Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PROP RAM KRUPA ENTERPRISE PLOT NO 4 JANAKPURI SOC BOKHIRA PORBANDAR GUJARAT 360575 | PORBANDAR | GUJARAT | 360575 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
5 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engineer Officer
The Commanding Officer for Engineer Officer ICGS Sarthak
Various repairs on engg system as per RFP
2024_ICG_675341_2
344/45/EN/STK/24-25
Limited
Marine Services
Works
Porbandar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
7 Oct 2024
26 Sept 2024
7 Oct 2024
26 Sept 2024
5 Oct 2024
27 Sept 2024
Repairs on various engineering systems
E-537: Fwd Fire & Sprinkling pump discharge valve located in main alleyway not holding view spindle thread worn out. Spindle to be renewed as per sample. (Gate valve, Size-80 mm, Mat: Brass )
E-538: Both main engine LOP protection cover to be fabricated as per sample and fitted in position with hinges (Mat: Acrylic )
E-539: Abnormal sound/vibration observed from pre filter pump and not taking suction. Suspect chamber stack is defective. DI/DR to be carried out and pump to be proved for satisfactory operation. In way job includes removal and fitment of pump.
E-540: AER fireman supply valve not holding pressure view spindle and gate deteriorated. Spindle/gate to be renewed as per sample. Valve to be pressure tested upto 10 bar. In way job includes removal and fitment of valve. (Gate valve, Size-65 mm, Mat: Brass)
E-545: Prefilter pump discharge line flange along with high pressure hose deteriorated. Same to be repaired/renewed as per sample. (Flange Mat:- MS)
E-548: AHU No.2 filter base sheet deteriorated/corroded. Same to be repaired/renewed as per sample (approx. size- 1x1 ft, thickness-0.5 mm, Mat-Al)
E-549: OBWS plant backwash line pressure reducer stuck and malfunctioning. Same to be repaired/renewed as per sample.
E-550: Following gauges and flowmeters of AVCAT system to be calibrated and certification to be provided. (a) Flowmeter (Range : 0.7tph to 7.0 tph, Qty : 01) (b) Gauges (range: 0-1.6, Qty: 02)
E-551: Portable lube oil transfer pump not taking suction view impeller and seal worn out. Defect to be rectified and proven for satisfactory operation
E-552: Portable bilge pump not taking suction view impeller and shaft worn out. Defect to be rectified and proved for satisfactory operation.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .