Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30,072Accepted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹35,046+₹4,974 (16.5%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹40,002+₹9,930 (33.0%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹49,560+₹19,488 (64.8%)Rejected-Finance | L4 | Rejected-Finance Not Being L1 |
Tender Value
Refer Docs
Closing Date
9 Sept 2020, 6:00 pmClosed
CE CG GOA
HQ CE CG GOA- 403 806
CONSULTANCY FOR CONSTRUCTION OF INDOOR BADMINTON COURT WITH ALLIED FACILITIES AT CGRA, KOZHIKODE (SPECIAL WORK) UNDER GE (I) CG KOCHI
2020_MES_372296_1
30010/JO-17/2020-21/E3
Limited
Consultancy Services
Supply
45 days
GOA
AS PER NIQ AND APPX
9 documents required · 9 mandatory
₹0
Exempted
23 Sept 2020
26 Aug 2020
11 Sept 2020
26 Aug 2020
9 Sept 2020
2 Sept 2020
1. Consultancy Service for Strucutural Design for Constn of Indoor Badminton Court with allied facilities at CGRA, Kozhikode. [Qty: 270 Sqm] (a) Constn of Indoor Badminton court (270 SQM). In permanent specifications 9.40m high (b) The consultant shall provide the STAAD file, Auto CAD drawings in soft copy. Design folder and drawings duly vetted by IIT/NIT/IISc/Govt Engineering College shall be submitted along with soft copies. 2. The consultant shall submit detailed structural design and drawing based on approved design folder to the client for checking. Rep of consultant/designer will be available during checking for necessary clarification /explanation to the client at the appointed date and time. The modification as suggested by the client shall be incorporated and final approved drawing shall be submitted. 3. All structural drawings shall be prepared as per standard Structural norms and notations etc as followed by client. Analysis and design of structures shall be as per latest revisions of IS-456 2000,IS 1893 2016 and complying with IS 13920 2016 for ductile detailing of reinforcement. The following structural parameters/ details shall be adopted for design:- (a) Location of structural : Kozhikode (b) Type of construction : RCC framed. (c) Type of concrete : M-30 Concrete. (d) Type of steel : Fe-500D Grade (e) Safe bearing capacity of soil : As per soil test report (f) Super structure : Cast-in-situ RCC framed structure (g) Analysis & Design: STAAD pro connect edition version 22.03.00.28 (h) Sesismic zone and importance factor: As per seiismic zone of the location (Zone-III) (j) Exposure condition : Severe (k) Basic wind speed : As per relevant location (l) Fire resistance rating : 1.5 Hours. 4. The column and location shown in architectural drawings are tentive only and can be changed as per structural requirements. However, the layout plan of rooms and their sizes will remain the same:
5 Documents to be made available to consultant by the department and all the documents are to be returned to the department along with the completion of job order:- (a) Revelant extract of BP's if applicable. (b) Copy of site plan in suitable scale/contour plan/level sheet as applicable (c) Copy of Adm Approval (d) Copy Architectural drawings. (e) Copy of SBC report. (f) Other revelant details as applicable. 6. The following requirement shall be met with while preparation of structural drawings:- (a) The consultant shall be developing complete structural designs and drawings confirming to latest version of revelant BIS codes. The analysis & design shall be carried out using latest versions of design software STAAD Pro connect edition version 22.03.00.28. (b) The design concept and plans shall be got approved for a very building/structure from the client before commercement of design. The computer print of structural layout plan must show the member number. Clarification shall be obtained immediately in case of any need. (c) The design folder(s) and computer prinout along with CDs shall be submitted in original duly signed by the consultant to be client. (d) The structural drawings shall be drawn to a scale sufficient for clear interpretation by executives. (e) Every sketch shall be given a serial number so that it can be uniquely referred to along with sheet No e.g " Section of Beam PB (Drawing No 5) Sheet No 8-9" etc, Reference number shall be taken by the consultant from client. (f) Schedule of beams, slabs, column and footing shall be given in the table form with sketch of each type. (g) The consultant must familiar himself with the general format of structural drawings followed in the office of the MES and prepare his drawings accordingly. (h) The structural drawings should give foundation plan floor plan, roof plan, details of portal. Details of joints, connection details of welding etc if any. (j) Detailing of reinforcement bars given exhaustively and clearly so as to be totally unambiguous for executives. (k) Design of floor of all types and pavements shall also be given.
7. Consultant shall submit to the client the documents as described below: (a) SUBMISSION OF INITIAL DOCUMENTS Consultant shall submit the following documents within three weeks from the date of issue of job order:- (i) Initial Structural drawings - 02 sets (A1 size) (ii) Initial Design calculation - 01 Folder (Draft CD) (b) SUBMISSION OF FINAL DOCUMENTS Consultant shall submit the following documents within six weeks from the date of issue of job Order duly vetted from designated institute viz IIT/NIT/IIS/Govt Engineering Collage duly signed by authorized signatory on behalf the institute and not from a professor/individual in his personal capacity. (i) Final Design folder incl STAAD file, Auto CAD- 01 Folder & CD Drawings hard copy as well as soft copy in a CD (ii) Original Tracing of all drawings prepared as directed-01 Set (A1 size), 05 Set( A1size) by the client & white sheet (c)The document submitted by the consultant shall be scrutinized by the client and any observations raised and clarifications sought by the client shall be replied/ clarified by the consultant to entire satisfaction of the client within three days of communication from the client. The consultant shall also attend the office of the Chief Engineer (CG) Goa, if so called for personal discussion and clarification without any extra cost to the client. 8 Liability clause for consultant : Liability for the following aspects shall be part of this quotation as per E2 Wks (Design) sub Directorate, Engineer-in-Chief’s Brach Integrated HQ of ministry of Defense (Army), New Delhi letter No: 93348/MISC/Consult/687/E2 Des 3 dated 03 Jul 2011 & A/00157/23-I/Pol/E2W(PPC) dt 02 Jun 2017 & A/00157/23-I/Pol/E2W(PPC) dt 23 Jul 20. (a) The overall responsibility of drawings, design lies on Consultant and may be called upon for mid term review of design during execution of work due to site requirement without additional cost. (b) The consultant alongwith third party vetting also repsonsible for soundness of designs,drawings, adherence to NBC norms, Standing orders and regulations and IS code etc.
(c) The Third Party vetting are also laible and answerable for any design deficiency detected during desing life of building and may be called upon to address such issue if any. (d)Faulty Design: Consultant to be held responsible for any structural failure/ building distress caused due to faulty design. In event of defective design noticed during execution consultant will be charges liquidity damage at the rate 10% of the cost of deviation order necessitated due to revision of drawings. However in case of minus deviation no liquidity damage will be recovered from consultant. (e)Delay: Consultant will be held accountable for delays in providing the final design Consultant will be held accountable for delays in providing the final design Consultant will also be held responsible for delays due to inaccurate design and subsequent redesign. Compensation at the rate of Rs 10,000/- per week of delay will be levied on the consultant. 9. After placement of job order, the consultant has to complete the work within 60 days which comprise submitting of initial document as per Para 8(a) (b)&(c) to the department including vetting and approval of client. Note: Arch drgs and Soil test report shall be provided by the Department
INERTIA ENGINEERING SOLUTIONS
Sai Geotechnical Lab
Integral Solutions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .