Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Sept 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
20/21995/089/2021-22 Bow thruster motor resistance box on DCI DR XI
2021_HSL_87431_1
20/21995/089/2021-22
Open Tender
Miscellaneous Services
Service
40 days
HSL Visakhapatnam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
28 Sept 2021
17 Sept 2021
22 Sept 2021
17 Sept 2021
22 Sept 2021
17 Sept 2021
120 days
Amount
Bow Thruster Motor Resistance Box:(P & S) : (Make: INDAR, Type: ARY400-S-4)
Port and Stdb bow thruster resistance box having porcelain / insulators for holding the resistance elements and insulation between elements and resistance box body. The mentioned insulators / porcelain are brittled and cracked (approximately 30 nos.) On both boxes. It should be renewed by new insulators with heavy with standing temperature factor . (approx. 300°c). Required insulators are Vendor supply. Need to check the cable tightnes and insulation of resistance box with cable connection. Necessary to improve, if required (min. 200 mw) already stbd resistance one no. Branch is by passed due to melt. Same to be renewed with new resistance (ship supply). Remaing elements conditions need to check.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.1.1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 1.2 against third party/OEM invoice.
Pannel Doors Repairs:
The following electrical pannels are having problem with locking arrangements and isolation switche's handles are brittle and broken. Same to be repaired and hanging relay's sockets, contactors and other modules to be secured. (a). Both bow thruster starter control pannel (pannel lock & isolating switch handles) (b). Both jet pump starter control pannel (pannel lock & isolating switch handles) (c). All lighting distribution boxes (appr. 10 nos.) (d). Main lighting converter pannel, (e). Power distribution pannel (415 vac - appr. 4 nos.) (f) all bridge - control desk (6 nos.), (g) Ecr - control desk (2 nos.) (h) A/E & M/E relay control pannel.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.2.1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 2.2 against third party/OEM invoice.
Protective Aluminium Cover For Pannel
Following pannels getting ingreass of deck water and rainy water through e/r hatch. To avoid this, fit and make 3mm thick aluminium sheets with slanting arrangements on top of main lighting pannel, fridgeration pannel, and heater supply pannel (H1 and its transformer top). This cover should not disturb the pannel doors while opening. Aluminium cover should be properly secured with nut bolts and sealead with silicon sealent.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.3.1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 3.2 against third party/OEM invoice.
DELTA MARINE ENGINEERS
POSITIVE CONTROLS
SRI VINAYAKA MARINE SERVICES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .