Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹64.7 LAccepted-AOC | ₹64.7 L Quoted ₹4.6 Cr | 1 | Accepted-AOC Individual Item Wise L1 |
| 2 | 2₹3.0 Cr+₹24.9 L (5.42%)Accepted-AOC 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | ₹3.0 Cr+₹24.9 L (5.42%) Quoted ₹4.8 Cr | 2 | Accepted-AOC Individual Item Wise L1 |
| 3 | 3₹57.8 L+₹3.9 Cr (85.7%)Accepted-AOC 41 1294 A6 SECOND FLOOR BEEVI COMPLEX C P UMMER ROAD KOCHI ERNAKULAM KERALA 682035 UDYAM KL 02 0026628 32AAECD3143Q1ZL R M | ERNAKULAM | KERALA | 682035 | ₹57.8 L+₹3.9 Cr (85.7%) Quoted ₹8.5 Cr | 3 | Accepted-AOC Individual Item Wise L1 |
| 4 | Rejected-Technical B71 AKSHAY MITTAL INDUSTRIAL CO OPERATIVE SOCIETY BUILDING NO 5 ANDHERI KURLA ROAD MAROL MAROL ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | - | - | Rejected-Technical The firm does not meet the pre-qualification criteria |
Tender Value
Refer Docs
Closing Date
2 Jan 2025, 2:00 pmClosed
DGM(SRM)
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
MISCELLANEOUS JOBS NAVY VESSEL RM0807
2024_CSL_221630_1
CSL/SR1/VKD435
Open Tender
Marine Services
Works
60 days
Karwar/CSL/Cochinport
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
8 Mar 2025
27 Dec 2024
3 Jan 2025
27 Dec 2024
2 Jan 2025
27 Dec 2024
27 Dec 2024 - 2 Jan 2025
Amount
SYSTEM 1
Domestic fresh water system (SERVICE COST)
1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required). 1. Renewal of limit switches (02) 2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure. 3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station. 1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR.
Domestic fresh water system (MATERIAL COST)
1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required). 1. Renewal of limit switches (02) 2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure. 3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station. 1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR.
SYSTEM 2
Domestic Sea water system (SERVICE COST)
Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure
Domestic Sea water system (MATERIAL COST)
Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure
SYSTEM 3
Chilled Water System (SERVICE COST)
1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos 1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. The instrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system. 1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08). 2. Tank level indication for TDACs as well as PDCR to be operationalised. 3. Renewal of RTDs (50) 4. Renewal of pressure switches (20) & Rotameters (10) 1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required. 1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR. 2. Additional thermo pocket for temp sensor to be manufactured and installed. 3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.
Chilled Water System (MATERIAL COST)
1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos 1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. The instrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system. 1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08). 2. Tank level indication for TDACs as well as PDCR to be operationalised. 3. Renewal of RTDs (50) 4. Renewal of pressure switches (20) & Rotameters (10) 1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required. 1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR. 2. Additional thermo pocket for temp sensor to be manufactured and installed. 3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator.
SYSTEM 4
Fire main system (SERVICE COST)
1.17.5 1.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar 3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar. 4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type). 5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10
Fire main system (MATERIAL COST)
1.17.5 1.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar 3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar. 4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type). 5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10
SYSTEM 5
OXYGEN PLANT (SERVICE COST)
1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly
OXYGEN PLANT (MATERIAL COST)
1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly
SYSTEM 6
Chemical Fire Smothering System (07 stations) (SERVICE COST)
1.18.5 Check automatic and remote start of system without HALON release from the extinguishers
Chemical Fire Smothering System (07 stations) (MATERIAL COST)
1.18.5 Check automatic and remote start of system without HALON release from the extinguishers
SYSTEM 7
Foam Fire Fighting System (SERVICE COST)
1.19.6.Carry out maintenance of measuring instruments as per their certificates. - 100Nos 1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System 1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System
Foam Fire Fighting System (MATERAIL COST)
1.19.6.Carry out maintenance of measuring instruments as per their certificates. - 100Nos 1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System 1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System
SYSTEM 8
Drainage Pump (SERVICE COST)
1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.
Drainage Pump (MATERIAL COST)
1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary.
SYSTEM 9
Bekas (Work Boat) ( SERVICE COST)
1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.
Bekas (Work Boat) ( MATERIAL COST)
1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks.
SYSTEM 10
OFB (Officers Boat) (SERVICE COST)
1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02
OFB (Officers Boat) (MATERIAL COST)
1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02
SYSTEM 11
GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST)
Carryout following annual routines on gas analyser.Qty-04 1.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors . 1.86.3 Inspect avcat sampling pump membrane and replace if required .
GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST)
Carryout following annual routines on gas analyser.Qty-04 1.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors . 1.86.3 Inspect avcat sampling pump membrane and replace if required .
SYSTEM 12
Electromagnetic bleed valve (SERVICE COST)
Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30
Electromagnetic bleed valve (MATERIAL COST)
Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30
SYSTEM 13
Resistor-E (SERVICE COST)
3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 of of rezistor-e complex. Calibration of pressure guages 12nos in each system
Resistor-E (MATERIAL COST)
3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 of of rezistor-e complex. Calibration of pressure guages 12nos in each system
SYSTEM 14
Gas detection system (SERVICE COST)
rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective
Gas detection system (MATERIAL COST)
rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective
SYSTEM 15
Vent Flap (SERVICE COST)
Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.
Vent Flap (MATERIAL COST)
Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.
SMEC AUTOMATION PRIVATE LIMITED (BID ID -801614)
DREAMZWELL TECHNICAL SERVICES PVT LTD (BID ID -799903)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .