Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50,300Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹52,800+₹2,500 (4.97%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹53,500+₹3,200 (6.36%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
₹50,400
Closing Date
13 Nov 2019, 3:00 pmClosed
Maj GS Pandey, GE (AF) Bhuj
GE (AF) Bhuj Khavda Road Bhuj-Kutch PIN - 370001
Maintenance/servicing and load testing to be carried out to EOT crane MES No 341/7005-CN/10 installed at P-1225 at AF Stn Bhuj
2019_MES_294642_1
3020/eQ/34/19-20/E3
Limited
Job Works
Item Rate
30 days
GE (AF) Bhuj
The firm must be registered with HQ CWE (AF) Bhuj as approved supplier to carry out general order supply and job work
1 document required · 1 mandatory
₹0
Exempted
11 Mar 2021
4 Nov 2019
14 Nov 2019
4 Nov 2019
13 Nov 2019
4 Nov 2019
Amount
(a) M & L for carrying out the following scheduled prentive maintenance for EOT crane MES No 341/7005-CN/10:- (i) Check for worm collector shoes, sag in main runway wiring, ensuring contact to be kept through the entire length runway. Check alignment and relocation. (ii) Inspect for wear of bridge and trolley wheel, flat sports and check in flange. Ensure drive wheels are of the same diameter. (iii) Checking, cleaning the contacts of the controllers and control panel including replacement of contactors 4 pole 25 Amps (Each 02). (iv) Checking the pin and bushes for wear of flexible coupling and proper adjusting. (v) Cleaning and greasing the complete winch & rope assembly inclding all moving parts. (vi) Servicing, aligning and adjusting the limit switches including replacement of the limit switches (Each set 06). (vii) Checking the brake system and repair of break liner system and replacing the wear out liners and aligning complete (03 sets). (viii) Cleaning servicing of complete gear box assembly and replacing gear oil (24 Ltrs). (ix) Servicing, cleaning and replacement of speed control unit with cmponents (Each - 02). (b) Checking for proper functioning of crane and carrying out alignment if required. (c) Load testing of crane after completion of complete maint work. Note:- (a) All material, labor and T & P required for complete the job is responsibility of the firm. (b) Old retrieved material shall be contractor property.
Hi-Tech Systems
GURUKRUPA ENTERPRISE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_330643.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .