| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
18 Mar 2020, 11:00 amClosed
Manager (SRC-Com)
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Electrical Works on Turnkey Basis of INS SUJATA
2020_HSL_81346_1
20/20001/181/2019-20
Open Tender
Miscellaneous Services
Turn-key
65 days
HSL Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹590
Yes
HSL
₹15,000
Yes
HSL Visakhapatnam
13 Apr 2020
7 Mar 2020
18 Mar 2020
7 Mar 2020
18 Mar 2020
11 Mar 2020
10 Mar 2020
Amount
Electrical Works (Bilge Lighting, Various Starter Panels and Control Panels Servicing) on TurnKey Basis of INS SUJATA (NR-19): Complete Scope of Work is to be executed ( including Spares/Material/Consumables/Components) as per Annexures-A, B, C, D, E & F and finally satisfactory trials to be shown to the ShipStaff/HSL/All Navy trial agencies.
PROCUREMENT, REPLACEMENT AND ALIGNMENT OF S/W PUMP, ASSOCIATED MOTOR, STARTER AND CONTROL PANEL. FOUNDATION AND SYSTEM PIPES TO BE MODIFIED AS PER REQUIREMENT AND MOUNTS TO BE RENEWED BY CONTRACTOR AS PER OEM RECOMMENDATION. PUMP TO BE PROVED FOR DESIGN PARAMETERS BY OFFERING FOR TRIALS TO NAVAL TRAILS AGENCIES AND SHIP'S STAFF. NOTE: Pump & Motor HSL supply. Contractror should consider scope only for starter panel as per attached enclosure.
SUPPLY AND INSTALLATION OF NEW FIREMAIN NO 2. SCOPE OF WORK INCLUDES:- NOTE: Pump & Motor HSL supply. Contractror should consider scope only for starter panel as per attached enclosure. FIREMAIN NO 2. 27 KW, 415 V, 3 Phase, 50 Hz. SIEMENS, DL.NO. 2072
REMOVAL OF EXISTING MOTOR, CONTROL PANEL AND ASSOCIATED CABLING.
MANUFACTURING OF SITTING ARRANGEMENTS FOR MOTOR AND CONTROL PANEL .
PROCUREMENT AND INSTALLATION OF NEW FIREMAIN MOTOR AND CONTROL PANEL; NOTE: Motor HSL supply. Contractror should consider scope only for starter panel as per attached enclosure.
PROCUREMENT AND LAYING OF CABLES AS PER SYSTEM MANUAL AND WLD; NOTE: Cable Will be supplied by HSL.
STW AND SERVICEABILITY CHECKS TO BE CARRIED OUT.
POST INSTALLATION TRIALS TO BE CARRIED OUT. DEFECTS OBSERVED TO BE RECTIFIED .
SUPPLY AND INSTALLATION OF NEW BILGE BALLAST NO 1 & 2. SCOPE OF WORK INCLUDES:- NOTE: Pump & Motor HSL supply. Contractror should consider scope only for starter panel as per attached enclosure. BILGE BALLAST NO 1 & 2. 27 KW, 415 V, 3 Phase, 50 Hz. SIEMENS, DLNO.2073
REMOVAL OF EXISTING MOTOR, CONTROL PANEL AND ASSOCIATED CABLING.
MANUFACTURING OF SITTING ARRANGEMENTS FOR MOTOR AND CONTROL PANEL.
PROCUREMENT AND INSTALLATION OF NEW BILGE BALLAST MOTOR AND CONTROL PANEL. NOTE: Motor HSL supply. Contractror should consider scope only for starter panel as per attached enclosure.
LAYING OF CABLES AS PER SYSTEM MANUAL AND WLD. NOTE: Cable Will be supplied by HSL.
STW AND SERVICEABILITY CHECKS TO BE CARRIED OUT.
POST INSTALLATION TRIALS TO BE CARRIED OUT. DEFECTS OBSERVED TO BE RECTIFIED .
PROCUREMENT OF HEAT RESISTANT CABLES AND NEW BILGE LIGHTS ALONG WITH FITTINGS AND INSTALLATION OF THE SAME. NOTE: Contractor should quote along with material as per enclosed BP and also scope of work is attached. BILGE LIGHTING(FER,AND AER). FLAME PROOF 15 W OR HIGHER TYPE TESTED MARINE GRADE LED LIGHTS. M/s RAYEN /MC GEOCH / M/s. ZEAL TECH DL.NO. 2074
PROCUREMENT AND LAYING OF NEW HEAT RESISTANT CABLES.
PROCUREMENT AND INSTALLATION OF FLAME PROOF LIGHTS.
PROCUREMENT AND FITMENT OF NEW CONTROL PANELS FOR LIGHTING CONTROLS.
STARTER (415V, 3PH, 50HZ): THE SCOPE OF WORK AS FOLLOWS: REMOVE THE STARTERS FROM SHIP AND LAND IT TO SHOP FLOOR. COMPLETE SCOPE OF WORK AND SERVICING CARRIEDOUT AS PER ANNEXURE- C & ANNEXURE-E; STARTER TO BE OFFERED FOR TRIALS TO SS AFTER ASSEMBLING AT SHIPYARD SHOP FLOOR. FIT THE STARTER IN SHIP WITH EARTHING CABLE AND TAKE TRIAL WITH MOTORS.
ALL TALLEY, COMPONENTS AND CABLES TO BE REMOVED FROM STARTER AND STARTER BODY TO BE PAINTED (1 COAT RED OXIDE & 2 COATS SMOKE GREY ENAMEL PAINT) INCLUDING PROCUREMENT OF PAINT BY VENDOR.
ALL INTERNAL WIRING, INDICATION, TERMINAL BLOCKS, PUSH BUTTONS AND KNOBS TO BE PROCURED AND REPLACED INCLUDING SPARES BY CONTRACTOR.
65 IN NOS OVER LOAD RELAYS AS PER EXISTING CAPACITY TO BE PROCURED AND REPLACED AFTER CALIBRATION AND CALIBRATION CERTIFICATE TO BE PROVIDED TO SS.
PROCURE AND REPLACE THE CONTACTS OF 65 IN NOS MAIN CONTACTORS (415V, 3PH, 50HZ) WITH 2 NO + 2 NC AS PER EXISTING CAPACITY VIEW OLD CONTACTS PITTED/ BURNT INCLUDING SPARES.
STARTER (415V, 3PH, 50HZ): THE SCOPE OF WORK AS FOLLOWS: REMOVE THE STARTERS FROM SHIP AND LAND IT TO SHOP FLOOR. COMPLETE SCOPE OF WORK AND SERVICING CARRIEDOUT AS PER ANNEXURE- C & ANNEXURE-E; STARTER TO BE OFFERED FOR TRIALS TO SS AFTER ASSEMBLING AT SHIPYARD SHOP FLOOR. FIT THE STARTER IN SHIP WITH EARTHING CABLE AND TAKE TRIAL WITH MOTORS.
ALL TALLEY, COMPONENTS AND CABLES TO BE REMOVED FROM STARTER AND STARTER BODY TO BE PAINTED (1 COAT RED OXIDE & 2 COATS SMOKE GREY ENAMEL PAINT) INCLUDING PROCUREMENT OF PAINT BY VENDOR.
ALL INTERNAL WIRING, INDICATION, TERMINAL BLOCKS, PUSH BUTTONS AND KNOBS TO BE PROCURED AND REPLACED BY CONTRACTOR.
OVER LOAD RELAY AS PER EXISTING CAPACITY TO BE PROCURED AND REPLACED AFTER CALIBRATION AND CALIBRATION CERTIFICATE TO BE PROVIDED TO SS.
VENDOR TO PROCURE AND REPLACE THE CONTACTS OF MAIN CONTACTORS (415V, 3PH, 50HZ) WITH 2 NO + 2 NC AS PER EXISTING CAPACITY VIEW OLD CONTACTS PITTED/ BURNT.
CHECK AUTOMATIC PRESSURE SWITCH ON AIR RESERVOIR FOR CORRECT FUNCTIONING.
CHECK AUTOMATIC PRESSURE SWITCH ON AIR RESERVOIR FOR CORRECT FUNCTIONING.
CALIBRATE LUB OIL LOW PRESSURE TRIP OF HP AIR COMPRESSORS AND FORWARD CALIBRATION CERTIFICATE TO SHIP. QUOTE SEPERATELY FOR RENEWAL
CALIBRATE HIGH TEMP SWITCH OF HP AIR COMPRESSORS AND FORWARD CALIBRATION CERTIFICATE TO SHIP. QUOTE SEPERATELY FOR RENEWAL
CALIBRATE ALL INSTRUMENTATION AND SAFETIES INCLUDING FUNCTIONAL TEST OF RELIEF VALVES.
DISPLAY TO BE PROCURED AND REPLACED AS PER SAMPLE.
CALIBRATE FRESH WATER PRESSURE CUTOUT. PROVIDE CALIBRATION CERTIFICATE TO SHIP. QTY- 01 CUT OUT- 04 BAR CUT IN - 02 BAR
INSPECT ALL PCBS/ELECTRICAL PARTS OF CONTROL PANEL.(ALL ELECTRICAL CIRCUIT BOARD AND SOLIOD VV )
QUOTE FOR OVERHAULING/PROCUREMENT AND REPLACEMENT OF INJECTOR TEST KIT
EMERGENCY STOP PROVISION FOR FOLLOWING FER AND AER MACHINERY TO BE CHECKED AND DEFECT IF ANY TO BE RECTIFIED:- (A)ME L/O ST BY PP- 02 (B) M/E L/O PRIMING PP- 02 (C) E/R SUPPLY FAN- 04(D) E/R EXHAUST FANS- 04 (E) L/O PURIFIER- 02 (F) FUEL OIL PURIFIER- 02 (G) F/O FEED PP- 02(H) L/O TRANSFER PP (J) RG L/O ST/ BY PP- 02 (K) PACKAGE A/C IN MCR
AUTO OPERATION OF HALON SYSTEM NON OPS. DEFECT TO BE RECTIFIED.
AUTO VENTILATION CUTOFF NON OPS, DEFECT TO BE RECTIFIED.
OVERHAULING /DEFECT RECTIFICATION OF EXISTING CONTROL PANEL AND LAYING OF DAMAGED CABLES
CONTROL PANEL. THE SCOPE OF WORK AS FOLLOWS: CAPSTAN. 415V, 3PH, 50HZ DL.NO.2052.9
REMOVE THE CONTROL PANEL FROM SHIP AND SHIFT IT TO SHIPYARD SHOP FLOOR. COMPLETE SERVICING CARRIEDOUT TO THE SATISFACTION OF SS/HSL/NAVY TRIAL AGENCIES. CONTROL PANEL TO BE OFFERED FOR TRIALS TO SS AFTER ASSEMBLING AT SHOP FLOOR. FIT THE CONTROL PANEL IN SHIP WITH EARTHING STRAP AND TAKE TRIALS WITH MOTOR.
ALL TALLEY, COMPONENTS AND CABLE TO BE REMOVED FROM STARTER AND STARTER BODY TO BE PAINTED. (1 COAT RED OXIDE & 2 COATS SMOKE GREY ENAMEL PAINT) INCLUDING PROCUREMENT OF PAINT BY VENDOR.
ALL INTERNAL WIRING, INDICATION, TERMINAL BLOCKS, PUSH BUTTON, KNOBS AND TO BE PROCURED AND REPLACED.
OVER LOAD RELAYTO BE REPLACED AFTER CALIBRATION. CALIBRATION CERTIFICATE TO BE PROVIDED TO SS.
REPLACE THE CONTACTS OF MAIN CONTACTORS .
PORTABLE REMOTE CONTROL TO BE PROCURED AND REPLACED WITH PUSH BUTTON
RENEWAL OF DEFECTIVE SAFETY SWITCHES FOR SAFETY.
OVERHAULING/DEFECT RECTIFICATION OF EXISTING CONTROL PANEL AND LAYING OF DAMAGED CABLES
REMOVE THE CONTROL PANEL FROM SHIP AND SHIFT IT TO SHOP FLOOR. FIT THE CONTROL PANEL IN SHIP WITH EARTHING STRAP AND TAKE TRIAL WITH MOTOR. CONTROL PANEL TO BE OFFERED FOR TRIAL TO SS AFTER ASSEMBLING AT SHIPYARD SHOP FLOOR.
ALL TALLEY, COMPONENTS AND CABLE TO BE REMOVED FROM STARTER AND STARTER BODY TO BE PAINTED (1 COAT RED OXIDE & 2 COATS SMOKE GREY ENAMEL PAINT) INCLUDING PROCUREMENT OF PAINT BY VENDOR.
ALL INTERNAL WIRING, INDICATIONS (04 NOS), TERMINAL BLOCKS, PUSH BUTTON (04 NOS) AND KNOBS (02 NOS) CONTACTOR TO BE REPLACED.
OVER LOAD RELAY (45-60 AMPS) TO BE CALIBRATED. CALIBRATION CERTIFICATE TO BE PROVIDED TO SS.
REPLACE THE CONTACTS OF MAIN CONTACTORS .
WITH PUSH BUTTON OF PORTABLE REMOTE CONTROL TO BE REPLACED
RENEWAL OF DEFECTIVE SAFETY SWITCHES FOR SAFETY.
STARTER (415V, 3PH, 50HZ, 88HP) THE SCOPE OF WORK AS FOLLOWS: QTY: 02 NOS SHIPS STABILISATION. MAKE: VOSFER THRONY CRAFT LTD, MODEL : STB SYS DL.NO.2029.2
REMOVE THE STARTERS (02 NOS) FROM SHIP AND SHIFT IT TO SHOP FLOOR FOR OVERHAULING. COMPLETE OVERHAULING TO BE CARRIEDOUT TO THE SATISFACTION OF SHIPSTAFF/HSL/NAVY TRIAL AGENCIES.
ALL TALLEYS, COMPONENTS AND CABLES TO BE REMOVED FROM STARTER AND STARTER BODY TO BE PAINTED (1 COAT RED OXIDE & 2 COATS SMOKE GREY ENAMEL PAINT) INCLUDING PROCUREMENT OF PAINT BY VENDOR.
ALL INTERNAL WIRING, INDICATION(24V) - 16 NOS, TERMINAL BLOCKS AND KNOB (04 EACH) TO BE PROCURED AND REPLACED.
OVER LOAD RELAY TO BE CALIBRATED AND CERTIFICATE TO BE PROVIDED TO SS.
SHARP ELECTRICAL AND MECH ENGG SERVICES
SRI VENKATA SAI CONSTRUCTION
Patel Engineering Works Vizag
MANIKANTHA ELECTRICAL RE-WINDING WORKS
RAO ELECTRICAL ENGINEERING WORKS
SMEC Automation Pvt Ltd
DELTA MARINE ENGINEERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .