Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.0 LAdmitted-Finance BEHIND MAHIPAL KI KOTHI SUBHASH NAGAR ROORKEE | ₹52.0 L | L1 | Admitted-Finance |
| 2 | L2₹54.5 LAdmitted-Finance | ₹54.5 L | L2 | Admitted-Finance |
| 3 | L3₹56.2 LAdmitted-Finance 221 VIJAY PARK EXTENSION LANE NO 11 DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹56.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | national engineers and associates L3 | Shekwal Power Space L1 | Aayansh Infra Power Pvt Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | E-CLAMP FOR 11kV | 30 | NOS | 9,000 ₹9,000 | 9,000 ₹9,000 | 7,500 ₹7,500 |
| 3.00 | EARTH WIRE CLAMP FOR SP-55 WITH
N/B | 10 | NOS | 5,000 ₹5,000 | 3,000 ₹3,000 | 2,500 ₹2,500 |
| 4.00 | PP & CLAMP WITH N&B ST POLE SP-55 | 10 | NOS | 5,000 ₹5,000 | 3,000 ₹3,000 | 2,500 ₹2,500 |
| 5.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 20 | NOS | 5,000 ₹5,000 | 4,000 ₹4,000 | 5,000 ₹5,000 |
| 6.00 | Stay Clamp for SP-55 With Nut & Bolt | 10 | NOS | 5,000 ₹5,000 | 3,000 ₹3,000 | 2,500 ₹2,500 |
| 7.00 | EARTH WIRE CLAMP FOR SP-23 WITH
N/B | 15 | NOS | 3,750 ₹3,750 | 3,000 ₹3,000 | 3,750 ₹3,750 |
| 8.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 20 | NOS | 9,000 ₹9,000 | 6,000 ₹6,000 | 5,000 ₹5,000 |
| 9.00 | 11 KV CABLE TIES FOR PIN INSULATOR | 90 | NOS | 40,500 ₹40,500 | 27,000 ₹27,000 | 22,500 ₹22,500 |
| 10.00 | 11 KV IPC FOR COVERED TO COVERED COND. | 60 | NOS | 90,000 ₹90,000 | 72,000 ₹72,000 | 90,000 ₹90,000 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
26 Feb 2026, 2:00 pmClosed
SE
EDC TEHRI
Replacement of ACSR Conductor by Covered Conductor of 11 KV Manpur Feeder under EDD Uttarkashi .
2026_UPCL4_91893_1
75/EDCT/2025-26
Open Tender
Miscellaneous Services
90 days
Uttarkashi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹1.1 L
Yes
17 Apr 2026
11 Feb 2026
27 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
PQR PART-1 SHEET For Tender No. 75/EDCT/2025-26
Name of Work “Replacement of ACSR Conductor by Covered Conductor of 11 KV Manpur Feeder under EDD Uttarkashi"
PART -I OPENED ON DATE 27-02-2026 AT 12:00 HRS
Sl. No Name Of Firm
Full Postal Address of Tenderers (Head Office)
1 The Bidder must have valid class A Electrical Contractor license issued by Uttarakhand State Authority.
2 The Bidders have successfully executed construction of 11KV/higher voltage line 5 Km. for UPCL/Power Sector Utilities during the last 5 year as on the date of bid opening. Bidder shall provide Certificate for the same issue from UPCL/SEB’s Power Utilities.
3 Minimum Average Annual Turnover (MAAT) of the bidder for three best of five financial years (i.e. 2020-21, 2021-22, 2022-23, 2023-24 & 2024-25) should not be less than 150.00 Lacs. Bidder shall submit Audited Balance sheet of the same along with the bid. Average Turnover
4 The bidder must have valid registration in labor department, income tax, EPF, ESI /GST and other related agencies/departments as per prevailing law. Bidder shall provide documentary evidence for the same.
5 The tenderer must have active GST registration.
6 An undertaking on Rs 100/- non judicial stamp paper duly notarized by that the bidder has not been blacklisted/ debarred by any Govt. undertaking/Govt. Departments / SEB’s/ Power Sector Utilities. In case same is found then their tender/order shall be treated as cancelled at any stage and EMD/Performance security shall be forfeited.
7 Bidder must submit validity of offer for 180 days from the date of opening of tender on 100/- stump paper along with Rs1/- revenue stamp (as per sheet enclosed)(hard copy of the same must be submitted).
8 Completion Period:- The Completion period of the work shall be 3 from issue of ST Pole.
9 Earnest money (Rs. 106000.00) in shape of BG/DD/FDR/CDR should be vaild for 180 days from the date of opening of tender + 45 days claim periods.(hard copy of the same must be submitted).
10 Whether bidder is Registered in MSME
11 Any other information regarding financial and organization capabilities etc. to ascertain your capacity to complete the project in time.
12 Any deviation.
Singature of Bidder
Item Wise BoQ 15
Select, Excess (+), Less (-)
Tender Inviting Authority: Superintending Engineer, EDC Tehri
Name of Work: Replacement of ACSR Conductor by Covered Conductor of 11 KV Manpur Feeder under EDD Uttarkashi .
Contract No: 75/EDCT/2025-26
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Material Code Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder in Rs. P (GST EXTRA) Excise Duty Amount in INR Rs. P GST Amount in INR Rs. P Freight Charges ( Unloading & Stacking) in Rs. P Any Other Taxes in Rs. P Any Other Duties/Levies in Rs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Description
1 Electrical Items :
2 E-CLAMP FOR 11kV item1 NOS Excess(+) Full Conversion INR As Per Technical Specification is Enclosed.
3 EARTH WIRE CLAMP FOR SP-55 WITH N/B item2 NOS Excess(+) Full Conversion INR
4 PP & CLAMP WITH N&B ST POLE SP-55 item3 NOS Excess(+) Full Conversion INR
5 STAY CLAMP FOR SP-23 WITH NUT & BOLT item4 NOS Excess(+) Full Conversion INR
6 Stay Clamp for SP-55 With Nut & Bolt item5 NOS Excess(+) Full Conversion INR
7 EARTH WIRE CLAMP FOR SP-23 WITH N/B item6 NOS Excess(+) Full Conversion INR
8 PP & CLAMP WITH N&B ST POLE SP-23 item7 NOS Excess(+) Full Conversion INR
9 11 KV CABLE TIES FOR PIN INSULATOR item8 NOS Excess(+) Full Conversion INR
10 11 KV IPC FOR COVERED TO COVERED COND. item9 NOS Excess(+) Full Conversion INR
11 11 KV IPC FOR COVERED TO BARE CONDUCTOR item10 NOS Excess(+) Full Conversion INR
12 11 KV MID SPAN JOINTING KIT item11 NOS Excess(+) Full Conversion INR
13 11KV AAAC AL-59, 70 SQMM Covered Cond. item12 M Excess(+) Full Conversion INR
14 11KV Polyme Pin Ins. (For Convered Cond) item13 NOS Excess(+) Full Conversion INR
15 11 KV Polymer Tension Insulator item14 NOS Excess(+) Full Conversion INR
16 11KV Biometalic crimping insulated lugs item15 NOS Excess(+) Full Conversion INR
17 11 KV TENSION CLAMP WITH BAIL & IPC item16 NOS Excess(+) Full Conversion INR
18 Labour(Services)
19 FABRICATION OF STEEL item17 KG Excess(+) Full Conversion INR Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel ,bracing and spec ial type bracket etc. as per RESPO schedule and local approced drawing.
20 EXCAVATION OF PIT FOR STAY SET item18 CBM Excess(+) Full Conversion INR Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bott om including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
21 ERECTION OF 11 KV STAY SET item19 NOS Excess(+) Full Conversion INR Fixing,tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 11 KV Line
22 GROUTING OF STAY SET item20 CBM Excess(+) Full Conversion INR Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block includ ing cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as pe r RESSPO Manual.
23 EXCAVATION OF PIT FOR POLE item21 CBM Excess(+) Full Conversion INR Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including prop er dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directe d complete work
24 ERECTION OF SINGLE SP-23 POLE item22 NOS Excess(+) Full Conversion INR Erection of SP-23 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps a s per RESPO manual
25 ERECTION OF SINGLE SP-55 POLE item23 NOS Excess(+) Full Conversion INR Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel,& clamps a s per RESPO manual
26 GROUTING OF POLE item24 0.000 CBM Excess(+) Full Conversion INR Grouting of pole in size 0.45x4.45x1/9 of the support in CC ration 1:4:8(1 cement:4 graded stone20 mm niminal size: 8 coarse sand) b lock including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, lev elling as per RESPO cnstruction manual
27 MUFFING OF POLE item25 NOS Excess(+) Full Conversion INR Muffing of poles size 0.45x0.60 cm radius with 1:3:6(1 cement:3 coarse sand :graded stone 10 mm nominal size) block size 45 cm heigh t from ground level including cost of cement,stone and sand etc.
28 DISMANTLING OF SP-21/SP-23 SINGLE POLE item26 NOS Excess(+) Full Conversion INR Dismantling of existing LT/HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(SP-21/SP-23 Single Pole)
29 DISMANTLING OF 11 KV LINE(WEASEL) item27 0.0 CKM Excess(+) Full Conversion INR Dismantling of existing HT line. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light co nnections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel)
30 LOPPING & CHOPPINGOF TREE BRANCHES item28 KM Excess(+) Full Conversion INR Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
31 CONST.,INST.OF DANGER BOARD/ NUMBER PLATE item29 NOS Excess(+) Full Conversion INR Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boa rds of M.S. Sheet 2 mm Thick 11''x7'' size (Including cost of all material)
32 MAKING OF SECTION POLE item30 JOB Excess(+) Full Conversion INR Making of section pole for existing LT/HT/33KV line complete in all respect.
33 CARTAGE SP-21/23 POLE, 0-20 KM item31 NOS Excess(+) Full Conversion INR Cartage of ST pole SP-21/23 Poles from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 0-20 Km)
34 CARTAGE SP-55 POLE, 0-20 KM item32 NOS Excess(+) Full Conversion INR Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Di stance 0-20 Km)
35 CARTAGE OF PETTY MATERIAL,0-20 KM item33 QTL Excess(+) Full Conversion INR Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and u nloading at both ends(distance 0-20 Km)
36 HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) item34 NOS Excess(+) Full Conversion INR Headload cartage of SP-21/23 Pole from road to site(distance 1-3 Km)
37 HEADLOAD CARTAGE SP-55 POLE(1-3 KM) item35 NOS Excess(+) Full Conversion INR Headload cartage of SP-55 Pole from road to site(distance 1-3 Km)
38 HEADLOAD CARTAGE OF MATERIAL(1-3 KM) item36 QTL Excess(+) Full Conversion INR Head load cartage of small material(distance 1-3 Km)
39 STRAIGHTENING OF TILTED STP POLES item37 NOS Excess(+) Full Conversion INR Straightning of Tilted STP Poles
40 TIGHTENING OF STAY SET item38 NOS Excess(+) Full Conversion INR TIGHTENING OF STAY SET
41 BACK CARTAGE OF PETTY MATERIAL,151-200KM item39 QTL Excess(+) Full Conversion INR BACK CARTAGE OF PETTY MATERIAL,151-200KM
42 OPENING & MAKING OF JUMPHER OF SECTION P item40 JOB Excess(+) Full Conversion INR OPENING <(>&<)> MAKING OF JUMPHER OF SECTION POLE
43 FIXING OF CHANNEL, ANGLE ON POLE item41 JOB Excess(+) Full Conversion INR FIXING OF MS CHANNEL, ANGLE AND ALL ACCESSORIES ON EXISTING/NEW DOUBLE POLE
44 FIXING OF 11KV 90KN TENSION CLAMP B&IPC item42 NOS Excess(+) Full Conversion INR Fixing of 11 KV 90 KN Tension Clamp with Bail and IPC
45 FIXING OF 11 KV SUSPENSION TIES item43 NOS Excess(+) Full Conversion INR FIXING OF 11 KV SUSPENSION TIES
46 FIXING OF 11 KV IPC FOR CC TO CC COND. item44 NOS Excess(+) Full Conversion INR FIXING OF 11 KV IPC FOR CC TO CC CONDUCTOR
47 FIXING OF 11 KV IPC FOR CC TO BARE COND. item45 NOS Excess(+) Full Conversion INR FIXING OF 11 KV IPC FOR CC TO BARE CONDUCTOR
48 FIXING OF 11 KV MID SPAN JOINTING KIT item46 NOS Excess(+) Full Conversion INR FIXING OF 11 KV MID SPAN JOINTING KIT
49 FIXING OF 11 KV BIMETALIC LUG item47 NOS Excess(+) Full Conversion INR FIXING OF 11 KV BIMETALIC LUG
50 BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM item48 QTL Excess(+) Full Conversion INR BACK HEAD LOAD CARTAGE OF SMALL LINE MATERIAL 1-3 KM
51 FIXING OF DISC INS. FOR AAAC CONDUCTOR item49 NOS Excess(+) Full Conversion INR Fixing of 11 KV Disc Insulator for AAAC covered Conductor
52 FIXING OF 11 KV PIN INSULATOR item50 NOS Excess(+) Full Conversion INR Fixing of 11 KV pin insulator
53 LAYING, SAGGING OF COVERED COND FOR 11KV item51 M Excess(+) Full Conversion INR LAYING SPREADING <(>&<)> SAGGING OF COVERED CONDUCTOR FOR 11KV
Total in Figures
Quoted Rate in Figures Select %
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
s.pdf
Tender Documents • 1.62 MB
75PQR.xls
Other Document • 0.03 MB
BOQ_108832.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid