Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC N F 4 40 PWD C 84 P III DATED AGARTALA THE 10TH JUNE 2020 | ₹36.8 L | L1 | Accepted-AOC As per bid opening summary |
| 2 | Rejected-Technical GUACHAND SABROOM SOUTH TRIPURA PIN 799143 | SOUTH TRIPURA | TRIPURA | 799143 | - | - | Rejected-Technical As per Bid opening summary detaiils |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Bid opening summary detaiils |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per Bid opening summary detaiils |
Tender Value
₹43.6 L
EMD Value
₹87,126
Closing Date
19 Feb 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
Executive Egnineer, PWD (R and B), Sabroom Divn
Construction of RCC Boxcell (4.00 m X 4.00m) at ch. 0.750 km over local cherra on the road from Kalcherra to Manirambari via Gagan Ch. Para (L-5.175 km) under Satchand Block SH-Construction of Boxcell (4m X 4m), wing wall etc. during the year 2025-26
2026_CEPWD_70356_1
29(10)/PNIeT/25-26. 69/NIT/SE-III/R/2025-26
Open Tender
Civil Works - Roads
Percentage
90 days
Satchand
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
₹87,126
31 Mar 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures B..With dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specification Clause 305.1 including setting out, construction of shoring & braching, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
I) Ordinary soil (I) Up to 3.00 m depth | 175.43 | cum | 458.2 | ₹80,380.19 |
| 2 | Filling in foundation trenches as per drawing & MORD Technical Specification Clause 305,3.9,1200. 1) Sand filling | 11.1 | cum | 1,361.06 | ₹15,111.85 |
| 3 | Providing concrete for Plain concrete (using Jhama brick aggregate) in open foundations complete including form work as per drawings & MORD Technical Specifications clauses 802,803,900,1202 and 1203(including centering and shuttering staging etc. but excluding reinforcement) I. P.C.C. grade M10 (using Jhama Brick aggregate)
(i) Nominal mix 1:3:6 | 16.5 | cum | 9,457.38 | ₹1,56,075.14 |
| 4 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).
V. R.C.C grade M-25. | 17.27 | cum | 12,839.87 | ₹2,21,744.55 |
| 5 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in foundation complete as per drawings & MoRD technical specifications Clauses 1000 & 1202. | 1.9 | Tone | 91,627.18 | ₹1,74,091.64 |
| 6 | Plain/ reinforcement cement concrete in substructure complete including formwork as per drawing & MoRD technical specifications Clauses 802,804, 805,806,807, 900,1202 & 1204. (including centring, shuttering, staging etc. but excluding reinforcement). VI. RCC grade M 25 i) upto 5 m height | 27.6 | Cum | 13,510.77 | ₹3,72,897.25 |
| 7 | Supplying fitting & placing Thermo Mechanically Treated bar/Cold Twisted deformed bar reinforcement in Substructure complete as per drawings & MoRD technical specification Clauses 1000, 1005, 1010 & 1202. | 3.04 | Tone | 91,869.48 | ₹2,78,915.74 |
| 8 | Providing & laying reinforced cement concrete in superstructure as per drawings & MoRD technical specifications Clauses 800, 900, 1205.4 & 1205.5 (including centering, shuttering, staging etc. but excluding reinforcement). ii) R.C.C grade M-25 a) For height upto 5 m | 14.74 | cum | 14,582.97 | ₹2,14,909.23 |
| 9 | Supplying, fitting, & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in superstructure complete as per drawing & MoRD technical specifications Clauses 1002, 1010 & 1202. | 1.62 | Tone | 93,621.18 | ₹1,51,759.93 |
| 10 | Construction of R.C.C railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line & grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm including reinforcement as per drawing and MoRD technical specifications Clauses 800, 900 and 1208.3 (including centering, shuttering, staging etc. and reinforcement). | 9.8 | Mtr. | 4,251.2 | ₹41,661.76 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_71604.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_71604.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .