Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L-1 | Accepted-AOC Contract placed on L-1 bidder after TEC recommendation and approval of competent authority |
| 2 | L-2₹3.1 Cr+₹31.1 L (11.1%)Rejected-Finance PUNJAB NATIONAL BANK BUILDING P O MECHEDA MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | ₹3.1 Cr+₹31.1 L (11.1%) | L-2 | Rejected-Finance Quoted L-2 value |
| 3 | L-3₹3.5 Cr+₹71.0 L (25.4%)Rejected-Finance C 6 177 BARG BARIAR SINGH CHHETGUNJ VARANSI VARANSI VARANSI VARANASI UTTAR PRADESH 221101 | VARANASI | UTTAR PRADESH | 221101 | ₹3.5 Cr+₹71.0 L (25.4%) | L-3 | Rejected-Finance Quoted L-3 value |
| 4 | L-4₹4.3 Cr+₹1.5 Cr (53.3%)Rejected-Finance | ₹4.3 Cr+₹1.5 Cr (53.3%) | L-4 | Rejected-Finance Quoted L-4 value |
| 5 | L-5₹4.8 Cr+₹2.0 Cr (72.6%)Rejected-Finance 8TH FLOOR VASUNDHARA BUILDING 2 7 SARAT BOSE ROAD KOLKATA 700020 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹4.8 Cr+₹2.0 Cr (72.6%) | L-5 | Rejected-Finance Quoted L-5 value |
Tender Value
₹3.5 Cr
EMD Value
₹6.9 L
Closing Date
10 Dec 2024, 4:00 pmClosed
The General Manager STPS
Admin Building, STPS,Purulia,W.B., 723146
Biennial Mechanical Maintenance Contract of Coal Handling plant of Unit 5 and 6 , under CHP(M/M) dept., STPS
2024_WBPDC_765283_1
WBPDCL/STPS/NIT/E3751/24-25
Open Tender
Support/Maintenance Service
Item Rate
730 days
Admin Building, STPS, W.B.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6.9 L
Yes
M and C Dept. STPS, Admin Building, STPS,Purulia
3 Mar 2025
30 Oct 2024
12 Dec 2024
30 Oct 2024
10 Dec 2024
14 Nov 2024
13 Nov 2024
Amount
Mandatory Job
AMC Rate per month which includes Wage & benefits of workers including VDA increase into consideration , PPE cost, tools and tackles, consumables, profit & overheads and vehicle cost for transportation etc. i.r.o. the job "Two years Mechanical Maintenance Contract of Coal Handling plant of Unit #5&6 , under CHP(M/M) dept, STPS, WBPDCL."
Optional Job
Drum Lining/Lagging with supply of rubber sheets and solutions
Roller screen overhauling
Crusher Overhauling (Major): Replacement of Crusher Rotor with Hammer, Suspension Bar, liners etc. and other allied works
Replacement of Crusher Body and other allied work
Overhauling of Dust Extraction System at Crusher House
Overhauling of Dust Extraction System at Bunker & TP37
Schedule Belt Replacement (Above 100Mtr.)
Replacement of Stacker Reclaimer Boom Hydraulic Cylinder
Strengthening/Fabrication and Fixing job of Structure of Paddle Feeder/Travelling Tripper/Stacker cum reclimer/ Take-Up Weight, carriage ,trolley & channel/Base frame/Liners/DE-DS System etc.
Pipe Line Modification/Replacement with painting( above 10 M)(upto 100 NB)
Pipe Line Modification/Replacement with painting (Above 10 M)(Above100 NB)
Replacement of Rope of Conveyor & Electric Hoist
Supply & replacement of Damaged Duct with supply of 18 Gauge G.I. Sheet
Supply of additional Mandays (Skilled worker) required for various peripheral and assistance job
INDIAN CONSTRUCTION (BID ID -5791396)
Rohini Transport Corporation (BID ID -5783178)
SHRI NARAYAN CONSTRUCTION COMPANY (BID ID -5798534)
LCPL Energy Solutions Private Limited (BID ID -5789282)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .