Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 11 2 1 149 FLAT NO 204 SEA SHELLS ENCLAVE MERIDIAN TOWERS BEHIND NAVY HOUSE BEHIND NAVY HOUSE VISAKHAPATNAM ANDHRA PRADESH 530003 | VISAKHAPATANAM | ANDHRA PRADESH | 530003 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Apr 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
INVITATION OF BIDS FOR INSTALLATION OF SRGM SYSTEM WITH LYNX U2 SYSTEM ONBOARD IN SHIP
2021_NAVY_436668_1
COM/OFF/WEA/20-21/1075
Limited
Marine Services
Turn-key
90 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
7 May 2021
16 Apr 2021
23 Apr 2021
16 Apr 2021
22 Apr 2021
16 Apr 2021
16 Apr 2021 - 22 Apr 2021
180 days
Tracker Mount Barbette Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Fabrication of the antenna barbette as per specifications mentioned in document The internal lagging of the inside the barbette to be carried out.(Material Aluminium / MS)As per WLD
Antenna stationFitment of Man aloft Switch (MAS) as per drawing near Garpun Bal antenna basementAs per WLD
Tracker Mount Barbette Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Install of base foundations (Material Aluminium / MS)and preperation of base plate for fixing OEM supplied base plate of the Local Reference system (LRS) with associated fitment of LRS and 02 in no., devices Fitment of Air conditioning Units including internal lagging of the barbette.As per WLD
Surface preparation Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Surface preparation, machining, deck strengthening (Material Aluminium / MS) for installation of Antenna Barbette(As per Ref document attached).As per WLD
Antenna Deck- Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Install of base foundations and Fitment of the Tracker Mount (TMT) on Antenna deck.(Material Aluminium / MS,As per Ref document attached)As per WLD
Antenna Deck- Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Machining, planarity checks and alignment (fig),As per WLD
Rocket Launcher Deck Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Install of base foundations and Fitment of the Target Designator Sight (TDS) and Chiller unitAs per WLD
Rocket Launcher Deck Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Strengthening of the base plate for fitment of the TDS on the Bridge Top (Material Aluminium / MS,As per Ref document attached)As per WLD
Rocket Launcher Deck Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Machining, planarity checks and alignment (fig),As per WLD
Bridge Installation of Fire Interrupt SwitchManufacture and Install of base foundations and Fitment of the Installation of Fire Interrupt SwitchAs per WLD
HF (Upper) Compartment- Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Install of base foundations and Fitment of Tracker Servo Cabinet (TSC) , Power Distribution Panel (PDP) ,LRS, Chiller Unit, filters unit, PDP – ACP with associated re-gutting.As per WLD
MR 105 TS - Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Install of base foundations and Fitment of Tracker Control Console (TCC),Tracker Processor Cabinet (TPC), Weapon Control Console (WCC) , Data Recording & Evaluation System (DRES), Gun Control Unit (GCU) , Gun Causality Panel – SRGM (GCP-SRGM) , Combat Management Unit (CMU) , Weapon Control Module – SRM1, Weapon Control Module – SRM2,Weapon Control Module – MR, FCC,PDP-CP, Voltage Converter Unit, Transformer Unit, COTS radar Switching Unit, Filter units and FU-CP along with the associated re gutting.As per WLD
MR 105 TS - Manufacture and Install of base foundations with associated hot work and re-gutting for the following as per referred drawings:Manufacture and Installation of AC trunking to the devices DRES, TCC and WCC and routed through Ship's Ac line.As per WLD
Machining, planarity checks and alignment (fig)Machining, planarity checks and alignment (fig) as per requirement where ever necessaryAs per WLD
SRGM Barbette -Install of base foundations and Fitment of Camera Connection Boxes at SRGM barbette as per drawing.As per WLD
AK630 Barbette -Install of base foundations and Fitment of Camera Connection Boxes at AK 630 (Port & STBD) Barbette as per drawing.As per WLD
Companion 29Install of base foundations and Fitment of BWCS/LYNX swtching Unit at Companioon 29 as per drawing.As per WLD
ResitingResiting / Blanking of the existing Ventilation Trunking feeding the cabinets of Radar MR-105 in HF Compartment and TS Compratment along with removal and re fitment of the AC trunking for shipping in and installation of cabinets (SUBJECT TO INSPECTION ON SITE)As per WLD
ResitingResiting of the existing light fixtures and manufacturing of additional cable trays in the HF, Ts compartment during installation and associated regutting and hot work (SUBJECT TO INSPECTION ON SITE).As per WLD
Manufacturing Deck tubes and Bulkhead glandsManufacturing of 08 Deck tubes and 12 Bulkhead glands of material SS and fitment of the same.As per WLD
Technical Window /Shell plate cuttingTechnical Window / Shell plate (4X4 feet) at Deck -02 cutting on the MR 105 TS (STBD) for shipping inand out the cabinets for installation and re-plating the same post completion of the job along with associated degutting and regutting.As per WLD
Cabling(a) Cabling of approximately 5000 meters (proposed length) as per cable schedule andWLD at designated compartments and locations along with glands.As per WLD
Cabling(b)The glands are to be repacked post cable laying and proven during Air Pressure Test(APT) of the ship),As per WLD
Cabling(c ) Entire layid cabling of the system including power supply cables in cable trays (SS/Al depending on location and of various sizes) at designated compartmentsAs per WLD
Cabling(d) Fixing clamps at interval of 0.3 meters(Material SS), Securing of cables on the channel trays to be undertaken neatly and should be fitted at an interval of 01 feet using metal securing clamps covered with plastics and rubber. Similarly all weather exposed system and power supply cables to be additionally covered with metal plates and covered with stiffeners (1 meter distance) for the entire run of the cable.As per WLD
Cabling(e)Fixing Aluminum Cable Tallies. Firm should supply embossed capital letters (black) aluminum cable tallies and undertake fitment of the entire system cables including power supply cables as per cable schedule/ approved WLD’s.As per WLD
Cabling(f)Termination of old / unused cables by terminating the shield circumferentially and grounding the core at both ends. Proper bonding and grounding of all units to be as per NEC-STD1101.All old and unused cable’s of Radar MR-105 and existing power supply cables inside the compartments to be removed as extent possible including termination of old / unused cables (which cannot be removed) by terminating the shield at circumference and grounding the cores at both ends should be undertaken in the presence of WECORS/ C.No – 62 representatives. (All Cable Glands, cable trays, metal covers for weather exposed cables, clamps, fasteners and C-Clamps to be provided by the firm)As per WLD
connectorisation with associated booting sleeves : Power Cables ---100 (Lug strips 50 & Crimping 150) Data Cables ---125Connectorisation of up to 300 connectors and glands for powering up the system with associated cable booting for the same. (Firm should be in possession of requisite tools for undertaking the above mentioned activities and material required viz. various sizes of Lugs, SS fasteners, MCB cable lug pins etc.)(i)Identification of Cable ends includes (ii)Cable end preparation (iii)Preparation of core end for clamping (iv)Crimping of contacts and Insertion of contact (v)Shield/Screen termination (vi)Earth connection (vii)Check wire (viii)Preparation of optic fibre cable connectionsAs per WLD
Manufacturing and fitment of ClampsManufacturing and fitment of Clamps for mounting of the bulkhead mounted devices, as required.As per WLD
Supply and InstallationSupply and Installation of 1 in No. 2 Ton split air conditioners along with drainout system and all associated auxiallaries .As per WLD
Supply and InstallationSupply and Installation of 01 in No transformer and 02 in No PDBs and 05 Nos 220V, 50 Hz supply boards each board 02 sockets (Location would be indicated by the yard)As per WLD
Supply and InstallationSupply and installation and Connectorisation of 220 V, 5A sockets (15 No's) and 220 V, 15 A (15 No's) sockets of Mil Grade as required with weather proof cover if required at compartmentsAs per WLD
Provisioning of all the lagging and welding materialProvisioning of all the lagging and welding material during regutting and welding of all the devices and compartments.As per WLD
Shipping out of MR 105 Radar unitsShipping out of degutted units of MR 105 Radar from designated compartmentsAs per WLD
Shipping in of units of LYNX U2 SystemShipping in of units of Regutting LYNX U2 System, in designated compartments as per WLDAs per WLD
Proper earthing/bondingProper Bi-Metalic earthing/bonding of all units as per NEC-STD 1101 (earth/ bonding straps including fasteners will be provided by the firm). Fitment/ welding of screws near the equipment needs to be undertaken by the firm.As per WLD
AssistanceAssistance (machining / grinding to be provided during planarity checks and alignment. Alignment process will be undertaken by C No 70/WECORS in the presence of OEM.As per WLD
Installation of 76/62 SRGM, its auxiliary system(a) Fabrication of the followings: - (i) Main gun deck of elevated height as per WLDs (ii) Structural modification barbette/ handling rooms as per WLDs. (iii) Loading platform made of anti- skid grating as per WLDs (iv) Installation of EOD sensor foundation on bridge top as per WLDs. (v) Structural work for fitment of hoist.As per WLD
Installation of 76/62 SRGM, its auxiliary system(b) Fabrication of platforms and brackets for fitment of the followings:- (i) COT console (ii) Barrel cooling control panel (iii) Local stabilization unit (iv) Convertors- 06 in no. (v) Transforms – 03 in no. (vi) Distribution boxes- 08 in no. (vii) System control unit (SCU)As per WLD
Installation of 76/62 SRGM, its auxiliary system(c) Installation of gun seating base with machining of the pedestal and tolerance for the pedestal for seating is + 0.2mm. Holes of the seating base are to be drilled at sight to suit the base gun.As per WLD
Installation of 76/62 SRGM, its auxiliary system(d) Preparation of non-water tight compartment with minor bulkhead partition and a door in gun handling room for housing COT console panel.As per WLD
Installation of 76/62 SRGM, its auxiliary system(e) Piercing of deck / bulkhead at 05 different places for passing of cables and covering with gland packing after completion of wiring / cabling.As per WLD
Installation of 76/62 SRGM, its auxiliary system(f) Manufacture and fitment of cable securing bands along existing / new cable trays and cable glands sealing.As per WLD
Installation of 76/62 SRGM, its auxiliary system(g) Laying of new cables details are as follows: - (i) MR 105 – Fan Room 13- EW Store – Fan Rom 1 – Mess 1 – Handling Room. (ii) Bridge top - NAV Bridge – Flag Bridge lobby – Admiral Flat Lobby - Officers flat Lobby – W/R Lobby – OPS Room – MR 105TS. (iii) Gyro post – Power room 8 – Power room 3 – MR 105TS.As per WLD
Installation of 76/62 SRGM, its auxiliary system(h) Modification of sea and fresh water line for SRGM cooling system from cooling control panel, installed in the gun bay as mentioned in WLDs.As per WLD
SRGM Magazine(i) Fabrication and fitment of SRGM 76 mm ammunition rack in magazine 3 which has capacity of 1300 shells.As per WLD
SRGM Magazine(j) Air trucking to be modified for provided ventilation and AC in COT console compartment.As per WLD
SRGM Magazine(a) Manufacturing and supply of locking mechanisms for SRGM MagazineAs per WLD
SRGM Magazine(b) Drilling and tapping of 04 holes in shell carrier for each lock.As per WLD
SRGM Magazine(c) Alignment and fitment of locking mechanism in SRGM Magazine.As per WLD
SRGM MagazineAdditional stiffening work by fitting bottom plate of EOD at three places (270kgs)As per WLD
SRGM MagazineFitment of aluminium bar out of 10 mm aluminium plate in place aluminium pipes (250kgs)As per WLD
SRGM MagazineManufacturing and fitment of four numbers aluminium and MS plate of sizes 100 X 10 X 300 and 80 X 10 X 300 at four locations (40 and 60 Kgs respectively)As per WLD
Royalle Engineering Enterprise
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .