Chief Engineer, PWD (R and B)
SE, PWD (R and B), Third Circle/EE Sabroom Division
Lost
Construction of RCC Boxcell (4.00 m X 4.00m) at ch. 0.750 km over local cherra on the road from Kalcherra to Manirambari via Gagan Ch. Para (L-5.175 km) under Satchand Block SH-Construction of Boxcell (4m X 4m), wing wall etc. during the year 2025-26
Satchand | South Tripura, TripuraAOC Updated 31 Mar 2026
Tripura
AOC
Tripura
AOC
Est₹43.6 LL1
This company
SEFALI SARKAR MAJUMDER
Not disclosed