Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC NO VII 602 A KUNDANNOOR MARADU COCHIN KERALA 682304 | COCHIN | ERNAKULAM | KERALA | 682304 | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.2 L+₹6.7 L (25.0%)Rejected-Finance NO 1 APPU MAISTRY STREET CHENNAI CHENNAI TAMIL NADU 600001 | CHENNAI | TAMIL NADU | 600001 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
Closing Date
19 Jun 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGMM
TELK ANGAMALLY
TRANSPORTION OF MAIN BODY FOR 4 NOS 100 MVA TRANFORMER
2020_TEKL_362171_1
TELK/MK/6412/20/QTN/KVB/4170MB
Open Tender
Transportation Works/Services
Item Wise
365 days
TELK ANGAMALLY
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
7 Sept 2020
4 Jun 2020
20 Jun 2020
4 Jun 2020
19 Jun 2020
4 Jun 2020
90 days
Transportation and unloading of 2Nos. of each 100MVA Transformers from TELK, Angamaly to M/s.Techno Electric & Engineering Co. Ltd., for 220kV GIS Substation, KSEB, KUNNAMKULAM, Thrissur Dist., KERALA and 220kV GIS Substation,KSEB, THALASSERY, Kannur Dist., KERALA
Transportation charges for main body of above Transformers from TELK, Angamaly to M/s.Techno Electric & Engineering Co. Ltd., for 220kV GIS Substation, KSEB, KUNNAMKULAM, Thrissur Dist., (2Nos.) including 10 days free loading period at TELK and 10 days free unloading period at Destination (altogether 20 days free time at loading /unloading point).
Transportation charges for main body of above Transformers from TELK, Angamaly to M/s.Techno Electric & Engineering Co. Ltd., for 220kV GIS Substation, KSEB, THALASSERY , Thrissur Dist., (2Nos.) including 10 days free loading period at TELK and 10 days free unloading period at Destination (altogether 20 days free time at loading /unloading point).
Charges for Unloading of the Transformer Main Body on the Transformer plinth at the destination.
Additional charges for Dragging, if dragging is required for more than 40 Meters (rate per meter beyond 40 Mtr.) ( OPTIONAL).
Detention charges payable after free time as above for Trailer
PCC Logistics Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .