| 1 | Admitted-Finance 84 13 D BLOCK AUTONAGAR VISAKHAPATNAM ANDHRA PRADESH 530012 UDYAM AP 10 0002271 37AABCD8980E1ZG R M MSME STATUS AS VERIFIED | VISAKHAPATANAM | ANDHRA PRADESH | 530012 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Mar 2020, 11:00 amClosed
Manager (SRC-Com)
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Servicing and Overhauling of Valves, Pumps, HP Air System and Strainers works on Turn Key Basis of INS SUJATA
2020_HSL_81218_1
20/20001/177/2019-20
Open Tender
Miscellaneous Services
Turn-key
65 days
HSL Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹944
Yes
HSL
₹50,000
Yes
31 Mar 2020
2 Mar 2020
11 Mar 2020
2 Mar 2020
11 Mar 2020
2 Mar 2020
Amount
SD / SDNR / GLOBE / BUTTERFLY / GATE VALVES / REDUCERS/ QSVs/ STORM VALVES / HYDRANTS (Complete SoW will be executed as per Annexure-B)
Overhauling of Valves: Up to 49mm
Overhauling of Valves: 50 to 99mm
Overhauling of Valves: 100 to 174mm
Overhauling of Valves: 175 to 249mm
Overhauling of Valves: 250 to 349mm
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at S.No 10 of Annexure - A (Terms and Conditions), for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (7) against third party/OEM invoice.
SoW for HP AIR SYSTEM: The following Overhauling / repair works are to be carried out on the HP Air system, system to be proved to satisfaction of ship staff / Naval trial agency. All valves, valve chests, reducers, relief valves to be overhauled and pressure tested to the required pressure, satisfactory trails to be shown post overhauling; All Air bottles are to be cleaned, inspected, overhauled, pressure tested to the required pressure and assembled with all mountings post overhauling; All pressure gauges are to be supplied of stainless steel type, glycerin filled and the same to be fixed on a M.S supporting plate fixed to the deck / bulkhead along with suitable pipe lines and adaptors. Welding / cutting of the M.S supporting plate is in contractors scope.The works involves replacing reducer valves, pressure relief valves, pressure gauges, valve spindles etc.,
REMOVE, CLEAN AND PRESSURE TEST FOLLOWING AIR BOTTLES TO 1.5 TIMES OF WORKING PRESSURE: All Air bottels to be buffed, cleaned, inspected, pressure tested to the required pressure and assembled with all mountings post overhauling Replace the defective. ALL SPARES ARE TO BE SUPPLIED BY CONTRACTOR ONLY.
REMOVE, CLEAN AND PRESSURE TEST FOLLOWING AIR BOTTLES TO 1.5 TIMES OF WORKING PRESSURE:- HP AIR BOTTLES - QTY 04, CAPACITY 500 LTRS
REMOVE, CLEAN AND PRESSURE TEST FOLLOWING AIR BOTTLES TO 1.5 TIMES OF WORKING PRESSURE:- CONTROL AIRBOTTLES - QTY 02, 250LTRS
CHECK ALL VALVES FOR LEAKAGE. IDENTIFY VALVES NOT HOLDING AND RENEW THEM. i)100 MM GM GLOBE - 04 NOS, ii) 15 MM GM GLOBE- 06 NOS, 32 MM GM NR GLOBE- 02 NOS, iii) 40 MM GM GLOBE- 05 NOS, iv) 40 MM GM NR GLOBE-04 NOS, REDUCING VALVES- 05
TEST, REFIT AND RESET RELIEF VALVE. REMOVAL/ FITMENT OF NEW RELIEF VALVE - 04 Nos AND REDUCERS - 04 NOS; MATERIAL - GUNMETAL; ALL REQUIRED MATERIAL TO BE SUPPLIED BY CONTRACTOR
REPLACE 10 IN NO PRESSURE GAUGES. 0-45 BAR
REPLACE 10 IN NO PRESSURE GAUGES.0-15 BAR
REPLACE 50% SYSTEM VALVES, size : 32mm - 3nos,40mm - 3nos (High pressure valve,test pressure 45 bar)
TEST, REFIT AND RESET SAFETY VALVES.
13 IN NUMBER DECK FITTINGS OF LP AIR CONNECTIONS TO BE MANUFACTURED AND REPLACED WITH END FITTINGS. DECK CONNECTION VALVES TO BE RENEWED. TEST PR.- 12 BAR. QTY- CONNECTION PIPES WITH FLANGES- 13, LP AIR VALVES- 13
TEST, REFIT AND RESET SAFETY VALVES. FIRM TO QUOTE FOR REMOVAL & FITMENT OF NEW SAFETY VALVE
CONTROL AIR SYSTEM VALVES TO BE REPLACED.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at S.No 10 of Annexure - A (Terms and Conditions), for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (21) against third party/OEM invoice.
RENEWAL OF PUMPS: To Remove old pumps along with all accessories including motors, suction and discharge pipe lines and foundations and shift to HSL workshop. To collect new pumps alongwith motors and shifted to onboard and fitted in its respective positions alongwith new vibration mounts. Job includes pressure gauges fitment with panel, system integration activities. Post fitment equipment to be offered to Naval reps for installation inspection. Observations if any brought out by Naval Rep. to be liquidated. Equipment to be proved as per OEM specification. Trials are to be offered to Naval Trial Agency. Defects if any observed by Naval Trial agency to be liquidated and satisfactory trails are to be reoffered. New Pumps & Motors will be supplied by HSL. And New Mounts to supplied by Contractor through NAVY Approved Vendors with Manufacturing test Certificate. Renew all pumps along with motors. Install & commission the new pumps. Performance to be proven to rated parameters.
Fire pump No1 & 2 along with motors
BILGE & BALLAST PUMP NO 1 & 2 along with motors
FRESH WATER PUMP NO 1, 2 & 3. along with motors
BILGE PUMP NO 1 & 2. WEIR PUMP along with motors
LUB OIL TRANSFER PUMP. along with motors
FO TRANSFER PUMP NO 1 & 2. along with motors
ME LUB OIL STAND BY PUMP (P & S). along with motors
GEAR BOX LUB OIL STAND BY PUMP (P & S). WEIR PUMP along with motors
AC CHILLED WATER PUMP NO 1 & 2. BE PUMP along with motors
AC SEA WATER PUMP NO 1 & 2. BE PUMP along with motors
Compressors Renewal: The following compressors alongwith motor / engine, and control panel, accessories are to be removed from position, and shifted to workshop. New Compressors set alongwith motor / engine are to be collected from HSL / SS and shifted to onboard and refitted back in its respective positions alongwith vibration mounts. Satisfactory trials to be shown under supervision of OEM. Job includes system integration activities. Post fitment equipment to be offered to Naval reps for installation inspection. Observations if any brought out by Naval Rep. to be liquidated. Equipment to be proved as per OEM specification. Trials are to be offered to Naval Trial Agency. Defects if any observed by Naval Trial agency to be liquidated and satisfactory trails are to be reoffered.
DD COMPRESSOR. HATZ DIESEL 40L
OVERHAULING OF PUMPS: Complete SoW will be executed as per Annexure-C. CARRY OUT NR ROUTINES ON CENTRIFUGAL PUMPS AS MENTIONED. FOR ALL PUMPS, MOUNTS TO BE PROCURED AND SUPPLIED FROM NAVY APPROVED VENDORS WITH MANUFACTURING TEST CERTIFICATE
OVERHAUL 03 FRESH WATER PUMPS. CAP: 60M3/HR;
OVERHUL 02 BILGE & BLAST PUMPS. CAP: 60M3/HR;
OVERHAUL 02 BILGE PUMPS. CAP: 60M3/HR;
OVERHAUL 02 STERN TUBE COOLING PUMPS. CAP: 60M3/HR
BOTH FUEL DRAIN PUMPS TO BE OVERHAULED
overhauling of hand pumps, size 32mm. Replace the handles, and all other components. All materials contractor's scope. Renewal of 04 pumps to be considered. New pumps contractor's supply.
CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFNERS AND SUPPORTING RIBS OF ALL PUMPS.
RENEW SV MOUNTS OF PUMPS AND OFFER VIBRATION TRIALS TO SHIP OF ALL PUMPS. FOR 11 PUMPS, NO. OF MOUNTS 88
RENEW SUCTION AND DISCHARGE COMPENSATORS/BELLOW FOR ALL PUMPS. QTY- 01 SUCTION AND 01 DISCHARGE COMPENSATOR IN EACH PUMP.
RENEW SUCTION AND DISCHARGE GAUGES INCLUDING GAUGE LINES, ISOLATIMING COCKS AND SECURING PLATES FOR ALL PUMPS. GLYCERINE FILLED, MAKE:WIKA /WAREE/BOURDON OR ANY NAVY APPROVED VENDOR.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at S.No 10 of Annexure - A (Terms and Conditions), for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (46) against third party/OEM invoice.
SEASUCTION STRAINERS: Complete SoW will be executed as per Annexure-D. Following systems sea suction filters to clean and filter elements to be renewed with brass / gunmetal / stainless steel elements wherever found corroded and wasted as per surveyor/owners recommendation. All filter housings / bodies are to be thoroughly cleaned, painted. NEW STRAINER CONTRACTOR'S SCOPE. ANY REQUIRED CONSUMABLE TO BE SUPPLIED BY CONTRACTOR. FABRICATION, FITMENT CONTRACTOR'S SCOPE.
SEA WATER STRAINERS PERISHED. TO BE MANUFACTURED AS PER SAMPLE. MAT- GUN METAL; APPROX SIZE: ID-350MM, THICH - 3 MM;
SEA WATER STRAINERS TO BE MANUFACTURED AS PER SAMPLE. MAT- GUNMETAL; APPROX SIZE: ID-350MM, THICH - 3 MM;
02 IN NO. REF SEA WATER PUMP SUCTION STRAINER COVER TO BE RENEWED. SCOPE OF WORK INCLUDES REMOVAL OF STUD FROM STRAINER BODY, DRILLING AND TAPPING OPERATION, MANUFACTURING OF APPROPRIATE STUDS WITH NUTS, FITMENT AND PRESSURE TESTING OF STRAINER POST FITMENT OF COVER. QTY - 04 BOLTS; MAT - GUN METAL; TEST PRESSURE - 5 BAR; APPROX SIZE: ID-350MM, THICH - 3 MM;
06 IN NO. REF SEA WATER PUMP SUCTION STRAINERS TO BE MANUFACTURED AS PER SAMPLE. QTY - 06; MAT: GUN METAL; APPROX SIZE: ID-350MM, THICH - 3 MM;
PUMP SUCTION STRAINERS TO BE PROCURED AND REPLACED; APPROX SIZE: ID-350MM, THICH - 3 MM;
50 IN NUMBER STRAINERS OF VARIOUS SIZES TO BE MANUFACTURED AS PER TEMPLATES/SAMPLES; APPROX SIZE: ID-350MM, THICH - 3 MM;
50 IN NUMBER STRAINERS TO BE MANUFACTURED AS PER SAMPLE. MAT- GUN METAL; APPROX SIZE: ID-350MM, THICH - 3 MM;
ENGRAVED IDENTIFICATION TALLIES ON VALVE WHEELS AND VARIOUS EQUIPMENTS TO BE MANUFACTURED AND FITTED ON VALVE WHEELS AND EQUIPMENTS AS INDICATED BY SHIP STAFF
ENGRAVED METALLIC TALLIES FOR VARIOUS EQUIPMENTS AND OPERATING/STARTING/STOPPING PROCEDURES/PARAMETERS TO BE MANUFACTURED AND FITTED IN SITU. QUOTE UNIT RATE.
MANUFACTURE AND RENEW MAIN SUPPLY STRAINER. GUN METAL
GAUGE GLASSES ARE TO BE REPLACED, ALONG WITH GUARD, INLET AND OUTLET VALVES (BRONZE). SHOULD BE PROVED. SPARES, NEW GAUGE GLASSES ARE TO SUPPLIED BY CONTRACTOR ONLY.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at S.No 10 of Annexure - A (Terms and Conditions), for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (59) against third party/OEM invoice.
MISCELLANEOUS WORKS: FABRICATION, FITMENT CONTRACTOR'S SCOPE. ANY REQUIRED MATERIAL SHALL BE SUPPLIED BY CONTRACTOR
LATHE: (A) CHECK FOR SERVICEABILITY. (B) COMPLETE OVERHAULING OF LATHE TO BE CARRIED OUT. (C) LATHE ALIGNMENT TO BE CHECKED AND DEFECT TO BE RECTIFIED. (D) CARRY OUT FUNCTIONAL TEST AND PROVE PERFORMANCE. RECTIFY DEFECTS IF ANY. (E) OVERHAUL COOLANT PUMP. RENEW IF NECESSARY. (F) RENEW COOLANT SYSTEM PIPELINES.(G) TAIL POST BROKEN TO BE REPLACED. SOW INCLUDES DEFECT RECTIFICATION, PROCUREMENT AND REPLACEMENT OF SPARES AND PROVING PERFORMANCE TO SHIP STAFF.
QUOTE FOR OVERHAULING OF GRINDER
PROCURE AND RENEW ALL ISOLATING COCKS IN SPRINKLING SYSTEM. PROCUREMENT CONTRACTOR'S SCOPE; Quote seperately for procurement in spares serial/line.
VALVE WHEELS AND HANDLES ON VARIOUS VALVES TO BE MANUFACTURED AS PER SAMPLE.
ISOLATING COCKS FOR PRESSURE GAUGE LINES TO BE PROCURED AND RENEWED AS PER SAMPLE ALONG WITH END FITTINGS. Quote seperately for procurement in spares serial/line.
VALVE OPENING HANDLES TO BE MANUFACTURED AS PER SAMPLE. SECURING ARRANGEMENT FOR HANDLES TO BE WELDED IN AMR, FER AND AER AT INDICATED PLACES.
TURNING ROD TO BE MANUFACTURED AS PER SAMPLE. ALL REQUIED MATERIAL IS CONTRACOR'S SCOPE
65 IN NUMBER BLANKS OF VARIOUS SIZES TO BE MANUFACTURED AS PER TEMPLATES. 80 MM- 20 65 MM-10 100 MM- 10 50 MM-10 120 MM- 05 35 MM-10
SEA WATER REDUCER OF PACKAGE A/C BODY CRACKED AND DECLARED BER. NEW REDUCER TO BE FITTED; SIZE: 100 MM DIA; PRESSURE RANGE-12 TO 2 BAR; MATERIAL: GUNMETAL; ALL REQUIRED MATERIAL IS CONTRACOR'S SCOPE
RENEW ALL QSVs OF VARIOUS FUEL SYSTEMS (QTY 16) ALONG WITH EASING OUT OF OPERATING CABLES. SOW INCLUDES REPLACEMENT OF OPERATING HANDLES, CHAIN/WIRE ROPE AND PULLEY AND SECURING BRACKETS. POST REPLACEMENT OPERATION OF QSVs TO BE PROVEN TO SHIP STAFF. ROPE DIA - 8 MM;
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at S.No 10 of Annexure - A (Terms and Conditions), for the entire SoW, against third party/OEM invoice for all spares supplied for the Scope. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (71) against third party/OEM invoice.
DELMET COATINGS PRIVATE LIMITED
YEOMAN MARINE SERVICES PVT. LTD.
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
Patel Engineering Works Vizag
SRI SRINIVASA ENGINEERING WORKS
JAMI HYDRAULIC
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .