Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹35.2 L
EMD Value
₹70,500
Closing Date
28 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE Manali Division HP PWD Manali
EE Manali Division HP PWD Manali
RRD on manali to Burwa road Km. 0/00 to 8/430 Tehsil Manali Distt. Kullu (SH C/O crated retaining wall with toe wall in CC 1.3.6 and bouler filling etc. at Km. 0/565 to 0/645) under PDNA 2025
2026_PWD_147858_1
RRD on manali to Burwa road Km. 0/00 to 8/430 Tehsil Manali Distt. Kullu (SH C/O crated retaining wa
Open Tender
Civil Works
Percentage
60 days
manali
RRD on manali to Burwa road Km. 0/00 to 8/430 Tehsil Manali Distt. Kullu (SH C/O crated retaining wall with toe wall in CC 1.3.6 and bouler filling etc. at Km. 0/565 to 0/645) under PDNA 2025
5 documents required · 5 mandatory
₹1,500
₹70,500
19 Nov 2026
19 Nov 2026
30 Nov 2026
19 Nov 2026
28 Nov 2026
19 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 198.72 | Per cubic metre | 369.76 | ₹73,478.71 |
| 2 | Providing and laying concrete for plain/ reinforced concrete in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 (CC 1:6:12) within all leads and lift of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 43.2 | Per cubic metre | 4,769.95 | ₹2,06,061.84 |
| 3 | Providing and laying concrete for plain/ reinforced concrete1:3:6 (One cement :three sand : six graded stone aggregate 20mm (twenty millimetre nominal size ) in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 300.4 | Per cubic metre | 6,224.62 | ₹18,69,875.85 |
| 4 | Providing and laying of boulder apron laid in wire crates with 4mm (Four millimetre ) dia GI wire conforming to IS: 280 and IS: 4826 in 100mmx 100mm(One hundred millimetre into One hundred millimetre ) mesh (woven diagonally ) including 10(Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg.(Twenty five kilogram ) each as per drawing and technical specifications clause 1301 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 224.64 | Per cubic metre | 3,193.5 | ₹7,17,387.84 |
| 5 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 Granular material. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 122.8 | Per cubic metre | 1,771.55 | ₹2,17,546.34 |
| 6 | C/O of Embankment with material obtain from borrow pits with alift up to 1.50 mtrs. Transporting with site c;ause 300.1 and 300.2 with alift up to 1000 mtr. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 615.2 | Per cubic metre | 657.67 | ₹4,04,598.58 |
| 7 | Providing weep holes in Brick masonry/Stone masonry Plain/Reinforced concrete abutment, wing wall, return wall with 100 mm dia AC Pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 80 | Each | 424.5 | ₹33,960 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_221208.xls
BOQ • 0.28 MB
BidBurwa3222910.pdf
Tender Documents • 2.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .