Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.4 LAccepted-AOC 203 NABIL APARTMENT ASHOK NAGAR OPP HATHIKHANA ANAJ MARKET TULSIWADI ROAD KARELIBAUG VADODARA 390018 GUJARAT | VADODARA | GUJARAT | 390018 | L-1 | Accepted-AOC Accepted | |
| 2 | L-2₹21.9 L+₹5.3 L (31.8%)Rejected-AOC SHOP NO 02 DADA COMPLEX NEAR DENA BANK NALIYA TAL ABDASA KUTCH GUJRAT 370 655 | KACHCHH | GUJARAT | 370655 | L-2 | Rejected-AOC Rejected | |
| 3 | L-3₹22.5 L+₹5.8 L (35.1%)Rejected-AOC C O ABDUL GANI ISMAIL NALIYA KUTCH PIN 370655 GUJARAT | KACHCHH | GUJARAT | 370655 | L-3 | Rejected-AOC Rejected | |
| 4 | L-4₹2.2 Cr+₹2.1 Cr (1241.8%)Rejected-AOC T 1 GARDEN VIEW APARTMENT NEW BANKER COLONY MUNDRA ROAD BHUJ KUTCH 370001 GUJARAT | KACHCHH | GUJARAT | 370001 | L-4 | Rejected-AOC Rejected | |
| 5 | L-5₹23.1 L+₹6.5 L (39.1%)Rejected-AOC VILLAGE BHANADA TEH ABADASA DISTT KUTCH PIN 370645 GUJARAT | KACHCHH | GUJARAT | 370645 | L-5 | Rejected-AOC Rejected |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
3 Oct 2022, 6:00 pmClosed
GE AF NALIYA No 1
GE AF NALIYA No 1 Air Force Stn Naliya 370655
REPAIR MAINT OF DIFFERENT TYPE CAPACITY OF CENTRIFUGAL SUBMERSIBLE PUMP SETS AND STARTER PANELS AT AF STN NALIYA
2022_MES_549938_1
8845/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Naliya
As per NIT
7 documents required · 7 mandatory
₹500
Yes
GE AF NALIYA No 1
₹35,000
Yes
31 Mar 2023
5 Sept 2022
5 Oct 2022
5 Sept 2022
3 Oct 2022
19 Sept 2022
5 Sept 2022 - 12 Sept 2022
Amount
Disconnecting electric /water connections and removing 60 HP, 3 Phase capacity centrifugal motor from base plate of pumpset and transporting motor to workshop and back after repair , servicing etc and refixing in its original position , testing and commissioning complete all as specified and as directed.
Description all as per Srl item No.1.00 here-in-before but of capacity 35 to 40 HP, 3 Phase
Description all as per Srl item No.1.00 here-in-before but of capacity 15 HP, 3 Phase
Description all as per Srl item No.1.00 here-in-before but of capacity 7.5 to 10 HP, 3 Phase capacity
Disconnecting electric /water connections and removing 5 HP, 3 Phase capacity centrifugal monoblock pumpset from any type existing location, and transporting motor to workshop and back after repair , servicing etc and refixing in its original position , testing and commissioning complete all as specified and as directed.
Description all as per Srl item No.5.00 here-in-before but of capacity 2 HP, 1 Phase
Description all as per Srl item No.5.00 here-in-before but of capacity 1 HP, 1 Phase
Description all as per Srl item No.5.00 here-in-before but of capacity 0.25 to 0.50 HP, 1 Phase Note for Item No 1.0 to 8.00 - Repairs/replacement of parts/winding etc shall be measured and paid separately.
M & L in repairs for rewinding of induction motor of 60 HP , 3 Phase capacity by means of cutting and removing existing burnt out winding completely cleaning and repair of slots and rewinding with new copper wire of existing gauge and size/turns, varnishing with class 'B' insulation assembling the motor complete testing at workshop complete all as specified and as directed.
Description all as per Srl item No.9.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No.9.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No.9.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
M & L in repairs for rewinding of centrifugal monoblock pumpset 5 HP, 3 Phase capacity by means of cutting and removing existing burnt out winding completely cleaning and repair of slots and rewinding with new copper wire of existing gauge and size/turns, varnishing with class 'B' insulation assembling the motor complete testing at workshop complete all as specified and as directed by Engr-in-Charge.
Description all as per Srl item No.13.00 here-in-before but of 2 HP, 1 Phase capacity
Description all as per Srl item No.13.00 here-in-before but of 1 HP, 1 Phase capacity
Description all as per Srl item No.13.00 here-in-before but of 0.25 to 0.50 HP, 1 Phase capacity
S & F in repairs ball bearing in centrifugal motor of 60 HP , 3 Phase capacity after taking out broken/wear and tear unserviceable baering complete all as specified and as directed.
Description all as per Srl item No.17.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No.17.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No.17.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
S & F in repairs ball bearing in centrifugal monoblock pump sets of 5 HP, 3 Phase capacity after taking out broken/wear and tear unserviceable baering complete all as specified and as directed.
Description all as per Srl item No.21.00 here-in-before but of 2 HP, 1 Phase capacity
Description all as per Srl item No.21.00 here-in-before but of 1 HP, 1 Phase capacity
Description all as per Srl item No.21.00 here-in-before but of 0.25 to 0.50 HP, 1 Phase capacity
Disconnecting electric/water connection and removing centrifugal pump of capacity 60 HP, 3 Phase from base plate of pumpset and transporting pump to workshop and back after repair, servicing etc and refixing in its original position , testing and commissioning complete all as specified and as directed.
Description all as per Srl item No.25.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No.25.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No.25.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
Supply and fixing Type TC/P/011 to TC/P/017 spare tyre for coupling all as per existing size and make required at site , all as specified and directed.
S & F in repair stainless steel shaft of centrifugal pump of 60 HP , 3 Phase capacity after taking out broken/wear and tear unserviceable shaft as per the sample and existing type and size complete all as specified and as directed.
Description all as per Srl item No. 30.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No. 30.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No. 30.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
S & F in repairs ball bearing in centrifugal pump of 60 HP , 3 Phase capacity after taking out broken/wear and tear unserviceable baering complete all as specified and as directed by Engr-in-Charge.
Description all as per Srl item No. 34.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No.34.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No.34.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
S & F in repairs impeller in centrifugal pump of 60 HP , 3 Phase capacity after taking out broken/wear and tear unserviceable impeller as per the sample and existing size complete all as specified and as directed.
Description all as per Srl item No.38.00 here-in-before but of 35 to 40 HP , 3 Phase capacity
Description all as per Srl item No.38.00 here-in-before but of 15 HP , 3 Phase capacity
Description all as per Srl item No.38.00 here-in-before but of 7.5 to 10 HP , 3 Phase capacity
Taking out of any capacity submersible pump set carefully from bore well alongwith existing submersible cable MS/GI/HDPE, Column pipe of dia 80mm/ 100mm , flanged type , 3 meters each length (depth of submersible pump is 80 m to 115 m) and shifting column pipe , pumpset and submersible cable aside for reuse and lowering into bore well after repair work including of submersible cable jointing initial pump set testing binding of submersible cable with column pipe by using aluminium wire complete and final testing complete all as specified and as directed by Engr-in-Charge. Note :- (i) The quoted rate deemed to be included the cost of rubber gaskets, nuts, bolts , washers aluminium wire etc. (ii) Any damage to pump set column pipe submersible cable etc while taking out and lowering of pump set will be repaired/replaced by contractor on his own cost and GE's decision shall be final and binding in this regard.
Complete opening of submersible bore well pump set of 40 HP/30 HP/27.5 HP capacity for repair /replacement of unserviceable worn out bearing/worn out unserviceable shaft/burned out copper winding /worn out strainer/bush/sleeve/thrust pad/thrust bearing/thrust bearing lock nut etc , including re-assembling and testing complete all as specified and as directed by Engr-in-Charge. Note :- (i) Cost of transportation of pump set from site to workshop and back to site after repair is deemed to be included in the quoted rate. (ii) Repair/replacement of parts/winding shall be measured and paid separately.
M & L in repairs for rewinding of submersible bore well motor of 40 HP capacity by means of cutting and removing existing burnt out winding completely , cleaning and repair of slots and rewinding with new copper wire of existing gauge and size /turns, varnishing assembling the motor complete testing at workshop complete all as specified and as directed by Engr-in-Charge.
Description all as per Srl item No.44.00 here-in-before but 30 to 35 HP capacity
Description all as per Srl item No.44.00 here-in-before but 27.5/25 HP capacity
Supply in replacement of thrust Bearing for submersible Pump set of capacity 25 HP to 40 HP.
Description all as per Srl item No.47.00 here-in-before but Revolving Disc
Description all as per Srl item No.47.00 here-in-before but CI Connection piece
Description all as per Srl item No.47.00 here-in-before but CI upper housing
Description all as per Srl item No.47.00 here-in-before but CI Lower housing
Description all as per Srl item No.47.00 here-in-before but Repairing of starter stamping
Description all as per Srl item No.47.00 here-in-before but Thrust plate
Description all as per Srl item No.47.00 here-in-before but Balancing of Rotar
Description all as per Srl item No.47.00 here-in-before but CI Suction chamber
Description all as per Srl item No.47.00 here-in-before but CI stage bowl
Description all as per Srl item No.47.00 here-in-before but GM Impeller
Description all as per Srl item No.47.00 here-in-before but CI DOL Piece
Description all as per Srl item No.47.00 here-in-before but CI NRV Body
Taking out submersible 15 HP/10HP/5 HP/3 HP Non-clog sewage pumpset from sewage well/STP pump duly disconnecting electric /sewage connections along with existing submersible cable , pipe etc and shifting pump set cable and pipe aside for reuse and lowering into sewage well after repair works including initial testing water proof cable jointing/sewage line connecting , final testing etc complete all as specified and as directed by Engr-in-Charge.
Taking out of horizontal submersible 30 HP/20 HP/ 15 HP/7.5 HP pump set from open well UG sump duly disconnecting electric /water connections , alongwith existing submersible cable pipe etc and shifting pump set cable and pipe aside for reuse and lowering into sewage well after repair works including initial testing water proof cable jointing water line connecting final testing etc complete all as specified all as directed by Engr-in-Charge. Note for item No 125 & 126 :- (i) The quoted rate deemed to be included the cost of rubber gaskets, nuts bolts, washers etc. (ii) Any damage to pump set pipe submersible cable etc while taking out and lowering of pump set will be repaired/replaced by contractor on his own cost and GE's decision shall be final and binding in this regard.
Complete opening of 15 HP/ 10 HP submersible non-clog sewage pump set for repair /replacement of unserviceable worn out bearing/worn out unserviceable shaft/burned out copper winding /worn out strainer/bush/sleeve/thrust pad/thrust bearing/thrust bearing lock nut etc including transportation complete all as specified and as directed.
Description all as per Srl item No.62.00 here-in-before but 5 HP/3 HP
Complete opening of horizontal submersible 30 HP / 20HP/ 15 HP/7.5 HP pump set for repair /replacement of unserviceable worn out bearing/worn out unserviceable shaft/burned out copper winding /worn out strainer/bush/sleeve/thrust pad/thrust bearing/thrust bearing lock nut etc including transportation complete all as specified and as directed. Note for Item No 127 to 129 :- (i) Cost of transportation of pump set from from site to workshop and back to site after repair is deemed to be included in the quoted rate. (ii) Repairs/replacement of parts/winding shall be measured and paid separetly.
S & F in repairs impeller for 15 HP Submersible non clog sewage pump set of capacity submersible Non-Clog sewage pump set all as provided by the original manufacturer complete all as specified and as directed.
Description all as per Srl item No.65.00 here-in-before but 10 HP Submersible non clog sewage pump set
Description all as per Srl item No.65.00 here-in-before but 5 HP/3 HP Submersible non clog sewage pump set
S & F in repairs impeller for 30 HP Horizontal Submersible pump set of capacity horizontal submersible pump set all as provided by the original manufacturer complete all as specified and as directed by Engr-in-Charge.
Description all as per Srl item No.68.00 here-in-before but of capacity 20 HP Horizontal Submersible pump set
Description all as per Srl item No.68.00 here-in-before but of capacity 15 HP Horizontal Submersible pump set
Description all as per Srl item No.68.00 here-in-before but of capacity 7.5 HP Horizontal Submersible pump set
S & F in repairs ball bearing for 15 HP Submersible non clog sewage pump set capacity submersible Non-Clog sewage pump set all as provided by the original manufacturer complete all as specified and as directed.
Description all as per Srl item No.72.00 here-in-before but of capacity 10 HP Submersible non clog sewage pump set
Description all as per Srl item No.72.00 here-in-before but of capacity 5 HP/ 3 HP Submersible non clog sewage pump set
S & F in repairs ball bearing for 30 HP Horizontal Submersible pump set capacity horizontal submersible pump set all as provided by the original manufacturer complete all as specified and as directed.
Description all as per Srl item No.75.00 here-in-before but of capacity 20 HP Horizontal Submersible pump set
Description all as per Srl item No.75.00 here-in-before but of capacity 15 HP Horizontal Submersible pump set
Description all as per Srl item No.75.00 here-in-before but of capacity 7.5 HP Horizontal Submersible pump set
M & L in repairs for rewinding for 15 HP Submersible non clog sewage pump set capacity submersible non-clog sewage pump set motor by means of cutting and removing existing burnt out winding completely cleaning and repair of slots and rewinding with new copper wire of existing gauge and size/turns, varnishing assembling the motor complete testing at workshop complete all as specified and as directed.
Description all as per Srl item No.79.00 here-in-before but of capacity 10 HP Submersible non clog sewage pump set
Description all as per Srl item No.79.00 here-in-before but of capacity 5 HP/ 3 HP Submersible non clog sewage pump set
M & L in repairs for rewinding for 30 HP Horizontal Submersible pump set capacity horizontal submersible pump set motor by means of cutting and removing existing burnt out winding completely cleaning and repair of slots and rewinding with new copper wire of existing gauge and size/turns, varnishing assembling the motor complete testing at workshop complete all as specified and as directed.
Description all as per Srl item No.82.00 here-in-before but of capacity 20 HP Horizontal Submersible pump set
Description all as per Srl item No.82.00 here-in-before but of capacity 15 HP Horizontal Submersible pump set
Description all as per Srl item No.82.00 here-in-before but of capacity 7.5 HP Horizontal Submersible pump set
S & F in repairs PVC insulated 3 core 10 Sqmm copper multistranded PVC sheathed submersible flexible cable ISI marked and conforming to IS : 694 and connecting to submersible pump and to LT panel after taking out old unserviceable cable complete all as specified and as directed.
Description all as per Srl item No.86.00 here-in-before but 3 core 16 Sqmm
Supply, fixing, jointing and testing of 100 mm bore Cast iron Non Return valve without by pass arrangement , Swing type, confirming to IS 5312, flanged ends pressure rating PN 1.0 complete including taking out unserviceable NRV and depositing to MES store yard complete all as specified and as directed. Note:- Flanged joints complete with jointing material shall deemed to be included in the unit rate of this item.
Description all as per Srl item No.88.00 here-in-before but of size 150 mm bore
S& F in repair MCCB 3 pole , 415 volts , fixed thermal and fixed magnetic setting 100 Amps with braking capacity 16 KA complete all as specified and as directed . Make Havells/Indo Asian/ ABB/Legrand
Description all as per Srl item No.90.00 here-in-before but of 160 Amps , with braking capacity 25 KA.
Description all as per Srl item No.90.00 here-in-before but of 250 Amps , with braking capacity 35 KA.
S& F in repair MCCB 4 pole , 415 volts , fixed thermal and fixed magnetic setting 250 Amps with braking capacity 35 KA complete all as specified and as directed . Make Havells/Indo Asian/ ABB/Legrand
S & F in repairs electronic timer for star-delta time delay 3 to 30 seconds all as per existing sample complete all as specified and as directed.
S& F in repairs 3 pole power contactor type ML-1.5 , range 25 Amps , AC -3 complete all as specified and directed. Make L& T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.95.00 here-in-before but byt type ML-2, 32 Amps 415Volts, 50 Hz. Make L& T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.95.00 here-in-before but byt type ML-3, 40 Amps 415Volts, 50 Hz. Make L& T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.95.00 here-in-before but byt type ML-4, 70 Amps 415Volts, 50 Hz. Make L& T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.95.00 here-in-before but byt type ML-6, 110 Amps 415Volts, 50 Hz. Make L& T/Siemens/BCH/ABB/Schneider
Supply and fixing in replacement overload relay type MN-2 relay range 14-23 Amps complete all as specified and directed. Make L& T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.101.00 here-in-before but type ML 2/3 Range 28-42 Amps . Make L&T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.101.00 here-in-before but type ML 5 Range 45-75 Amps . Make L&T/Siemens/BCH/ABB/Schneider
Description all as per Srl item No.101.00 here-in-before but type ML 5 Range 66-110 Amps . Make L&T/Siemens/BCH/ABB/Schneider
S&F in repairs DOL starter in sheet metal enclosure max motor output at 415 Volt, 3 phase, 5 HP, relay range 7-10 Amps complete all as specified and as directed.
S&F in repairs star delta starter max motor output at 415 Volt, 3 phase, relay range 45-75 in sheet metal enclosure type ML-4 for 3 phase induction motor complete all as specified and directed.
S&F in repairs star delta starter max motor output at 415 Volt, 3 phase, relay range 28-42 in sheet metal enclosure type ML-3 for 3 phase induction motor complete all as specified and directed.
S&F in repairs star delta starter max motor output at 415 Volt, 3 phase relay range 20-32 in sheet metal enclosure type ML-2 for 3 phase induction motor complete all as specified and directed.
S&F in repairs star delta starter max motor output at 415 Volt, 3 phase relay range 9-14 Amps in sheet metal enclosure type MK-1 for 3 phase induction motor complete all as specified and directed.
S&F in repairs Single Phasing Preventer Relay type VSP-II, 415V complete all as specified and directed
S&F in repair ammeter 415 volt, 3 phase 0 to 120 Amps rating, analogue type complete all as specified and directed
S&F in repair voltmeter 415 volt,3 phase 0 to 500 volts rating, analog type complete all as specified and directed
Supply and fixing of terminal strip 100 Amps 6 way
Supply and fixing in replacement of current transformer ratio 100/5 complete all as specified and as directed.
M&L 60 HP 3 phase capacity for preparation of old painted surfaces of centrifugal pump set of following capacity and applying two coats of synthetic enamel paint over a coat of red oxide primer complete and writing of MES/ SM No. complete all as specified and as directed.
Description all as per Srl item No.115.00 here-in-before but 40 HP 3 phase capacity
M & L for providing gland packing as per existing size and make/model, of capacity 60 HP, 3 Phase C/F Motor Pump, all as specified and directed.
M & L for providing gland packing as per existing size and make/model, of capacity 40 HP, 3 Phase C/F Motor Pump, all as specified and directed.
Supply only greasing for bearing of centrifugal Pumps all as specified and as directed.
Labour only for attending of Electric compliants of existing water supply Pump house panels /Borewells LT Panels/CF Motors/Subemrsible moters/Non-clog motors/Horizontal submesible , including connecting electrical accessories / spares of water supply installation, electrical fitting & short circuits in Pump house panel/CF Motors/Submersible motors/ Panels complete all as directed by Engineer-in-charge.(Any material required for attending complaints shall be measured & paid separately under respectvie item ) Notes for item No. 197.00 (i) The complaints shall be attended and the defects shall be rectified by a team of expert and experienced electrician as applicable assisted with adequate No of helpers as directed by Enginner-in-charge. (ii) The complaints shall be attended and defect shall be rectified within 08 hrs commencing from date and time of notifying the complaint failing which a penalty @ Rs 250/- per complaint per day (08 hrs) shall be levied upon/imposed on the contractor and recovery shall be made from contractor's dues. Contractor rep shall be available wef 0800 hrs to 2000 Hrs to receive and notify the complaint (iii) In case, after checking and attending the defect, it is not possible to rectify the defects within 08 hrs the facts shall be brought to the notice of Engineer-in -charge by the contractor /his rep . If Engineer -in-charge is satisfied with contractors view, no recovery will be made. (iv) Any types of machinery/, T & P required for attending the complaints shall be provided by the contracor. (v) The elecrician shall always be in possession of all Electrician tools, LT Megger, Earth tester, Multimeter, Crimping tool, insulation tape, Hand gloves etc required at site.
NEELKANTHA ASSOCIATE
S and G Construction
Venus Engineering
SHREE MOMAY CONSTRUCTION
THOMAS M. MATTACKAL
NILESH SUBHASH KARALE
baghela construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .