| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.1 CrAccepted-AOC BHILWARA TOWERS A 12 SECTOR 1 NOIDA 201301 UTTAR PRADESH | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L-1 | Accepted-AOC L-1 bidder accepted | |
| 2 | L-2₹10.2 Cr+₹1.1 Cr (12.4%)Rejected-Finance 71 CUNNINGHAM ROAD BENGALURU 560052 KARNATAKA | BENGALURU | BENGALURU | KARNATAKA | 560052 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹10.3 Cr+₹1.3 Cr (13.8%)Rejected-Finance 133 14 RADHIKA BHAWAN GHADI CHOWK VIJAY NAGAR JABALPUR 482002 | JABALPUR | JABALPUR | MADHYA PRADESH | 482002 | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹26.0 Cr+₹16.9 Cr (186.0%)Rejected-Finance 1ST FLOOR WEST WING PLOT NUMBER 18 SECTOR 18 999 GURGAON HARYANA 122015 | GURUGRAM | HARYANA | 122015 | L-4 | Rejected-Finance L-4 | |
| 5 | Rejected-Technical A 39 SECTOR 64 GAUTAM BUDH NAGAR DISTRICT NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | TATA Consulting Engineers Limited L2 | WAPCOS LIMITED L3 | SMEC (India) Private Limited L4 | INDO CANADIAN CONSULTANCY SERVICES LIMITED L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | PART-A (Pre-Construction Stage Consultancy) Submission of Inception Report/Design Review Report, Visit of Expert to site ,Review of Additional Investigation if carried out /Submission of Draft design/ Design Intent memorandum, Preparation of tender document for Civil works including tender level design & drawings, technical specifications, detailed bill of quantities (BoQ) etc., Preparation of tender document for HM works including tender design & drawings, technical specifications, detailed bill of quantities (BoQ) etc. of the HM components for the entire project.(For details, refer relevant clause of Appendix-I) | 1 | JOB | 1,50,00,000 ₹1,50,00,000 | 2,70,00,000 ₹2,70,00,000 | 1,00,22,885 ₹1,00,22,885 Lowest | 1,50,00,000 ₹1,50,00,000 |
| 2.00 | PART-B-1 (Construction Stage Consultancy) Submission of Draft design / Carrying out Model Studies. Submission of Draft Drawings / Model Studies report for approval of Client / Issue of excavation and other drawings as required for Main construction/ Q.A. plan / Design / Drawings etc. Issue of Final Detailed Construction Drawing as per construction schedule / Visit of expert at site as and when necessary up to final construction drawing approval stage. Review of the drawings for the HM contractor as and when received and approved thereof. Deployment of Design Coordinator for Co-ordination between Civil / HM and E&M works and on spot revision of drawings during execution of Civil and HM works. Preparation of O&M manual, Preparation of as executed drawings. (For details, refer relevant clause of Appendix-I) | 1 | JOB | 2,39,26,000 ₹2,39,26,000 Lowest | 4,30,00,000 ₹4,30,00,000 | 11,41,08,307 ₹11,41,08,307 | 2,50,00,000 ₹2,50,00,000 |
| 3.00PART-B-2 (Project Monitoring & Quality Control Services) Project Monitoring & Quality Control Services at site for Civil & HM works for the entire project area of activity (For details refer relevant clause of Appendix-I) | |||||||
| 3.10 | Team Leader/Coordinator | 48 | Man Month | 3,10,000 ₹1,48,80,000 | 1,50,000 ₹72,00,000 Lowest | 6,82,533 ₹3,27,61,584 | 3,15,000 ₹1,51,20,000 |
| 3.20 | Quality Control Engineer | 48 | Man Month | 2,05,000 ₹98,40,000 | 60,000 ₹28,80,000 Lowest | 3,32,033 ₹1,59,37,584 | 90,000 ₹43,20,000 |
| 3.30 | Field Engineers (Civil) | 192 | Man Month | 98,000 ₹1,88,16,000 | 60,000 ₹1,15,20,000 Lowest | 2,08,400 ₹4,00,12,800 | 75,000 ₹1,44,00,000 |
| 3.40 | Surveyor | 96 | Man Month | 55,000 ₹52,80,000 | 50,000 ₹48,00,000 Lowest | 1,81,317 ₹1,74,06,432 | 55,000 ₹52,80,000 |
| 3.50 | Geologist | 36 | Man Month | 1,00,000 ₹36,00,000 | 70,000 ₹25,20,000 Lowest | 3,38,833 ₹1,21,97,988 | 1,25,000 ₹45,00,000 |
| 3.60 | Field Engineers (HM) | 24 | Man Month | 1,30,000 ₹31,20,000 | 50,000 ₹12,00,000 Lowest | 2,47,267 ₹59,34,408 | 1,00,000 ₹24,00,000 |
| 3.70 | HSE expert | 48 | Man Month | 1,50,000 ₹72,00,000 | 60,000 ₹28,80,000 Lowest | 2,19,467 ₹1,05,34,416 | 90,000 ₹43,20,000 |
Tender Value
₹12.6 Cr
EMD Value
₹31.6 L
Closing Date
30 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DY. General Manager (Civil)
Dy General Manager (Civil), UJVN Limited, Munsiyari, Pithoragarh
Consultancy Services for Detailed Civil Design and Engineering including Project Monitoring and Quality Control of Sirkari Bhyol Rupsiabagar Hydro Electric Project (120MW) on River Goriganga in District Pithoragarh, Uttarakhand
2023_UJVN_63027_1
01/UJVNL/DGM CIVIL/SBR/23-24
Open Tender
Consultancy
Item Rate
1620 days
Munsyari, Distt Pithoragarh
as per Tender document
2 documents required · 2 mandatory
₹29,500
UJVN Limited Dehradun
₹31.6 L
Dehradun
19 Jan 2024
12 Sept 2023
7 Dec 2023
12 Sept 2023
30 Nov 2023
5 Nov 2023
10 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-A (Pre-Construction Stage Consultancy) Submission of Inception Report/Design Review Report, Visit of Expert to site ,Review of Additional Investigation if carried out /Submission of Draft design/ Design Intent memorandum, Preparation of tender document for Civil works including tender level design & drawings, technical specifications, detailed bill of quantities (BoQ) etc., Preparation of tender document for HM works including tender design & drawings, technical specifications, detailed bill of quantities (BoQ) etc. of the HM components for the entire project.(For details, refer relevant clause of Appendix-I) | 1 | JOB | - | - |
| 2 | PART-B-1 (Construction Stage Consultancy) Submission of Draft design / Carrying out Model Studies. Submission of Draft Drawings / Model Studies report for approval of Client / Issue of excavation and other drawings as required for Main construction/ Q.A. plan / Design / Drawings etc. Issue of Final Detailed Construction Drawing as per construction schedule / Visit of expert at site as and when necessary up to final construction drawing approval stage. Review of the drawings for the HM contractor as and when received and approved thereof. Deployment of Design Coordinator for Co-ordination between Civil / HM and E&M works and on spot revision of drawings during execution of Civil and HM works. Preparation of O&M manual, Preparation of as executed drawings. (For details, refer relevant clause of Appendix-I) | 1 | JOB | - | - |
| 3PART-B-2 (Project Monitoring & Quality Control Services) Project Monitoring & Quality Control Services at site for Civil & HM works for the entire project area of activity (For details refer relevant clause of Appendix-I) | |||||
| 3.1 | Team Leader/Coordinator | 48 | Man Month | - | - |
| 3.2 | Quality Control Engineer | 48 | Man Month | - | - |
| 3.3 | Field Engineers (Civil) | 192 | Man Month | - | - |
| 3.4 | Surveyor | 96 | Man Month | - | - |
| 3.5 | Geologist | 36 | Man Month | - | - |
| 3.6 | Field Engineers (HM) | 24 | Man Month | - | - |
| 3.7 | HSE expert | 48 | Man Month | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_76298.xls
BOQ Document • 0.28 MB
129148234.pdf
Tender Document • 0.08 MB
TenderDoc.pdf
Tender Document • 5.30 MB
129148236.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .