHES AND INDICATION LAMP. REMOVE THE OLD WIRING AND RENEW THE COMPLETE INTERNAL WIRING AND PLACE PRINTED FERUL MARKING. STW AND TRIAL TO BE CARRIED OUT.
PANEL CONTACTORS AND OVER LOAD RELAYS MALFUNCTIONING. PROCURE AND REPLACE MAIN CONTACTORS AND OVER LOAD RELAYS. STW AND TRIAL TO BE CARRIED OUT.
CONTACTORS TERMINAL DAMAGED. RENEWAL OF DAMAGED TERMINAL CONNECTORS.
INDICATION AND BUZZER NOT WORKING. PROCURE AND REPLACE INDICATION AND BUZZER AND RENEW DEFECTIVE COMPONENTS. STW AND TRIAL TO BE CARRIED OUT.
MARKING OF ALL COMPONENTS FITTED INSIDE AND OUTSIDE WITH METTALIC ENGRAVED ON PANEL.
AUXILARY CONTACTORS WITH RELAYS ARE NOT WORKING. PROCURE AND REPLACE THE AUXILARY CONACTORS WITH RELAY. STW AND TRIAL TO BE CARRIED OUT.
EAPL NOT WORKING. PROCURE AND REPLACE THE TIMERS MAKE EAPL. STW AND TRIAL TO BE CARRIED OUT.
TEMPERATURE RELAYS NOT WORKING. PROCURE AND REPLACE WINDING TEMPERATURE RELAY. STW AND TRIAL TO BE CARRIED OUT.
CONTROAL TRANSFORMER MALFUNCTIONING. PROCURE AND AND REPLACE THE CONTROL TRANSFORMER. STW AND TRIAL TO BE CARRIED OUT.
MCCB 40A MALFUNCTIONING. PROCURE AND REPLACE MCCB 40 A. STW AND TRIAL TO BE CARRIED OUT.
OVER AND UNDER VOLATAGE RELAYS NOT HOLDING. SUSPECT MALFUNCTIONING. PROCURE AND REPLACE OVER AND UNDER VOLTAGE RELAY ALVD2 MAKE MIMILEC. STW AND TRIAL TO BE CARRIED OUT.
FUSE IN ASSEMBLY BURN OUT DUE TO INCOMING SUPPLY. PROCURE AND FITMENT OF FUSE ASSEMBELY WITH FUSE HOLDER FOR MAIN INCOMING SUPPLY.
PANEL 100A BREAKER MALFUNCTIONING. PROCURE AND REPLACE 100 A BREAKER. STW AND TRIAL TO BE CARRIED OUT
OFC UNIT MALFUNCTIONING. PROCURE AND REPLACE OFC UNIT. STW AND TRIAL TO BE CARRIED OUT.
CAPACITY TESTING OF FOLLOWING BATTERIES TO BE CARRIED OUT (A) 12V 200 AH (QTY-15) (B) 12V 75AH (QTY-08) (C) 12V 42AH (QTY-21) (D) 12V 28AH (QTY-03) (E) 12V 14AH (QTY-03) (F) 12V 07AH (QTY-05) IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
MANUFACTURE OF METTALIC BOX DUE TO WEAR AND TEAR AT VARIOUS LOCATIONS AS PER SAMPLE
MOTOR MONITORING SYSTEM MALFUNCTIONING. REMOVAL RE-FITMENT AND PROVING OF MOTOR MONITORING SYSTEM SENSORS POST OVERHAULING OF CORRESPONDING MOTORS . IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
STARTING AND STOPING PUSH BUTTON AND INDICATIONS OF AUXILIARIES MACHINERY FROM MCR NOT WORKING FOR ALL MOTORS. OVERHAULING OF REMOTE STARTING STOPING PANEL TO BE CARRIED OUT. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
REPAIRE AND ANNUAL CALIBRATION OF FOLLOWING METERS OF POWER DISTRIBUTION BOARDS TO BE CARRIED OUT . :- (A) VOLT METERS 0-300V (QTY-03) (B) FREQUENCY METERS (QTY-03) (C) AMMETERS 0-50A (QTY-03) IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
OVERHAULING OF DC SWITCH BOARD VIEW INTERMITTENT EXCESSIVE NOISE AND FAULT ALARM SHOWING IN DC SWITCH BOARD PANEL . OVERHAULING TO BE CARRIED OUT.
SHOCK MOUNT OF ALL ELECTRICAL EQUIPMENTS TO BE REPLACE.
MANUFACTURING AND FITMENT OF 4" CABLE TRAY (30097.01 - 30097.08) WITH SECURING CLAMPS TO SECURE PASSING CABLES AT FOLLOWING LOCATIONS: - (A) BOATSWAIN STORE
(B) MAIN MAST
(C) WATER JET COMPARTMENT
(D) FER AT VARIOUS LOCATION
(E) PUMP ROOM
(F) BOAT DAVIT
(G) MAIN LOBY AND STP LOBY
STARTER PANEL MALFUNCTIONING. OVERHAULING OF TEST PANEL STARTER.STARTER PANEL CORODED STARTER PANEL BODY TO BE REPLACED.
BUNK LIGHTS AND FAN SWITCHES NOT WORKING,REPLACE WITH NEW BUNKS LIGHTS AND FAN ALONG WITH NEW WIRING.
WATER TIGHT SWITCH MALFUNCTIONING AT DIFFERENT LOCATIONS ON UPPER DECK. REPLACE ALL SWITCHES.
UNUSED WIRE TO BE REMOVE AT THROUGHT OUT THE SHIP AND REWIRING TO BE CARRIED OUT IF REQUIRED.
SECURING OF WIRING AT VARIOUS PLACES (A) FER (B) AER (C) STP LOBBY (D) PROSION STORE (E ) MAIN LOBBY (F) BRIDGE ( G) PUMP ROOM (H) BOSUN STORE (J) MCR (K) SS & JS MESS
PACKING OF CABLE GLAND SOP STAND AT BRIDGE TOP TO BRIDGE WITH LAYING OF CABLE FROM SOP TO OPERATION PANEL IN BRIDGE. IF ANY CABLE DAMAGED, LAYING OF NEW CABLE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
JUNCTION BOX AT DIFFERENT LOCATIONS MALFUNCTIONING AND DAMAGED. REPLACE THE JUNCTION BOX
CARRY OUT THOROUGH CLEANING OF THE SYSTEM AFTER REMOVING MODULES/PCBS. CARRY OUT OPERATIONAL CHECKS. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
ANTEENA OF GPS NOT RECEIVING ANY SATELLETIE RECEPTION, SUSPECT BOTH GPS NOT WORKING, REPLACE THE ANTEENA ALONG WITH CABLE IF NECESSERY. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
BUFFER UNIT OF GPS NOT WORKING, SUSPECT BUFFER UNIT MALFUNCTIONING, REPLACE THE BUFFER UNIT. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
REPAIR AND SERVICIABLITY CHECKS OF 30 IN NO MICS OF INTERCOM TO BE CARRIED OUT. STW AND TRIAL TO BE CARRIED OUT.
REPAIR AND REWIRING OF AUTO TELEPHONE EXCHANGE TO RESPECTIVE COMPARTMENT. IF FOUND UNSAT, REPLACE DEFECTIVE COMPONENTS WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT, NECESSARY CERTIFICATE TO BE ISSUED IF REQUIRED.
TELEPHONE LINE AT VARIOUS LOCATIONS NOT WORKING. SUSPECT CONNECTION POINT DEFECTIVE. FITMENT OF TELEPHONE CONNECTION POINTS.AT VARIOUS LOCATIONS
CARRY OUT OVERHAUL OF THE BROADCAST AND SRE EQUIPMENT. CHECK FOR OPTIMUM PERFORMANCE.
NOISE OBSERVED FROM MAIN BROADCAST SPEAKER. SERVICEABILITY CHECKS OF AMPLIFIER AND PCB OF MAIN BROADCAST SYSTEM. IF FOUND UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
INSPECT ALL MB & SRE SPEAKER, IF DAMAGE/UNSAT, REPLACE ALL WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
SOFTWARE MALFUNCTIONING. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
RECORDING ISSUE. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
POE SWITCH MALFUNCTIONING. IF FOUND UNSAT, REPLACE WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
SERVICEABLITY CHECKS OF PSU AND CCTV IF FOUND UNSAT, REPLACE DEFECTIVE COMPONENTS WITH NEW ONE. STW AND TRIAL TO BE CARRIED OUT.
CCTV CAMERA AT VARIOUS LOCATIONS NOT WORKING. REPLACE CAMERA ALONG WITH CABLE IF NECESSERY.
CARRY OUT COMPLETE OVERHAULING OF MB/ SRE RACK REPLACE THE DEFECTIVE AMPLIFER.
PROCURE AND REPLACE HORN TYPE SPEAKER (8 WATT) AT VARIOUS LOCATION
PROCURE AND REPLACE CABIN TYPE SPEAKER (4 WATT) AT VARIOUS LOCATION
PROCURE AND REPLACE MIC CONNECTION BOXES AT VARIOUS LOCATIONS
PROCURE AND REPLACE MICROPHONE WITH STOWAGE HOOK 7 PIN CONNECTOR
REPLACEMENT OF DEFECTIVE MUSIC PLAYER WITH NEW ONE.
PROVING OF THE SYSTEM WITH ALL THE LOCATION MACHINERY, ACTION ,CONNING AND MAIN BROAD CAST.
PROCURE AND REPLACE MIC AT RCS PANEL AND COMPILOT
REPLACEMENT OF TOGGLE SWITCHES USED FOR WEATHER DECK LIGHTS, FLOOD LIGHTS AND WINDOW WIPER.
PROCURE AND REPLACE DEFECTIVE NAVIGATIONAL LIGHT FITTINGS WITH LAMPS DOUBLE TIER.
PROCURE AND REPLACE DEFECTIVE NAVIGATIONAL LIGHT FITTINGS WITH LAMPS SINGLE TIER.
PROCURE AND REPLACE LED FLOOD LIGHT
MORSE KEY LIGHT NOT WORKING, SUSPECT SIGNAL GENERATOR OF MORSE KEY LIGHT MALFUNCTIONING AND STBD BRIDGE WING CONNECTION BOX CORRODED. REPLACE AND REPAIR TO BE CARRIED OUT.
HOT ELEMENT FREQUENTLY SHOWING LOW INSULATION SUSPECT CONNECTION AND INSULATION PERISHED. REWIRING TO BE CARRIED OUT .
OVERHAUL, TEST AND RESET ALL SAFETY MACHANISM. RENEW ALL MOUNTINGS
LOW INSULATION SHOWING IN GALLEY OVEN, CHECK WIRING AND ELEMENTS OF OVEN AND REPLACE AS REQURIED.
AUDIO VISUAL ALARM OF GALLEY NOT WORKING REPLACE /REPAIR OF L INDICATION ALARM PANEL IN DCHQ AND INFRONT OF GALLEY.
CARRY OUT OVERHAULING OF CONTROL PANEL. OVERHAULING JOB ENTAILS FOLLOWINGS:-
(A) PROCURE AND RENEWAL OF BEARINGS. HAND OVER OLD UNIT TO SS
(B) PROCURE AND REPLACEMENT OF CARBON BRUSH ASSEMBLY.
(C) PROCURE AND REPLACE EMERGENCY STOP PUSH BUTTON AND INDICATION LAMPS IN LOCAL OPERATING PANEL
(D) RENEWAL OF REMOTE CONTROL PANEL WITH WATER TIGHT PANEL
(E) PROCURE AND REPLACE EM BREAK ASSEMBLY
(F) REPLACEMENT OF ROTARY ON/OFF SWITCH
(G) OVERHAULING OF CAPSTAN STARTER PANEL , REPLACEMENT OF INTERNAL WIRING, REPLACEMENT OF AUXILARY CONTACORS, PCB'S , OVER LOAD RELAYS, AND SAFETY RELAYS.
(H) POST OVERHAULING LOAD TRIALS TO BE PROVED TO SS.
STARTER PANEL BODY OF ANCHOR CAPSTAN PERISHED AND INTERMITTEN TRIPPING OF PANEL OBSERVED WHILE NORMAL OPERATRIONAL LEADING TO ACTUAL OF OVERLOAD RELAYS INSIDE STARTER. OVERHAULING OF STARTER TO BE CARRIED OUT.
OVERHAULING OF TRANSRECTIFIER. E&R REVEALS INTERNAL CABLE PERISHED AND MAIN SUPPLY FUSEBASE REPLACE . DEFECT TO BE RECTIFIED .
BOAT DAVIT HOIST MOTOR UPPER AND LOWER CUT OUT BREKE-CAM MACHANISM OPERATING FREQUENTLY RESULTING IN INTERMITTEN SLIPPING OF BRAKES. OVERHAULING OF BRAKE MACHANISM TO BE CARRIED OUT. BOAT DAVIT STARTER CONTROL PANEL AND MOTOR MAKE : M/S AIM ENGG INDUSTRIES
BOAT DAVIT CONTROL PANEL FREQUENTLY TRIPPING WHILE SLEW IN OR OUT OPERATION FROM FER BOAT DAVIT CONTROL PANEL. OVERHAULING OF CONTROL PANEL TO BE CARRIED OUT . BOAT DAVIT STARTER CONTROL PANEL AND MOTOR MAKE : M/S AIM ENGG INDUSTRIES
REORIENTATION OF ALL THREE STATER PANEL (PORT, STBD AND CENTER) OF DIESEL ALTERNATOR WITH SUITABLE POSITIONS. STW AND TRIALS TO BE UNDER TAKEN. IF REQUIRED REMOVAL OF OLD CABLES AND LAYING DOWN OF NEW CABLES AS PER SAMPLE.
(A) EXISTING CABLE TIES TO BE REMOVED FROM LOCATION IDENTIFIED BY SS. (B) CABLES TO BE SECURED IN CABLE TRAY POST FITMENT / REMOVAL OF VARIOUS ABER/As & As EQUIPMENT CABLING. (C) METALLIC STRIPS (BRASS) WITH FIXTURE HOLES TO BE PLACED TO SECURE THE CABLES IN THE CABLE TRAY AS PER EXTANT POLICIES
(A) TRANSPARENT ACRYLIC BOARD AS PER SWITCHBOARD DESIGN TO BE CUT POST TAKING MEASUREMENT IN CONSULTATION WITH SS. (B) ACRYLIC BOARD WITH HINGED BREAKER COVERS ALONG WITH LOCKING ARRANGEMENT TO BE MANUFACTURED. (C) NECESSARY FIXTURES TO BE ADDED ON THE SWITCHBOARD FOR FITMENT OF ACRYLIC BOARD. (D) ERGONOMICS OF THE DESIGN TO BE CLEARED FROM SS AND END USERS.
REPLACEMENT OF COMPILOT MANUAL CHANGEOVER LEVER IAW INWT OBSERVATION. SCOPE OF WORK INVLOVES INSTALLATION OF THE MANUAL CHANGEOVER LEVER, LAYING OF CABLES OF CABLES. NECESSARY ASSISTANCE FOR STW / SEA TRIALS OF AUTOPILOT AND MANUAL STEERING TO BE PROVIDED.
(A) FITMENT OF SINGLE PHASE UNIT IN EXISTING SHORE SUPPLY BOX. ITEM WOULD BE SUPPLIED BY NAVY. (B) CONNECTION AND INTEGRATION OF THE SINGLE PHASING PROTECTION WITH EXISTING SHORE SUPPLY BOX. INSTALLATION MATERIAL (CABLES ETC) TO BE CATERED BY SHIPYARD. (C) STW AND TRIALS OF THE SINGLE PHASING PROTECTION.
ELECTRICAL - PART III
BOARD PROCEEDING APPROVED. NOTE: - NEW EQUIPMENT FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN FITMENT OF SRCG GUN AT BRIDGE TOP
SURFACE PREPARATION FOR FITMENT OF GUN AT BRIDGE TOP INCLUDING FABRICATION OF MOUNTING ASSEMBLY.
FITMENT OF CONTROL UNIT INSIDE BRIDGE INCLUDING DECK PREPARATION, FABRICATION OF MOUNTING FRAME AND WELDING OF FRAME.
CABLING FROM BRIDGE CONTROL UNIT TO BRIDGE TOP SRCG GUN (PORT & STBD).
STW OF GUN AND PROVING OF TRIALS WITH AGENCIES.
COMMISSIONING OF THE SYSTEM
TRAINING OF SHIPS STAFF
MINOR As & AS APPROVED VIDE HQSNC LETTER EE/3090/41 DATED 07 JUN 23. NOTE:- REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN FITMENT OF LSU IN SWBD
REMOVAL OF EXISTING LSU FROM SWBD.
FITMENT AND INSTALLATION OF NEW LSU.
REMOVAL OF EXISTING CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
STW OF SYSTEM AND PROVING OF TRIALS WITH AGENCIES.
LOAD TRIALS WITH AGENCIES AND PROVING OF UNIT.
ABER APPROVED VIDE HQSNC LETTER EE/1320/05/ABER DATED 06 JUL 23 NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING TRANSRECTIFIERS FROM FER COMPARTMENT.
FITMENT AND INSTALLATION OF NEW TRANSRECTIFIERS.
REMOVAL OF EXISTING CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
IIs & STW and LOAD TRIALS WITH AGENCIES AND PROVING OF UNIT
BOARD PROCEEDING APPROVED VIDE HQSNC LETTER EE/3090/41 DATED 08 AUG 23. NOTE: - FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING GYRO STD 22 FROM BRIDGE.
FITMENT AND INSTALLATION OF GYRO STD 22 NXM.
LAYOUT OF POWER SUPPLY CABLES AND WIRING
ROUTING OF NEW CABLES.
COMMISSIONING OF THE SYSTEM
STW OF GYRO AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
BPs APPROVED VIDE HQSNC LETTER EE/3090/41 DATED 09 AUG 23. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING NAVIGATION LIGHT CONTROL PANEL..
FITMENT AND INSTALLATION OF NEW NLCP
REMOVAL OF EXISTING CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
STW OF SYSTEM AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
BOARD PROCEEDING APPROVED VIDE HQSNC LETTER EE/3090/41 DATED-19 SEP 23. NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING EM LOG V2.
FITMENT AND INSTALLATION OF NEW EM LOG V3 IN BRIDGE.
FITMENT AND INSTALLATION OF NEW REPEATER IN BRIDGE AND MCR.
CABLING FROM RE-TRANSMISSION UNIT TO NAVAIDS SYSTEM.
CABLING FROM REPEATER DISTRIBUTION UNIT TO REPEATERS.
LAYOUT OF NEW CABLE FROM BRIDGE TO EM LOG SENSOR.
COMMISSIONING OF THE SYSTEM
STW OF LOG AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
BPs APPROVED VIDE HQSNC LETTER EE/3090/34 DATED 28 FEB 23 NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN Removal / Degutting of existing PAE 3060 rack with assembely.
Removal of PAE 3060 antenna
Removal of old cable from PAE 3060 antenna to PAE Rack and RCU
SDR TAC antenna at Main Mast
Surface Prepration for fitment of antenna at Main Mast
SDR TAC rack with assembely in Radio Room.
Fitment of RCU for SDR TAC in Bridge.
Cabling from Main Mast to Radio Room & Bridge. (Cable will be provided from ship)
Securing of cables with clamp through chanel tray only.
Post Cabling gland packing to be carried out.
COMMISSIONING OF THE SYSTEM
STW OF SDR TAC AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING AUTO CHANGE OVER SWITCH FROM BRIDGE AND GER COMPARTMENT.
FITMENT AND INSTALLATION OF NEW AUTO CHANGE OVER SWITCH.
REMOVAL OF EXISTING CABLE FROM POWER PANEL TO BRIDGE AND SWITCHBOARD TO GER COMPARTMENT.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
IIs & STW and LOAD TRIALS WITH AGENCIES AND PROVING OF SYSTEM
TRAINING OF SHIPS STAFF
NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN Removal / Degutting of existing MSS MK I rack with assembly.
Removal of MSS MK I antenna
Removal of old cable from MSS MK I antenna to PAE Rack and RCU
MSS MK I antenna at Main Mast
Surface Prepration for fitment of antenna at Main Mast
MSS MK I rack with assembely in Radio Room.
Fitment of RCU for MSS MK II in Bridge.
Cabling from Main Mast to Radio Room & Bridge. (Cable will be provided from ship)
Securing of cables with clamp through chanel tray only.
Post Cabling gland packing to be carried out.
COMMISSIONING OF THE SYSTEM
STW OF MSS MK II AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN REMOVAL OF EXISTING GALLEY EQUIPMENT FROM SHIPS GALLEY.
FITMENT AND INSTALLATION OF NEW GALLEY EQUIPMENTS (GALLEY RANGE AND GARBAGE DISPOSAL UNIT).
REMOVAL OF EXISTING CABLE FROM POWER PANEL TO SHIPS GALLEY AND SWITCHBOARD TO SHIPS GALLEY
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
IIs & STW WITH PROVING OF SYSTEM WITH AGENCIES
NOTE: - FITMENT/ UPGRADATION OF SOFTWARE, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT/BoM SUPPLY: OFFLOADED FIRM UPGRADATION OF EXISTING VISION MASTER.
FITMENT AND INSTALLATION OF NEW NAV RADAR MFC IN BRIDGE AS PER DIGITAL NAVIGATION POLICY
REMOVAL OF EXISTING/UPGRADE 01 RADAR WITH LAYING OF NEW CABLE IN BRIDGE .
FITMENT OF 01 NEW RADAR WITH ECDIS 4000 UPGRADED TO ECDIS 4100 IN BRIDGE AS PER DIGITAL NAVIGATION POLICY
LAYOUT OF CABLE FROM BRIDGE TO BRIDGE TOP AND MAST FOR 02 ANTENNA
REMOVAL OF EXISTING RF CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
STW OF NAV RADAR WITH MFC & ECDIS AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
BOARD PROCEEDING APPROVED VIDE HQSNC LETER EE/3090/34 DATED 20 JUN 24. NOTE: - ADDITIONAL FITTMENT AND INTEGRATION WITH OLD EQUIPMENT , FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN ADDITIONAL FITTMENT AND INTEGRATION WITH OLD SYSTEM.
FITMENT AND INSTALLATION OF SENSORS.
LAYOUT OF POWER SUPPLY CABLES AND WIRING
ROUTING OF NEW CABLES.
PROVING OF SYSTEM WITH NEW SENSORS FITMENT
COMMISSIONING OF THE SYSTEM
INTEGRATION & STW WITH EXISTING SYSTEM AND PROVING OF SYSTEM
NOTE: - ADDITIONAL FITTMENT AND INTEGRATION WITH OLD EQUIPMENT , FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN ADDITIONAL FITTMENT AND INTEGRATION WITH OLD SYSTEM.
FITMENT AND INSTALLATION OF SENSORS.
LAYOUT OF POWER SUPPLY CABLES AND WIRING
ROUTING OF NEW CABLES.
PROVING OF SYSTEM WITH NEW SENSORS FITTMENT
COMMISSIONING OF THE SYSTEM
INTEGRATION & STW WITH EXISTING S/M AND PROVING OF SYSTEM
BOARD PROCEEDING APPROVED VIDE HQSNC LETTER -EE/3090/34 DATED 13 JUN 24. NOTE: - REMOVAL OF OLD EQUIPMENT , FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN. REMOVAL OF EXISTING EK 896.
FITMENT AND INSTALLATION OF NEW HD VLF HF RECEIVER IN RADIO ROOM.
REMOVAL OF EXISTING 02 ANTENNA FROM BRIDGE TOP AND MAST.
FITMENT OF 02 NEW ANTENNA ON BRIDGE TOP AND MAST.
LAYOUT OF RF FEEDER CABLE FROM BRIDGE TO BRIDGE TOP AND MAST FOR 02 ANTENNA WITH HD VLF HF RECEIVER.
REMOVAL OF EXISTING RF CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
STW OF HD VLF HF AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN. REMOVAL OF EXISTING INMARSAT-C.
FITMENT AND INSTALLATION OF NEW INMARSAT-C IN RADIO ROOM.
REMOVAL OF EXISTING ANTENNA ON MAST.
FITMENT OF NEW INMARSAT-C ANTENNA ON MAST.
REMOVAL OF EXISTING RF FEEDER CABLE.
LAYOUT OF NEW R CABLE FROM RADIO ROOM TO MAST WITH ANTENNA.
COMMISSIONING OF THE SYSTEM
STW OF INMARSAT C AND PROVING OF TRIALS WITH AGENCIES.
NOTE: - REMOVAL OF OLD EQUIPMENT, FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. REMOVAL OF EXISTING MB SRE WITH INTERCOME.
FITMENT AND INSTALLATION OF NEW MB SRE WITH INTERCOME IN BRIDGE.
REMOVAL OF EXISTING CONECTIONS, JB, SPEAKERS, AMPLIFIERS, MIKE CONNECTION BOX AND CABLES AT VARIOUS LOCATIONS.
FITMENT OF NEW JB, SPEAKERS, AMPLIFIERS, MIKE CONNECTION BOX AND CABLES. AT VARIOUS LOCATIONS.
REMOVAL OF EXISTING CABLE.
LAYOUT OF NEW CABLE FROM BRIDGE TO VAIOUS LOCATIONS.
COMMISSIONING OF THE SYSTEM
STW OF MB SRE WITH INTERCOME AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
NOTE: - REMOVAL OF OLD EQUIPMENT , FITMENT, INSTALLATION, STW, COMMISSIONING AND TRIALS/PROVING OF NEW EQUIPMENT TO BE UNDERTAKEN BY SHIPYARD. EQUIPMENT SUPPLY: IN. REMOVAL OF DGPS.
FITMENT AND INSTALLATION OF NEW DGPS IN BRIDGE .
FITMENT OF NEW BUFFER UNIT IN BRIDGE
LAYOUT OF CABLE FROM BRIDGE TO BRIDGE TOP FOR 02 ANTENNA
REMOVAL OF EXISTING CABLE.
RE-ROUTING OF CABLES.
COMMISSIONING OF THE SYSTEM
STW OF DGPS AND PROVING OF TRIALS WITH AGENCIES.
TRAINING OF SHIPS STAFF
FITMENT OF ADDITIONAL AEL IN GER, PROVISION STORE, SS & JS MESS PASSAGEWAY. AEL WOULD BE SUPPLIED BY IN. SCOPE OF WORK INVOLVES: -
(A) LOCATION MARKING OF NEW AEL
(B) MANUFACTURING OF FOUNDATION AND FITMENT OF AEL ON BULKHEAD ALONG WITH FOUNDATION
(C) CABLING AND CONNECTION TO BE UNDERTAKEN. REQUIRED CABLE TO BE CATERED BY SHIPYARD
(D) GLAND PACKING / HOSE TEST TO BE CARRIED OUT
(E) TRIALS AND BACK UP PROVING OF AEL
FITMENT OF ADDITIONAL LED LIGHTS IN RADIO ROOM (02 NOS) AND GER (08 NOS). LED LIGHTS WOULD BE SUPPLIED BY IN. SCOPE OF WORK INVOLVES: -
(A) LOCATION MARKING OF NEW AEL
(B) MANUFACTURING OF FOUNDATION AND FITMENT OF LED LIGHTS ON BULKHEAD ALONG WITH FOUNDATION
(C) CABLING AND CONNECTION TO BE UNDERTAKEN. REQUIRED CABLE TO BE CATERED BY SHIPYARD
(D) GLAND PACKING / HOSE TEST TO BE CARRIED OUT
(E) TRIALS AND STW TO BE UNDERTAKEN
INSTALLATION OF IFF TRANSPONDER TO BE CARRIED OUT AS PART OF DIGITAL NAVIGATION POLICY IAW APPROVED BPs. SCOPE OF WORK INVOLVES: - (A) FITMENT OF TRANSPONDER (B) LAYING OF CABLE, STW AND TRIALS. NECESSARY CERTIFICATE TO BE ISSUED, IF APPLICABLE. INSTALLATION/ CONNECTORISATION MATERIAL TO BE CATERED BY SHIPYARD.
Description of Work / Item(s)
Amount
LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
Sacrifical Anodes MK-X
Anodes for Seachest
Epoxy red oxide primer - 450 SQM
Advanced internal finish coating
V1 tank Gasket
V2 tank gasket
Process Grounding Target
(Needle valve-1/4"MNPT,Brass)
M 16X 50 Nut Bolt ss nut bolt with double washer
M 16X 65 Nut Bolt ss nut bolt with double washer
Gasket, Neoprene, for 1/2"-150# Flange
Gasket, Neoprene, for 1"-150# Flange
Gasket, Neoprene, for 1-1/2"-150# Flange
Gasket, Neoprene, for 2"-150# Flange
Gasket, Neoprene, for 3"-150# Flange
Gasket, Neoprene, for 4"-150# Flange
Sigma 280 Primer 75 micron
Sigma 630 Grey 60 micron
Sigma 300 Black 60 micron
Rebuild Kit (Mechanical Seal, Bearing, Bushing, and soft parts)
Axial Cutter
Radial Cutter
Impeller Washer
Cutter Ring, 17-4PH
Shaft Key
5/8" Coupling Flange(Pump Side)
7/8" Coupling Flange(Motor Side)
Flexible Coupling, Split Sleeve
PVC Fitting set
OBD Pump
Blowers
Ejector Assembly
Pressure Regulator
Pressue Indicator
Solenoid Valve Size: 1/4"
Flow control valve (FCV)Size: 1/2"
Float type level Switches
Process Grounding Target
MNO 32E 110 V
MNO 22E ,110V
AMMETER, ANALOGE, 0-100 ADC
VOLTMETER, ANALOGE, 0-150 VDC
PVC Fitting set
Rotor (15MBA)
Shaft Seal 30mm
Cover
O-ring
O-ring
O-ring
Sealing Ring Motor (15 MBA)
Ball Bearing (Motor 15 MBA)
Ball Bearing (Motor 15 MBA)
Key (15 MBA)
Plug 3/8” A4
End flange
Pressure Switch
Vacuum gauge
Rubber Elbow, ø50/ø60 w/Hose Clip
VD Valve, Piston Complete
Hose w/ball valve 700mm
Flexible Hose with end connection
Release Button
Level Sensor 100/180mm
ED Valve 230V sensitive, Complete
Accumulating Tank 150L w/blind flange
Pipe support 2" Clamp with nut bolt
Gasket (Rubber)
M 16X 50 Nut Bolt ss nut bolt with double washer
M 16X 65 Nut Bolt ss nut bolt with double washer
IMO Flanges (MS)
GWT control panel Local
Blower line Ball Valve
Chemical for Pipe cleaning
Seat & Cover, Comfort
Jets® 610 Floor Toilet
Solenoid Valve Size: 1/2"
Flow orifice 1"
Plate, Orifice, Titanium,For 1" Valve
BALL BEARING
SEAL 35X62X7
O-RING
O-RING
O-RING#24
O-RING#29
O-RING#32
SHAFT FOR OBD PUMP
BOLT IMPELLER RETAINING
SCREW 1/4", PAN HEAD, ISOPLAST
BOLTS, 5/16X2 1/4" 316 SS
WASHER, FLAT 5/16" 316
O-RING BOLT
ROD ALL THREAD, 1/2"X36" BRASS)
O-RING FOR DOOR (6MC
SEAL , MECHANICAL SET
OIL SEAL
MECHANICAL SEAL
GASKET
PLATE ELECTRIC BI-POLAR
PRIMARY ANODE
PRIMARY CATHODE
MECHANICAL SEAL ASSY
INDICATION LIGHT (RED-2, GREEN-2, WHITE-2)
SEAT COVER
Taper Roller Bearing
Oil Seal
Slipping Clutch cum Flexible Coupling
Circlip
Circlip
Ferodo Lining(Front)
Ferodo Lining(Back)
Rivet
Circlip
Circlip
Roller
Bearing
Bearing
Oil seal
Circlip
Spring washer
Bearing
Bearing
Bearing
Bearing
Bearing
Oil seal
Oil seal
Oil seal
Oil plug
Clutch
Clutch
Brake band (F)
Brake band (B)
Grease Nipple
CSK screw
Grub screw
Grub screw
Grub screw
Grub screw
Output Bush
Ring gear 87-8
Ring gear pin
Cylodiocal Disc 87-1
Disc spacer
ECC Free I
Roller 14 X 20
Spring washer 12.0
Ball Bearing SKF 6216
Ball Bearing SKF 6218
Snap Ring
Roller Bearing NJ 407
O Ring Dia 302 X 3
Roller Bearing 22213
Circlip 85 External
Oil Seal 90-130-13
Oil Seal 65-90-13
NWT Doors as per sample
Bearing
Circlip
Ball Bearing
Bearing
Circlip
Circlip
Bearing
Bearing
Bearing
Oil Seal
Oil Seal
Oil Seal
Oil Seal
Bearing
Circlip
Circlip
Retaining Ring
Bearing
Bearing
Oil Seal
Circlip
Bearing
Bearing
Bearing
Bearing
Bearing
Oil Seal
Oil Seal
Oil Seal
CSK screw
Oilplug (collaraded)
Circlip
Rope clamp
EFSWR as per sample
Limit Switch
Non Standard WT Hatches
Bonding Straps
Rubber sealing
Bi-metallic joint
Chair
Silicon Rubber beading
Revolving chair
Rubber beading as per sample
AHU 2 with all accessories as per BoM mentioned in BP
Diver replaceable ICCP System and accessories
Scuttles as per sample
ENGINEERING
O-RING
GASKET COPPER WASHER
GASKET FRAME END COVER
SEAL OIL
GASKET SHAFT END COVER
BEARING BALL
BEARING BALL W/SNAP RING
RING BEARING RETAINER
BUSHING CRANK PIN
VALVE SAFETY
GASKET AIR HEAD
VALVE FINGER
SPACER
GASKET SPACER
GASKET COPPER
GASKET FLANGE
SET RING
RING LOCK
GASKET AIR HEAD
ASSEMBLY SPACER / VALVE LOW PRESSURE
VALVE FINGER
SPACER
GASKET SPACER
SET RING
VALVE SAFETY
FILTER INLET COMPLETE
LOCK WASHER 5/8
CAP CRANK PIN
ROD CONNECTING
ASSEMBLY DISC / SHAFT
SPACER CRANK SHAFT BEARING
KEY WOODRUFF
TUBE ASSEMBLY BREATHER
TUBE ELBOW
CONNECTOR MALE
BUSHING REDUCING
BUSHING REDUCING
ASSEMBLY SPACER/VALVE HIGH PRESSURE
WASHER WAVE
CAPSCREW HEX HEAD
CYLINDER AIR 1.25"-HIGH PRESSURE
PISTON AIR COMPLETE
CYLINDER AIR LOW PRESSURE
PISTON AIR COMPLETE
PRIORITY VALVE
Fire Pump mounts
Salvage Pump mounts
M D Air Compressor mounts
DD Air Compressor mounts
Bilge Pump mounts
Driven Shaft
Driving Shaft
Driven Gear
Driving Gear
Bush Bearing
Mechenical Seal
Safety Vlave
Safety Valve Spring
Safety Valve Lock Nut
Safety Valve Screw
Coupling Key
Gear Key
Gasket for Front Cover
Gasket for Rear Cover
Gasket
Bearing
Mechanical seal
Spring for relieve valve
Flexible pipe with end connection & ready for installation suction side
Flexible pipe with end connection & ready for installation deliver side
Flexible Hose
VALVE SAFETY 1/2x600 PSIG
VALVE NEDLE 1/4
CONCENTRIC VALVE (INLET & DISCHARGE VV)
LIP SEAL
VALVE ASSEMBLY 50
GASKET AIR HEAD CENTER
GASKET AIR HEAD
WASHER COPPER 1/2"
GASKET CYLINDER FLANGE
RING LOCK
RING PISTON SET LP 5" DIA
VALVE COMPLETE 1-5/8"
GASKET AIR HEAD
GASKET AIR HEAD
RING PISTON SET 2"
O-RING 7/8x1-1/8
WASHER COPPER 7/8"
WASHER COPPER 3/8"
GASKET COVER CRANK CASE
O-RING 1/8"x1/4"x1/6" VITON
SEAL OIL VITON-DOUBLE LIP
GASKET COVER SHAFT END
BUSHING CRANK PIN
VALVE SAFETY 1/4x160 PSIG
WASHER COPPER 5/8"
GASKET MANIFOLD
Cover assy frame end
Cover shaft end
Tuneup kit
Gasket set
Inter cooler assy
Crank case
FILTER-INLET COMPLETE
HEAD AIR TOP AS&S
HEAD AIR ELBOW 5"
DOWN PIN FOR AIR HEAD
CAP SCREW-HEX HEAD 1/2"x1-1/4"
CYLINDER LP 5" 15T
PISTON PIN ASSEMBLY 5" LP
PIN PISTON
SCREW CAP HEX 1/2" x 2-3/4"
CYLINDER HP 2"
CYLINDER HP 3-1/2"
PISTON PIN ASSEMBLY 3"
PIN PISTON HP
VALVE PILOT
PIN THRUST ASSEMBLY
PIN THRUST UNLOADER
NUT HEX BELT WHEEL
WAHER SPRING 1-1/8"
WHEEL BELT REV. ROTATION-ENG.DRV
KEY WOODRUF
SCREW CAP HEX 3/8"x1" DRILLED HT
CAP CRANK PIN ASSEMBLY
ROD CONNECTING LP
ROD CONNECTING HP
SCREW CAP HEX 3/8"x7/8"
CRANK SHAFT ASSEMBLY+BRG+NUT+KEY
WASHER SPRING 1/4"
WASHER SPRING 1/4"
Impeller
Bush bearing
Paper gasket
Ball bearing
Mechanical seal
B.B. cap screw
Suction hose
Delivery hose
Pressure switch for Hydro. Tank
Coller Ring(Inner)
Coller Ring(outer)
Impeller
Bush bearing
Paper gasket
Ball bearing
Mechanical seal
B.B. cap screw
Suction hose
Delivery hose
Pressure switch for Hydro. Tank
Coller Ring(Inner)
Coller Ring(outer)
Impeller
Case wear Ring
Spacer Sleeve
Impeller Key
Washer
Pump Shaft
Coupling Key
Roller Bearing
Angular Conct Ball Bearing
Inner Circlip
Outer Circlip
Gasket for Pump Casing
Gasket
Assembling Sleeve
Allen Screw
Allen Screw
Allen Screw
Screw
Pump Casing
Impeller
Case wear Ring
Spacer Sleeve
Impeller Key
Washer
Pump Shaft
Coupling Key
Roller Bearing
Angular Conct Ball Bearing
Inner Circlip
Outer Circlip
Gasket for Pump Casing
Gasket
Assembling Sleeve
Allen Screw
Allen Screw
Allen Screw
Screw
Pump Casing
SV mounts
Limit Switch
Limit Switch
Sampling Cocks
Awlwash
Awlprep Plus Wax & Grease Remover
Interprotect Primer - Grey - Surface Primer
Epoxy Thinner No 7
Trilux 33 - Black
A/F Thinner No. 3
Interprime 820 - Grey
Wiring
CONTROL PANEL WITH ACCESSORIES SET
DZUS Fastener
Rubber inserts
Coupling
Valves, 1/4 inch dia
Firemain Pump
ELECTRICAL
RUSTLIC 631
ARALDITE TUBE
COTTON STOCKNITE
STEEL GRIP TAPE RED
STEEL GRIP TAPE YELLOW
STEEL GRIP TAPE BLUE
ALCOHOL
BALL BEARING SKF 6312 2Z
BALL BEARING SKF 6312 2Z
BALL BEARING SKF 6310 2Z C3
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF 6205 2Z
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF 6204 2Z
BALL BEARING SKF 6304ZZ/C3
BALL BEARING SKF 6208 2Z
BALL BEARING SKF 6208 2Z
BALL BEARING SKF 6206 2Z
BALL BEARING SKF6309 ZZ
BALL BEARING SKF 6309 2Z C3
BALL BEARING SKF 6205 2Z
BALL BEARING SKF 6004ZZ
BALL BEARING SKF 6309 2Z C3
BALL BEARING SKF 6206 2Z
BALL BEARING SKF 6205 2Z
BALL BEARING SKF 6302ZZ
BALL BEARING SKF 6301ZZ
BALL BEARING SKF 6205ZZ
BALL BEARING SKF 6205ZZ
WINDING WIRE DUAL COATED 16.5 SWG
FIBRE GLASS SLEEVE UNVARNISHED 2MM
WINDING WIRE DUAL COATED 17 SWG
FIBRE GLASS SLEEVE UNVARNISHED 3MM
WINDING WIRE DUAL COATED 20.5 SWG
FIBRE GLASS SLEEVE UNVARNISHED 14MM
WINDING WIRE DUAL COATED 21 SWG
FIBRE GLASS SLEEVE UNVARNISHED 8MM
WINDING WIRE DUAL COATED 22 SWG
WINDING WIRE DUAL COATED 25 SWG
AC Slew Motor (2.2 KW) 415V, 3 Phase
AC Hoist Motor (1.1 KW) 415V, 3 Phase
Limit switch
CABLE 4 CORE 2.5 SQMM
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF 6306ZZ/C3
Cables
WINDING WIRE DUAL COATED 16 SWG
FIBRE GLASS SLEEVE UNVARNISHED 1MM
BALL BEARING SKF 6208 2Z
BALL BEARING SKF 6206 2Z
BALL BEARING SKF 6205 2Z
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF 6203ZZ/C3
BALL BEARING SKF6208
BALL BEARING SKF6208
Star Delta Timer (3-60 Sec), 240 V
Motor Protection Relay
Bi- Metalic Over Load Relay Rang(3-5A)
Auxilary Contactors Rated 50A, 240V, AC Coil, with 1NO+1NC Contact
Auxilary Contactors Rated 32A, 240V, AC Coil, with 1NO+1NC Contact
Auxilary Contactors Rated 18A, 240V, AC Coil, with 1NO+1NC Contact
Auxilary Contactors Rated 9A, 240V, AC Coil, with 1NO+1NC Contact
Rotary switch 60 A
MPU Card
Over Load Relay
Overhauling accessories
Overhauling accessories
100A Breaker Make M/s Siemens
Main contactor Make: L&T
Add on block, Make: L&T
Over Load Relay, Make: L&T
Auxilary Contactors, Make: Schneider
Add on block, Make: Schneider
Main Contactors for Sea water Pump, Make: Schneider
Timer Relay Make:EAPL
Winding Temp. RelayMake M/s Minilec
Under & over voltage Relay single phase Make M/s Minilec
Under & over voltage Relay three phase Make M/s Minilec
Auxilary Contactor Make : Bhartia Cutler Hammer
Auxilary Contactor Make : Bhartia Cutler Hammer
Auxilary Contactor Make : Bhartia Cutler Hammer
Auxilary Contactor Make : Bhartia Cutler Hammer
Auxilary Contactor Make : Bhartia Cutler Hammer
Add on Block, Make: Bhartia Cutler Hammer
Add on Block, Make: Bhartia Cutler Hammer
Add on Block, Make: Bhartia Cutler Hammer
Add on Block, Make: Bhartia Cutler Hammer
Auxilary Contactor Make : Bhartia Cutler Hammer
Heavy Duty Switch Disconnector Fuse 63 Amps, Make: Siemens
Overhauling accessories
Lights
Overhauling accessories
CABLE 3CORE 1.0 SQMM
Flood Sensor
Flood Sensor JB
Overhauling accessories
Smoke Detector
Heat Detector
Manual Call Point
POWER SUPPLY PAS 1267/90.5V DC
LAN CONNECTOR
PCB ASSEMBLY
07 PIN MICROPHONE PLUG
LINE INTERFACE CARD
DATA LINE INTERFACE CARD
PS 1289/90021(24V DC) PSU
DIGITAL PCB FOR INTERFACE SYSTEM
FUSE 415V,20AMP
FUSE HOLDER
PCB ASSEMBLY O/L
MEMORY MODEM MODULE
RELAY FIR RELAY CARD
INTERPHONE DISPLAY SNAPPDOME KEY BOARD
HAND SET
FUSE 4A
FUSE 125MA
TRANSISTOR 2N 6254
TRANSISTOR BC 547B
TRANSISTOR 194B
TRANSISTOR BC 147B
TRANSISTOR BF 195D
TRANSISTOR BC 635
TRANSISTOR BC 636
TRANSISTOR TBD 237
DIODE DY 125
TRANSISTOR BC 338
TRANSISTOR BC 549B
200 W Amplifier
Line Interface Card
Microphone with stowage hook,pre amplifier and 7 pin
100 W Amplifier
20 W Amplifier
Mic Connection Box
Cabin type speaker 4W
Horn type speaker 8W
Head set with pre amplifier &PTT
LCS Card
Power Card
CABLE 4 CORE 2.5 SQMM
Double Tier Naviagation Light
Light All Round white
Search Light
Double Pole Switch for weather deck
Navigation light shade
ON/OFF Switch (Supply)
ON/OFF Switch (Outgoing)
Push Button for Acknowledgement / Reset
Fuse (Glass Cartidge) for control panel
Fuse (HRC) for Feeder
Supply On indication Lamp(230V)
LED (Amber)
LED (Red)
LED (Green)
Supply On indication Lamp(24V)
Heating Element set for 3 Kw Hot Plate
Heating Element set for 4 Kw for Oven
Oven thermostat 50-300 dgree celcius cappilary type EGO make
Three Heat control switch for Hot plate
Oven control switch ON/Off
Oven Power Contactor 16 Amps BCH contactor
Bus bar insulator porceline based connector
MCB 20 Amps 415V
Control circuit transformer
SV Mounts
Bearings
Overhauling kit
Bearings
Overhauling kit
Bearings
Overhauling kit
Bearings
Overhauling kit
Bearings
Overhauling kit
Wiring
Terminal Block
Voltmeter
AMP Meter
Overhauling accessories
Overhauling accessories
Starters
Combined Bell and Lamp Unit
Flood Sensors
Wiring
Junction box
Wiring
Main Contactors
Overload Relays
Terminal Contactors
Indication
Buzzer
Relays
Control Transformer
MCCB 40A
OVER AND UNDER VOLTAGE RELAY ALVD2 MAKE MIMILEC
FUSE ASSEMBELY WITH FUSE HOLDER
100 A BREAKER
Fuse Unit
Overhauling accessories
Starter panel overhauling accessories
Push Buttons
Indications
Cable Tray and accessories
Overhauling accesories
Starter Panel Body
Bunk Lights
Fan Switches
Wiring
Switches
Wiring
Gland packing
Cable
Wiring
Connection point
Overhaul accessories
Speakers
POE switch
Cameras
Cable
Overhauling accessories
Horn type speaker, 8 watt
Cabin type speaker, 4 watt
Mic connection boxes
Microphone with Stowage hook 7 pin connector
Music Player
Toggle Switch
Nav light fittings with lamps double tier
Nav light fittings with lamps single tier
LED flood light
Connection box
Wiring
Overhauling accesories
Elements
Bearings
CARBON BRUSH ASSEMBLY
EMERGENCY STOP PUSH BUTTON
INDICATION LAMPS
WATER TIGHT PANEL
EM BREAK ASSEMBLY
ROTARY ON/OFF SWITCH
Internal Wiring
Auxiliary Contactors
SAFETY RELAY
Overhauling accessories
Cable
Main Supply fuse base
Overhauling accessories
Cables
Software upgradation accessories as per OEM BoM
Cable tray and metallic strip
Acrylic Board
Bidder Name
SEABLUE SHIPYARD LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 1.67 MB
Tenderdocument.pdf
Tender Documents • 28.02 MB
Download all tender documents and submit your bid