Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 LAccepted-AOC | L1 | Accepted-AOC Lowest rate of tender | |
| 2 | L2₹9.6 L+₹6,240 (0.65%)Rejected-Finance 5A GOBINDA SARKAR LANE KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | L2 | Rejected-Finance Higher rate | |
| 3 | L3₹9.6 L+₹6,432 (0.67%)Rejected-Finance | L3 | Rejected-Finance Higher rate | |
| 4 | L4₹9.6 L+₹6,720 (0.70%)Rejected-Finance | L4 | Rejected-Finance Higher rate | |
| 5 | L5₹9.7 L+₹16,128 (1.69%)Rejected-Finance 919 G MOTILAL GUPTA ROAD KOLKATA 700082 | KOLKATA | KOLKATA | WEST BENGAL | 700082 | L5 | Rejected-Finance Higher rate |
Tender Value
₹9.6 L
EMD Value
₹19,201
Closing Date
11 Mar 2026, 11:00 amClosed
Executive Engineer PWD KNHD
P16 INDIA EXCHANGE PLACE EXTENSION 2ND FLOORKIT BUILDING Kolkata 700 073
Annual Group maintenance of Building works to the old building G2 of W.B University of Health Science, Salt Lake sL-2
2026_WBPWD_1014662_2
WBPWD/EE/KNHD/NIT-56/25-26
Open Tender
Support/Maintenance Service
Percentage
365 days
University of Health Science
Please refer Tender documents.
5 documents required · 5 mandatory
₹19,201
Yes
8 Jul 2026
25 Feb 2026
13 Mar 2026
25 Feb 2026
11 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out shutter of door and window, dismantling by parts (for repair or replacement of damaged parts) , reassembling and refitting and rehanging same with old fittings but with new screws as necessary.(Where different parts of same shutter are renewed under different item, payment under item 73 will be made once only). | 79.97 | M2 | 126 | ₹10,076.22 |
| 2 | Taking out existing partition/ceiling of particle board, masonite board, ply board, soft board etc. of any thickness and refixing same in new position with necessary clamps making holes in walls, floor, roof and mending damages if any.[concrete plaster will be paid separately] | 21.14 | M2 | 55 | ₹1,162.7 |
| 3 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).
Sal : Malayasian (ground floor) | - | M3 | 83,218 | - |
| 3.01 | 1st floor | - | M3 | 83,418 | - |
| 3.02 | 2nd floor | 1 | M3 | 83,618 | ₹83,534.38 |
| 4 | Reparing collapsible gate by cutting out all rivets as necessary reassambling all members including welding pieces of channels, sraightening bent bars and rivetting with new rivets and fitting in position and painting two coats. | 44.12 | M2 | 379 | ₹16,721.48 |
| 5 | Collapsible gate with 40mm x 40mm x 6mm Tee as top and bottom guide rail, 20mm x 10mm x 2mm vertical channels 100mm apart in fully stretched position 20mm x 5mm M.S. flats as collapsible bracings properly rivetted and washered including 38mm steel rollers including locking arrangements, fitted and fixed in position with lugs set in cement concrete and including cutting necessary holes, chasing etc. in walls, floors etc. and making good damages complete. | 11.88 | M2 | 4,330 | ₹51,440.4 |
| 6 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete.
Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.
The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete.
3rd floor level | 0.2 | MT | 73,400.74 | ₹14,680.15 |
| 7 | Easing and oiling, cleaning collapsible gate and repairing to locking arrangements. | 40.92 | M2 | 17 | ₹695.64 |
| 8 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. | 70.05 | M2 | 29 | ₹2,031.45 |
stage.html
html • 0.11 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_2492385.xls
BOQ • 0.40 MB
2911_NRe_6th5696FY011019_M3_OK.pdf
Tender Documents • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .