| 1 | L1₹1.1 CrAccepted-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹22.1 L (20.8%)Rejected-AOC 17 6 FLAT NO 06 SAROJ MANSION BUILDING 6TH STREET NANDANAM EXTENSION NANDANAM CHENNAI TAMIL NADU 600035 | CHENNAI | TAMIL NADU | 600035 | ₹1.3 Cr+₹22.1 L (20.8%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
19 May 2022, 3:00 pmClosed
GM SgTPP
Admin building Manigram Murshidabad SGTPP WBPDCL PIN 742237
Unit 2 Boiler Overhauling for pressure parts Safety Valves Soot Blowers for Boiler efficiency improvement Steaming license renewal at SgTPP
2022_WBPDC_374746_1
WBPDCL/SGTPP/NIT/E1826/21-22
Open Tender
Support/Maintenance Service
Lump-sum
21 days
SGTPP WBPDCL
As per NIT
3 documents required · 3 mandatory
₹0
₹2.5 L
Yes
Admin building Manigram Murshidabad
24 Jun 2022
8 Apr 2022
24 May 2022
8 Apr 2022
19 May 2022
8 Apr 2022
15 Apr 2022
Overhauling of boiler drum
Scaffolding of FSH,PLSH,MRH,FRH
Cleaning of furnace Zone, Div. panel, steam tube, PLSH,MRH,FRH by HP water Jet.
Insertion of tube FSH,PLSH,RH,LTSH (Except LTSH bottom bank),Joint.
Removal and fitting of guard tube, guard plate.
Removal and fitting of Cassette Baffle of dimension 2200X500X58.
Scaffolding of Economiser Zone and cleaning of Economiser Zone and LTSH by LP water.
Inspection and run welding of economiser Hopper , All bracing pipe inspection , changing as per requirement, guard angle fitting upto APH inlet damper..Run welding of other area like Boilerdrum floor vent flush box and drain related pipe etc.(Running Meter).
Insertion of water wall tube ,economiser tube,LTSH bottom bank (Joint).
Supply and errection of scaffolding materials for furnace and other areas(LOT).
Sealing at top of bottom ash hopper by wooden planks, GI sheet and gunny bags(LOT).
Deposition of weld metal on tubes /stubs /header etc.
LTSH coil pulling , inspection and proper alignment of coil and pannel with clit and support welding.
Economiser coil lifting,inspection repairing and fitting with proper alignment(per coil/panel).
Div.panel,platen, Final SH,Middle RH, Final RH coil pulling ,inspection and proper alignment of coil and panel with clit and support welding (per coil/panel).
Replacement of HP valve of size 1# by straight tube or new valve.
Replacement of HP valve of size 2# by new valve.
Fitting of manual valve of size 4# at EBD line with approach platform(without SR & Radiography).
Fitting of manual valve of size 4# at Start up (without SR & Radiography) vent with approach platform.
Fabrication of different sizes of bends, U-loops etc.
Replacement of boiler metal temp. probe.
Welding of membrane strips/Skin casing for boiler.
D-metering of boiler tubes in all the high pressure zones of the boiler viz. LTSH, Economiser, platen SH, Medium R/H, Final R/H, Final S/H, Screen and cage wall, furnace wall, roof tubes etc.
Radiography of pressure parts welding joints.
Stress relieving of welding joints
Trivy test and Assistance to trivy test for Drum, SH,CRH&HRH.
Removal and repairing of refractory works at boiler Pr. parts area.
Arrangement of 1 no. crane /hydra(8ton) with fuel and operator.
Servicing of manholes and peepholes of boilers.
Seal plate and Deeper plate of trough seal Removing, Repairing and Replacement.
Inspection and Correction of buckstay and Steelwork.
Pressure parts area miscellaneous job
Stub joint dye penetrant testing (Limited to 10% of total stub joint).
MAGNETIC PARTICLE TEST (MPT)
Economiser coil taking outside at designated repairing site & refitting & inspection (including coil replacement)(Per Coil/Panel).
Safety valve Overhauling of DN 80 Drum Safety valve (Model-1749WB).
Safety valve Overhauling of DN 65 Superheat Safety valve (Model-1730WD).
Safety valve Overhauling of DN 100 HRH Safety valve (Model-1765WD).
Safety valve Overhauling of DN 150 CRH Safety valve (Model-1705RWB).
Safety valve Overhauling of DN 250 Aux hdr Safety valve.
Safety valve seat cutting
Boiler External cleaning by air & fire water.
HANGER SUPPORT OH WORK
ENGAGEMENT OF BEST EXPERT FOR HANGER SUPPORT OH WORK.
ENGAGEMENT OF EX-BHEL EXPRT FOR BOILER PRESSURE PART AND SAFETY VALVE.
Assistance of reheater hydro test
BOILER INSPECTOR SUNDRY EXPENSES (OTHER THAN FEES).
Installation of size 150NB isolating valve including line modification.
Assistance for RLA works.
Hiring of reciprocating pump for departmental & Inspector hydro test at 250kg/cm2.
BROTHERS ENGINEERING AND ERECTORS LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .