| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.6 LAccepted-Finance | ₹98.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance Not being L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Substantially Responsive and Not Compliant to the requirements of the tender conditions |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Substantially Responsive and Not Compliant to the requirements of the tender conditions |
| 5 | Rejected-Technical PLOT NO D300 TTC INDUSTRIAL ESTATE TURBHE MIDC TURBHE THANE MAHARASHTRA 400705 UDYAM MH 33 0046291 | THANE | MAHARASHTRA | 400705 | - | - | Rejected-Technical Not Substantially Responsive and Not Compliant to the requirements of the tender conditions |
| Sl No | Description | Qty | Unit | N V Dynamics L2 | Veneklasen Associates India LLP L1 |
|---|---|---|---|---|---|
| 1.00Section-BH | |||||
| 1.01 | 3.1 (a) Screening procedure & General Assessment report
3.1 (b) Submission of preliminary reports- Measurement of Noise levels & report of findings, Measurement of vibration levels (ambient, soil transmissibility and transfer function) and report of findings, report to include screening findings, measured data, detailed analysis and preliminary recommendations.
Assisting in design and approval of Design and Specification of N&V Mitigation assets (Track-structure, fastening, Noise Barrier, etc.) for respective mitigation slabs in collaboration with other nominated contractors of MPMRCL.
Complete Preliminary Stage Report requirements as per the Scope of Works.
3.1 (c) Submission of detailed final stage N&V report - After discussion of the preliminary report, final report on input from MPMRCL will be developed that will include the final analysis and possible noise and vibration mitigation measures for design of track form and acceptance of final N&V report by MPMRCL or any Authorized representative of MPMRCL
Final report with adopted approved design for track form and Noise Barrier/etc.,
Complete Detailed Stage Report requirements as per the Scope of Works.
Complying all observations.
Note:- Refer to Para 3.1 of Vol-III for Scope of work & detailed deliverables. | 1 | Nos | 58,56,671.88 ₹58.6 L | 45,82,325 ₹45.8 L |
| 2.00Section-IN | |||||
| 2.01 | 3.1 (a) Screening procedure & General Assessment report
3.1 (b) Submission of preliminary reports- Measurement of Noise levels & report of findings, Measurement of vibration levels (ambient, soil transmissibility and transfer function) and report of findings, report to include screening findings, measured data, detailed analysis and preliminary recommendations.
Assisting in design and approval of Design and Specification of N&V Mitigation assets (Track-structure, fastening, Noise Barrier, etc.) for respective mitigation slabs in collaboration with other nominated contractors of MPMRCL.
Complete Preliminary Stage Report requirements as per the Scope of Works.
3.1 (c) Submission of detailed final stage N&V report - After discussion of the preliminary report, final report on input from MPMRCL will be developed that will include the final analysis and possible noise and vibration mitigation measures for design of track form and acceptance of final N&V report by MPMRCL or any Authorized representative of MPMRCL
Final report with adopted approved design for track form and Noise Barrier/etc.,
Complete Detailed Stage Report requirements as per the Scope of Works.
Complying all observations.
Note:- Refer to Para 3.1 of Vol-III for Scope of work & detailed deliverables. | 1 | Nos | 59,54,759.38 ₹59.5 L | 52,79,789 ₹52.8 L |
Updated dates
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
20 Nov 2025, 4:00 pmClosed
Director Projects
2nd Floor, Smart City Development Corporation Limited Office Building, Kalibadi Road, BHEL, Sector A, Berkheda, Bhopal 462022, Madhya Pradesh
Appointment of Consultant for Noise and Vibration study and proposing/recommending suitable mitigation measures for Bhopal and Indore Metro Rail project
2025_MPMRC_248140_1
2192/MPMRCL/2025/Pkg/BHIN_22R
Open Tender
Consultancy
365 days
Bhopal and Indore
As Per Tender Document
4 documents required · 4 mandatory
₹5,000
Yes
₹1.3 L
Yes
MPMRCL Bhopal
19 Feb 2026
10 Sept 2025
21 Nov 2025
10 Sept 2025
20 Nov 2025
22 Oct 2025
11 Sept 2025 - 24 Sept 2025
1 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.56 MB
3_BHIN_22_VOL_III_ER.pdf
Tender Documents • 1.26 MB
2_BHIN__22_VOL_II_GCC_PCC.pdf
Tender Documents • 0.88 MB
BHIN_22_VOL_IV_B_Indore_Alignment_Drawings_Part_2of3.pdf
Tender Documents • 16.50 MB
01_BHIN_22_Vol_I_NIT_ITT_EQC_LOT.pdf
Tender Documents • 1.31 MB
BHIN_22_VOL_IV_A_Bhopal_Alignment_Drawings_Part_3of3.pdf
Tender Documents • 20.58 MB
INDBDEPOT.pdf
Tender Documents • 14.53 MB
BHIN_22_VOL_IV_A_Bhopal_Alignment_Drawings_Part_2of3.pdf
Tender Documents • 17.91 MB
Bhopal_Depot_R5.pdf
Tender Documents • 12.16 MB
BHIN_22_VOL_IV_A_Bhopal_Alignment_Drawings_Part_1of3.pdf
Tender Documents • 10.86 MB
BHIN_22_VOL_IV_B_Indore_Alignment_Drawings_Part_3of3.pdf
Tender Documents • 10.82 MB
5_BHIN_22_Vol_V_Pricing_Document.pdf
Tender Documents • 0.41 MB
BHIN_22_VOL_IV_B_Indore_Alignment_Drawings_Part_1of3.pdf
Tender Documents • 28.02 MB
BOQ_284298.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid