Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-AOC | ₹2.2 Cr | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.3 Cr+₹12.0 L (5.48%)Rejected-AOC | ₹2.3 Cr+₹12.0 L (5.48%) | 2 | Rejected-AOC Rejected |
| 3 | 3₹2.3 Cr+₹14.8 L (6.76%)Rejected-AOC | ₹2.3 Cr+₹14.8 L (6.76%) | 3 | Rejected-AOC Rejected |
| 4 | 4₹2.4 Cr+₹23.0 L (10.5%)Rejected-AOC 6 11 VEDHA NAGAR MEDU FIRST STREET NEAR CHINMAYA VIDAYALAYA SCHOOL CHINMAYA NAGAR STAGE II VIRUGAMBAKKAM CHENNAI 600 092 | CHENNAI | TAMIL NADU | 600092 | ₹2.4 Cr+₹23.0 L (10.5%) | 4 | Rejected-AOC Rejected |
| 5 | 5₹2.6 Cr+₹39.0 L (17.8%)Rejected-AOC SANJEEVARAYAPURAM AVANIYAPURAM POST VANDAVASI TK 604504 TIRUVANNAMALAI 4 | VANDAVASI | TIRUVANNAMALAI | TAMIL NADU | 604504 | ₹2.6 Cr+₹39.0 L (17.8%) | 5 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
7 Mar 2024, 3:00 pmClosed
Superintending Engineer, Contracts and Monitoring
Superintending Engineer, Contracts and Monitoring, 4th Floor, CMWSS Board
Outsourcing for Comprehensive Operation and Maintenance work for Madhavaram Booster station for 3 years in Regional Office II
2024_CMWSS_431749_1
CNT/WSS/MWB/3583A/2023-24
Open Tender
Maintenance Services
Item Rate
1095 days
Chennai
Class IB and IIIA and above
4 documents required · 4 mandatory
₹0
₹1.7 L
19 Nov 2024
28 Feb 2024
8 Mar 2024
28 Feb 2024
7 Mar 2024
1 Mar 2024
Amount
Bill No - A I - Cost towards pumped quantity
Operation and maintenance of Madhavaram booster by providing required qualified and experienced engineers, skilled and unskilled personal to carryout all the mandatory duties listed and as per the maintenance schedule enclosed. including ESI & EPF as per the norms and all insurance for the manpower and for machinery along with uniform, Identity card, safety equipments, tools, grease, oil, cotton waste, gland packing rope, house keeping and garden maintenance etc complete for 3 years quantity. (Cost to be arrived by considering Annexure IX & DFata provided for fixed cost)
For First Year
For Second Year
For Third Year
Bill No - B II - Supply, Delivery and Replacement of spares
Two pole structure
Servicing of AB switch
Replacement of dropout fuses
Replacement of lighting arrester
Replacement of pin insulator
Replacement of Horn gap unit
Painting of two pole structure
Replacement of aluminium bus bar
Replacement of knife of AB switch
HT end termination including compound
120-185 sqmm 3 core HT cable outdoor terminations XLPE 11KV (E) - EPKT 3362
350 KVA Transformer
Transformer oil filteration
Replacement of tap changing mechanisum
Replacement of air breather and silica gel
Replacement of dial thermo meter
Replacing of terminal bush (HT)
Spray painting to the transformer
Replacement of Transformer Oil.
Transformer winding including transportation charges.
Transformer yard earthing using copper flat and twin earthing as per IS
60 HP Induction Motor
Dismantling the motor from the unit bed and trasporting the motor from site to Workshop
Rewinding of stator (1450 RPM)
Replacement of 60 Hp Rotor bars
Improving the insulation value by varnishing and heating
Replacement of Drivind end bearings
Replacement of Non Driving end bearings
Replacement of bearing end covers
Replacement of terminal block with cable socket including termination etc completeplate
Replacement fan / fan blade
Reconditioning of motor shaft true to axis
Reconditioning of motor shaft by metalising and turning
Reconditioning of bearing end covers by metalising and providing sleeve
Re- assembly, testing, transportation charges from workshop to site etc complete.
60 HP Centrifugal pump
Dismantling the pump from bed and transportation the pump from site to workshop etc.
suply and fixing suitable G.M bushes for pump shaft.
provding G.M Guide rings for impleller
providing bearing lock nut and grease cup
Replacement of pump gland studs and nuts etc.
Renewal of ball bearings.
suply and fixing of flexible fenner make coupling pulley tyre with neesssary bolts and nuts
Repairing and reconditioning of pump shaft and impeller
Re-assembling, aligning with motor, testing on load at site including painting ransporation charges etc.
Providing new key ways, key.
Reconditioning of impeller by metalising, turning & dy.bl..
Providing impeller nut.
Providing new taps and new studs.
Providing dummy plate with rubber insertion and bolt and nuts.
Reconditioning of pump shell by metalising and turning
Providing new tape for priming line and with gate valve(1" valve)
Reconditioning of base plate, providing base bolts including welding and civil work
Replacement of base plate, providing base bolts
Reconditioning of bearing housing
60 HP Auto Transformer Starter
Replacement of main contacts
Replacement of star contacts
Replacement of delta contact
Replacement of worn out ammeter and voltmeter etc.
Replacement Of over load relay
Repairing and rewiring of complete starter panel circuit with on off control switch etc.
complete assembling, painting and testing on load at site etc.
Replacement of fuse unit - HRC.
Replacement of fuse links.
Replacement of pilot lamp indicator with holder.
Replacement of hour meter.
Replacement of single pole two way switch.
Replacement of timer electronic.
Replacement of no volt coil.
Replacement of current transformer.
Rewiring the power and control cable.
Replacement of single phase preventor and phase preventor.
Rewinding the auto transformer coil.
Replacement of transformer oil
30 HP Induction Motor
De-coupling the motor from its pump, dismantling, transporting charges from site to workshop
Rewinding of stator coil with high class insulation enamel coper wire and necessary insulation paper with sleeve varnished etc complete
Rewinding of Rotor Bars (1450 RPM)
Improving the insulation value by varnishing and heating
Replacement of bearings
Replacement of bearing end covers
Replacement of terminal plate
Replacement fan / fan blade
Termination of cable from motor insulation wire
Reconditioning of motor shaft true to axis
Reconditioning of motor shaft by metalising and turning
Reconditioning of bearing end covers by metalising and providing sleeve
Dismantling, refixing, painting, aligning and testing on load
Transport charges
30 HP Centrifugal pump
Dismantling the pump from bed and transportation the pump from site to workshop
Reconditioning of pump shaft and impeller by metalising, turning, facing etc complete
Replacement of ball bearings with suitable make SKF
Replacement of pump G.M. bush
Reconditioning of bearing housing for both sides
Replacement of pump gland bush with suitable studs and nuts etc complete
Providing coupling pulley with flexible fenner make coupling tyre including bolts and nuts etc complete.
Providing G.M guide ring for pump impeller
Reassembling, aligning with motor testing on load at site including painting, transporting charges etc complete.
Replacement of shaft
Replacement of studs.
Providing dummy plate with rubber insertion and bolt and nuts.
Providing new tape for priming line and with gate valve(1" valve)
Reconditioning of base plate, providing base bolts including welding and civil work
Replacement of base plate, providing base bolts
Replacement oil seal
30 HP Star Delta Starter
Replacement of fuse unit - HRC
Replacement of fuse links
Replacement of pilot lamp indicator with holder
Replacement of push button with kit
Replacement of volt meter
Replacement of Ammeter
Replacement of hour meter
Replacement of single pole two way switch
Replacement of contactors
Replacement of over load relay
Replacement of timer electronic
Replacement of no volt coil
Replacement of current transformer
Rewiring the power and control cable
Replacement of single phase preventor and phase preventor
60 HP VFD starter
Replacement of 100A fuse unit with fuse link
Replacement of 10A single pole MCB
Replacement of 6A double pole MCB
Replacement of 6A single pole MCB
Replacement of pilot lamp indicator lamp
Replacement of push button with kit
Replacement of 9A power contactor
Replacement of CT disconnector terminal block
Replacement of 6" cooling fan
Replacement of 6" air filter
Replacement of rated insulatd voltage of 1100V AC + /-10Y variation
Replacement of rated frequency drive 50HZ
Replacement of IP 42 degree of protection
Rewiring of 1.5sqmm control wiring as per specification required
End termination suitable for existing 60HP centrifugal pumpset etc complete
200 KVA DG Set
Rewinding of alternator stator
Rewinding of alternator rotor
Improving the IR value by varnishing and heating eyc complete
Replaement of terminal plate
Replacement of terminal studs and lugs
Replacement of carbon brushes
Replacement of brush holder
Replacement of AVR
Dismantling, refixing, painting, transporting, aligning and testing etc
Replacement of bearings
Replacement of rectifier unit
Replacement of commutator assembly
Replacement of radiator.
Repairs to radiator by welding and providing metal paste etc
Replacement of fan belt
Replacement of fuel circulator hose
Replacement of water circulation hose with clamp
Replacement of air filter
Replacement of oil filter
Servicing of the self motor
Repairs to self motor control circuit wire
Replacement of engine oil
Replacement of nozzle
Replacement of speedo meter cable
Service of engine with gasket
Replacement of fuel filter
Replacement of silencer pipe
Replacement of aspestos rope
Replacement of muffler
Calibration of fuel pump
Replacement of battery with terminals and cables
Replacement of pressure cage
Replacement of coupling unit
Replacement of MCB control
Replacement of frequency meter
Replacement of energy meter
Replacement of hour meter
Replacement of change over switch
Rewiring of control panel
63 KVA DG Set
Rewinding of alternator stator
Rewinding of alternator rotor
Improving the IR value by varnishing and heating eyc complete
Replaement of terminal plate
Replacement of terminal studs and lugs
Replacement of carbon brushes
Replacement of brush holder
Replacement of AVR
Dismantling, refixing, painting, transporting, aligning and testing etc
Replacement of bearings
Replacement of rectifier unit
Replacement of commutator assembly
Replacement of radiator.
Repairs to radiator by welding and providing metal paste etc
Replacement of fan belt
Replacement of fuel circulator hose
Replacement of water circulation hose with clamp
Replacement of air filter
Replacement of oil filter
Servicing of the self motor
Repairs to self motor control circuit wire
Replacement of engine oil
Replacement of nozzle
Replacement of speedo meter cable
Service of engine with gasket
Replacement of fuel filter
Replacement of silencer pipe
Replacement of aspestos rope
Replacement of muffler
Calibration of fuel pump
Replacement of battery with terminals and cables
Replacement of pressure cage
Replacement of coupling unit
Replacement of MCB control
Replacement of frequency meter
Replacement of energy meter
Replacement of hour meter
Replacement of change over switch
Rewiring of control panel
130 KVAR Capacitor
Replacement of 32A contactor
Replacement of capacitor
Replacement of pilot lamp indicator
Replacement of push button with kit
Rewiring the power and control cable
Replacemnt of Automatic power factor controller
Incoming MCC Panel Board
Replacement Three phase Digital Voltmeter.
Replacement Three phase Digital Ammeter.
Replacement of 200A MCCB .
Replacement of 250A MCCB .
Replacement of 630A change over switch.
Lighting
Replacement of 80 watts LED Street Light Fitting
Replacement of 20W 4 Feet LED fitting with LED.
Replacement of 20A MCB DP
Replacement of 6Amps MCB.
Replacement of 40A 4 pole MCB .
150mm Sluice Valve
Replacement of spindle rod SS.
Replacement of spindle rod nut.
Rethreading, mechining the existing shaft.
Replacement of bolts and nuts MS with rubber.
Dismantling and refixing etc.
Replacement of gland with studs.
Replacement of sluice valve labour.
Reconditioning of disk with lining.
Replacement of brackets.
Provision of operating key rod.
250mm Sluice Valve
Replacement of spindle rod SS.
Replacement of spindle rod nut.
Rethreading, mechining the existing shaft.
Replacement of bolts and nuts MS with rubber.
Dismantling and refixing etc.
Replacement of gland with studs.
Replacement of sluice valve labour.
Reconditioning of disk with lining.
Replacement of brackets.
Provision of operating key rod.
300mm Sluice Valve
Replacement of spindle rod SS.
Replacement of spindle rod nut.
Rethreading, mechining the existing shaft.
Replacement of bolts and nuts MS with rubber.
Dismantling and refixing etc.
Replacement of gland with studs.
Replacement of sluice valve labour.
Reconditioning of disk with lining.
Replacement of brackets.
Provision of operating key rod.
600mm Sluice Valve
Replacement of spindle rod SS.
Replacement of spindle rod nut.
Rethreading, mechining the existing shaft.
Replacement of bolts and nuts MS with rubber.
Dismantling and refixing etc.
Replacement of gland with studs.
Replacement of sluice valve labour.
Reconditioning of disk with lining.
Replacement of brackets.
Provision of operating key rod.
1000Amps Air Circuit Breaker
Replacement of fixed contacts.
Replacement of moving contacts.
Replacement of no volt coil.
Replacement of hylem plate.
Replacement of fuse unit.
Rewiring of control circuit
Replacement of charging motor
Replacement of arcing contacts
Replacement of arcing choke .
Replacement of shutter assembly
Dismantling, assembling and testing on load.
630 Amps Aircuit Breaker
Replacement of fixed contacts.
Replacement of moving contacts.
Replacement of no volt coil.
Replacement of hylem plate.
Replacement of fuse unit.
Rewiring of control circuit
Replacement of charging motor
Replacement of arcing contacts
Replacement of arcing choke .
Replacement of shutter assembly
Dismantling, assembling and testing on load.
CABLES
Supply and laying of 3.5 core 35 sqmm LTUG cable in a trench to be excavated at the depth of 2.5" putting 6" layer sand and conveying the cable with brick and sand refilling te earth to make good. 30Hp MCB to Starter
Supply and laying of 3.5 core 70 sqmm LTUG cable in a trench to be excavated at the depth of 2.5" putting 6" layer sand and conveying the cable with brick and sand refilling te earth to make good. Starter Panel to 60Hp Motor
Supply and laying of 3.5 core 95 sqmm LTUG cable in a trench to be excavated at the depth of 2.5" putting 6" layer sand and conveying the cable with brick and sand refilling te earth to make good. 60Hp MCCB to Starter Incomer
Supply and laying of 3.5 core 240 sqmm LTUG cable in a trench to be excavated at the depth of 2.5" putting 6" layer sand and conveying the cable with brick and sand refilling te earth to make good. Transformer to LT Panel
Supplying and clamping of 3.5 .core 25 sqmm PVC LTUG cable by MS clamps on wall. 30Hp Starter to Motor
Supplying and Fixing of cable gland and termination with aluminium cable by 3.5 core 240sqmm pvc ug cable with earth connection.
Supplying and Fixing of cable gland and termination with aluminium cable by 3.5 core 95sqmm pvc ug cable with earth connection
Supplying of 240-300 sqmm 3.5 core LTUG cable straight through jointing kit including labour cost and jointing materials etc complete.
Diesel Pumpset for Dewatering
Hire Charges for Diesel pumpset for 10HP
Attending leaks in pipes & specials including earthwork excavation ,cost of jointing materials and labour charges etc inside the pumphouse
Replacement of specials & pipes
K9600mm D/F Pipes 5.5mm Long
600mm D/F Pipe bend 90degree
250mm dia Non Return Valve
150mm dia Non Return Valve
150mm dia Sluice Valve
300mm dia Sluice Valve
150mm dia DI D/F pipe 1 m long.
150mm dia DI D/F pipe 5.5 m long.
200mm dia DI D/F pipe 2 m long.
300mm dia DI D/F pipe 1 m long.
300mm dia DI D/F pipe 2 m long.
300 x 200 mm dia DI D/F Reducer
200 x 150 mm dia DI D/F Reducer
200mm dia DI 900 D/F bend
300mm dia DI 900 D/F bend
Bill No - C III - Cost towards white/colour washing and painting
White washing two coat (old work) in madhavaram booster pump house.
Painting with two coats of ready mixed plastic emulsion paint first class quality and of approved colour over a priming coat including thorough scrapping clean removal of dirt etc, complete and including necessary plaster of paris, putty, etc wherever required in pump house. (SOR P,No 104 SL.No 15.17 2022-23)
White washing two coat (old work) in DG room(63KVA).
Painting with two coats of ready mixed plastic emulsion paint first class quality and of approved colour over a priming coat including thorough scrapping clean removal of dirt etc, complete and including necessary plaster of paris, putty, etc wherever required in DG room.
White washing two coat (old work) in DG room(200KVA).
Painting with two coats of ready mixed plastic emulsion paint first class quality and of approved colour over a priming coat including thorough scrapping clean removal of dirt etc, complete and including necessary plaster of paris, putty, etc wherever required in sump.
White washing two coat (old work) in madhavaram booster pump house.
Painting with superior quality ready mixed paint of chocolate, light green, grey or any other approved colour for Old iron work two coats.
Sub Total (excluding GST)
RAJU ENGINEERING ENTERPRISES
Thirumalai Enterprises
Kalaichandran&Co
R RADHAKRISHNAN
SIVASAKTHI ENTERPRISES
PNP CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .