| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 CrAccepted-AOC | ₹5.0 Cr | L1 | Accepted-AOC Lowest and reasonable amount |
| 2 | L2₹6.1 Cr+₹1.1 Cr (22.4%)Rejected-Finance | ₹6.1 Cr+₹1.1 Cr (22.4%) | L2 | Rejected-Finance Quoted higher and unreasonable amount |
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
18 Nov 2024, 6:00 pmClosed
OFFICER COMMANDING,425 (I) FIELD COMPANY
OFFICER COMMANDING,425 (I) FIELD COMPANY
CONSTRUCTION OF MARINE WORKSHOP SHELTER WITH EOT CRANES 24X18 M S and C CoW AT LAKKINALA KACHCHH GUJARAT
2024_ARMY_675116_2
0407/24-25
Open Tender
Civil Works
Lump-sum
270 days
LAKKI NALA KACHCHH BHUJ
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
Yes
OFFICER COMMANDING,425 (I) FIELD COMPANY
₹3.9 L
Yes
Bhuj
20 Dec 2024
28 Oct 2024
20 Nov 2024
28 Oct 2024
18 Nov 2024
11 Nov 2024
30 Oct 2024 - 6 Nov 2024
2 Nov 2024
Amount
SCHEDULE ‘A’ PART- I(A) (PRE-ENGINEERED BUILDINGS) (TO BE QUOTED BY BIDDER) Design, manufacture, supply and installation of (Pre Engineered Building) for Marine Wksp Shelter as per plan attached, structure shall be with steel framed structure with steel stanchions, steel truss duly painted, roof with galvalume sheet with thickness 0.60mm of high tensile cold rolled steel as per IS 1397, coating class AZ 150 sheet including purlins and rafters, truss, including motorised hanger door motorised gate openable for 10 mtr width including wicket gate of size 0.9m x 2.1m, RCC pile foundation, complete all as specified and designed as per plan, elevation & section and part site plan drawings.
SCHEDULE ‘A’ PART- I(B) ( BUILDING WORKS) Lump sum price worked out by the contractor for "BUILDING WORKS" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-I (B) (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 86
SCHEDULE ‘A’ PART- II ( INTERNAL ELECTRIFICATION) Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-II (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 87
SCHEDULE ‘A’ PART- III ( INTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-III (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 90
SCHEDULE ‘A’ PART- IV (EOT CRANES) Lump sum price worked out by the contractor for "EOT CRANES" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-IV (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 94
SCHEDULE ‘A’ PART- V (FURNITURE) Lump sum price worked out by the contractor for "FURNITURE" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-V (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 95
SCHEDULE ‘A’ PART- VI (EXTERNAL ELECTRIC SUPPLY) Lump sum price worked out by the contractor for "EXTERNAL ELECTRIC SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VI (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 96
SCHEDULE ‘A’ PART- VII (EXTERNAL WATER SUPPLY) Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 99
SCHEDULE ‘A’ PART- VIII (FIRE FIGHTING) Lump sum price worked out by the contractor for "FIRE FIGHTING" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-VIII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 102
SCHEDULE ‘A’ PART-IX (SUMMER APPLIANCES) Lump sum price worked out by the contractor for "SUMMER APPLIANCES" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-IX (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 103
SCHEDULE ‘A’ PART-X (AIR COMPRESSOR) Lump sum price worked out by the contractor for "AIR COMPRESSOR" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-X (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 104
SCHEDULE ‘A’ PART-XI (LIGHTING PROTECTION) Lump sum price worked out by the contractor for "LIGHTING PROTECTION" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XI (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 106
SCHEDULE ‘A’ PART-XII (SEWAGE DISPOSAL) Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 107
SCHEDULE ‘A’ PART-XIII (AREA DRAINAGE) Lump sum price worked out by the contractor for "AREA DRAINAGE" as calculated and estimated by the bidder as per technical specifications, tender documents, Schedule ‘A’ Part-XIII (minimum which needs to be provided) attached and duly considering the last item of No Deviation Clause of this BoQ, representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the Ministry of Defence B/F from Sl page No 110
NOTE APPLICABLE FOR ALL ITEMS :- If rate quoted for similar/identical items in same part of Sch ‘A’ is at variance, the lowest rate quoted shall only be considered for payment to the contractor. The quantities mentioned in the schedules and BoQ are minimum that needs to be provided, any addition in quantities, item, a superior design/mix as necessitated by the vetted design from IIT/NIT or as per the prevalent ground condition shall be deemed to be catered by the bidder as part of Lump sum contract of entire scope of bid. No deviation from quoted amount shall be considered.
Aman construction (BID ID -3166828)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .