Tender Value
₹3.6 Cr
EMD Value
₹3.3 L
Closing Date
22 Dec 2025, 3:00 pmClosed
Maintenance of 2 x 25kV Power Supply Installations in Iqbalgadh- Sanand section North section of DFCCIL including connecting line, for a period of 24 (Twenty- Four) months under CGM/DFCCIL Ahmedabad Unit.
DFC-ADI-EL-T-8-25-26~WDFC
DFC-ADI-EL-T-8-25-26
Open
Service - General
24 Months
Ahmadabad, Gujarat
₹0
₹3.3 L
22 Dec 2025
24 Nov 2025
8 Dec 2025
Schedule () 01-Maintenance of Traction Sub Stations: 6679824.74 Below/Par
01 Description:- Monthly Maintenance of 220 kV/55kV, 60/84/100 MVA Traction Power Transformer.
03 Description:- Yearly Maintenance of 132/ 220 kV/55kV, 60/84/100 MVA Traction Power Transformer.
04 Description:- Monthly Maintenance of 132/220kV TP SF-6 Circuit Breaker
05 Description:- Half Yearly Maintenance of 132/220kV TP SF-6 Circuit Breaker
06 Description:- Yearly Maintenance of 132 kV/220kV TP SF-6 Circuit Breaker
07 Description:- Monthly Maintenance of 132/220kV Current Transformer (Protection)
08 Description:- Half Yearly Maintenance of 132/220kV Current Transformer
09 Description:- Yearly Maintenance of 132/220kV Current Transformer (Protection)
10 Description:- Monthly Maintenance of 132/220kV Current Transformer (Metering)
11 Description:- Half Yearly Maintenance of 132/220kV Current Transformer (Metering) WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
12 Description:- Yearly Maintenance of 132/220kV Current Transformer (Metering)
13 Description:- Quarterly Maintenance of 132/220kV Potential Transformer ( Metering PT)
14 Description:- Half Yearly Maintenance of 132/220kV Potential Transformer (Metering PT)
15 Description:- Yearly Maintenance of 132/220kV Potential Transformer ( Metering PT)
16 Description:- Monthly Maintenance of 120/198 kV Lightning Arrester
17 Description:- Half Yearly Maintenance of 120/198 kV Lightning Arrester
18 Description:- Monthly Maintenance of 132/220kV TP Motorised Isolator with or without earthing heel
20 Description:- Yearly Maintenance of 132/220kV TP Motorised Isolator with or without earthing heel
21 Description:- Monthly Maintenance of 55 kV Current Transformer
22 Description:- Half Yearly Maintenance of 55 kV Current Transformer
23 Description:- Yearly Maintenance of 55 kV Current Transformer
24 Description:- Monthly Maintenance of 55/72.2kV DP SF-6 Circuit Breaker
25 Description:- Half Yearly Maintenance of 55/72.2kV DP SF-6 Circuit Breaker
26 Description:- Yearly Maintenance of 55/72.2kV DP SF- 6 Circuit Breaker
27 Description:- Monthly Maintenance of 55 /72.5 kV DP Motorised Isolator without earthing heel
28 Description:- Half Yearly Maintenance of 55/72.5 kV DP Motorised Isolator without earthing heel
29 Description:- Yearly Maintenance of 55/72.5 kV DP Motorised Isolator without earthing heel
30 Description:- Monthly Maintenance of 42/ 60 kV Lightning Arrester
31 Description:- Half Yearly Maintenance of 42/60 kV Lightning Arrester
32 Description:- Monthly Maintenance of 55kV/27.5 kV, 12.3 MVA Auto Transformer
33 Description:- Half Yearly Maintenance of 55kV/27.5 kV, 12.3 MVA Auto Transformer
34 Description:- Yearly Maintenance of 55kV/27.5 kV, 12.3 MVA Auto Transformer
35 Description:- Quarterly Maintenance of 25 kV Potential Transformer Protection PT
36 Description:- Half Yearly Maintenance of 25 kV Potential Transformer Protection PT
37 Description:- Yearly Maintenance of 25 kV Potential Transformer Protection PT
38 Description:- Monthly Maintenance of 25 kV Current Transformer at Auto Transformer
39 WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC 39 Description:- Half Yearly Maintenance of 25 kV Current Transformer
40 Description:- Yearly Maintenance of 25 kV Current Transformer
41 Description:- Monthly Maintenance of 25 kV DP Circuit Breaker
42 Description:- Half Yearly Maintenance of 25 kV DP Circuit Breaker
43 Description:- Yearly Maintenance of 25 kV DP Circuit Breaker
44 Description:- Monthly Maintenance of 25 kV DP Motorised Isolator without earthing heel
45 Description:- Half Yearly Maintenance of 25 kV DP Motorised Isolator without earthing heel
46 Description:- Yearly Maintenance of 25 kV DP Motorised Isolator without earthing heel
47 Description:- Monthly Maintenance of 25 kV DP Interrupter
48 Description:- Half Yearly Maintenance of 25 kV DP Interrupter
49 Description:- Yearly Maintenance of 25 kV DP Interrupter
50 Description:- Quarterly Maintenance of 25kV/240V, 100kVA LT Auxiliary Transformer
51 Description:- Half Yearly Maintenance of 25kV/240V, 100kVA LT Auxiliary Transformer
52 Description:- Yearly Maintenance of 25kV/240V, 100kVA LT Auxiliary Transformer
53 Description:- Monthly Maintenance of 55kV/0.65 kV, 3 MVA Transformer of Capacitor bank.
54 Description:- Half Yearly Maintenance of 55kV/0.65 kV, 3 MVA MVA Transformer Capacitor bank.
55 Description:- Yearly Maintenance of 55kV/0.65 kV, 3 MVA Transformer Capacitor bank.
56 Description:- Quarterly maintenance of 2500 KVAR CAPACITOR Bank Including Series REACTOR
57 Description:- Half yearly maintenance of 2500 KVAR CAPACITOR Bank Including Series REACTOR
58 Description:- Yearly maintenance of 2500 KVAR CAPACITOR Bank Including Series REACTOR
59 Description:- Quarterly Maintenance of 25 kV Neutral Current Transformer
60 Description:- Yearly Maintenance of 25 kV Neutral Current Transformer
61 Description:- Fortnightly battery & battery charger maintenance of TSS
62 Description:- Yearly battery & battery charger maintenance of TSS
63 Description:- Half Yearly maintenance of Earthing station
64 Description:- Yearly Buried Rail Connection
65 Description:- Half Yearly Thermal Imaging of Equipment connector
WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
67 Description:- Yearly maintenance of Cable Trench Cleaning
68 Description:- Reclamation of DCP(5kG,10 kG & 25 kG),CO2(9kG) & form type fire extinguisher.
69 Description:- Refilling of DCP(5kG,10 kG & 25 kG),CO2(9kG) & form type fire extinguisher. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () 02-SP/SSPs/ATS/PP Maintenance 13277751.09 Below/Par
01 Description:- Monthly Maintenance of 8 MVA/ 12.3 MVA Auto Transformer
02 Description:- Half Yearly Maintenance of 8 MVA / 12.3 MVA Auto Transformer
03 Description:- Yearly Maintenance of 8 MVA/ 12.3 MVA Auto Transformer
04 Description:- Monthly Maintenance of 25 kV Current Transformer at Auto Transformer
05 Description:- Half Yearly Maintenance of 25 kV Current Transformer
06 Description:- Yearly Maintenance of 25 kV Current Transformer
07 Description:- Monthly Maintenance of 25 kV DP Interrupter
08 Description:- Half Yearly Maintenance of 25 kV DP Interrupter
09 Description:- Yearly Maintenance of 25 kV DP Interrupter
10 Description:- Monthly Maintenance of 25 kV DP Isolator (Manual )
11 Description:- Half Yearly Maintenance of 25 kV DP Isolator (Manual )
12 Description:- Yearly Maintenance of 25 kV DP Isolator (Manual )
13 Description:- Monthly Maintenance of 25 kV SP Isolator (Manual )
14 Description:- Half Yearly Maintenance of 25 kV SP Isolator (Manual )
15 Description:- Yearly Maintenance of 25 kV SP Isolator (Manual )
16 Description:- Quarterly Maintenance of 25 kV Potential Transformer .
17 Description:- Half Yearly Maintenance of 25 kV Potential Transformer.
18 Description:- Yearly Maintenance of 25 kV Potential Transformer .
19 Description:- Monthly Maintenance of 42 kV Lightning Arrester
20 Description:- Half Yearly Maintenance of 42 KV Lightning Arrester
up to ACDB WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
24 Description:- Fortnightly battery & battery charger maintenance at SCPs
25 Description:- Yearly Maintenance of Battery And Battery Charger
26 Description:- Half Yearly maintenance of Earthing Station
27 Description:- Yearly Maintenance of Earthing station
28 Description:- Yearly maintenance Buried Rail Connection
29 Description:- Monthly Maintenance of 25 kV SP Interrupter
30 Description:- Half Yearly Maintenance of 25 kV SP Interrupter
31 Description:- Yearly Maintenance of 25 kV SP Interrupter
32 Description:- Half Yearly Thermal Imaging of Equipment connector
33 Description:- Yearly Maintenance of Earth Screen Conductor for complete SCP.
34 Description:- Yearly maintenance of Cable Trench Cleaning
35 Description:- Reclamation of DCP (5kG, 10 KG & 25 KG),CO2(9kG) & form type fire extinguisher.
36 Description:- Refilling of DCP (5kG, 10 KG & 25 KG),CO2 (9kG) & form type fire extinguisher. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/
Schedule () 03-Panels & Gantry Bus Bar insulator other Maintenance: 4283235.87 Below/Par
01 Description:- Monthly panel maintenance in TSS
02 Description:- Monthly panel maintenance in SP/SSP
03 Description:- Half yearly Cross gantry or any others Gantry Bus Bar maintenance of TSS
04 Description:- Half yearly Cross gantry or any others Gantry Bus Bar maintenance of SP/SSPs
05 Description:- Half yearly Cross gantry or any others Gantry Bus Bar maintenance of PPs
06 Description:- Removal and re-erection of PSI Equipment
07 Description:- Supply & Erection of Caution Board
08 Description:- Supply and spreading of ballast/Pebbles /Gravels in Switching Stations/TSS yard
09 Description:- Reinforce concrete for cable trench & cover
site requirement with water proof grey enamelled paint by approve brand i.e Asian, Berger etc. as per IS 2932 all latest.
11 WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
wire, Tubular pole at TSS/SP/SSP with Aluminium Paint i.e. Asian Berger etc. as per IS 2339 or latest
12 Description:- Supply and erection of Earth Pit cover & Box
13 Description:- Provision of Shock Treatment Chart
14 Description:- Drilling of holes in mast/ rails with contractor own labour and T&P complete.
exposed as per site requirement
exposed as per site requirement
17 Description:- Supply and erection of 8 SWG GI Wire for earthing. S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit
Schedule () 04-TSS Manning & Housekeeping: (Note: Please quote either "At Above/ 6249739.46 Par" or "Above" in the schedule -04) Below/Par
01 Description:- Regular House Keeping of TSS
02 Description:- Manning of TSS (optional as per requirement )
03 Description:- Manning of SCPs (optional as per requirement) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () 05-Break down attention 630697.04 Below/Par
01 Description:- Breakdown attention of PSI equipments at TSS/SP/SSPs
02 Description:- Maintenance of 25 KV dropout fuse AT TSS/SP/SSP
03 Description:- Manning of SP/SSP in case of Emergency S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () 06-Additional PSI maintenance Activity 2000000.00 Below/Par Lump Sum 2000000.00 AT Par 2000000.00
down/bursting of the equipment- As per Annexure-A S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () 07-Maintenance of Traction Sub Stations /SCPs (Optional) 500000.00 Below/Par Lump Sum 500000.00 AT Par 500000.00
in Tender Document) S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/
Schedule () 08-Schedule for oil testing (Note: Per Unit= Per Sample) 637439.08 Below/Par
01 WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC Description:- Physical Condition & Appearance of Oil (Colour & Order)
02 Description:- Density at Room Temperature
03 Description:- Electric Breakdown Voltage
04 Description:- Moisture Content by Karl Fisher Method
05 Description:- Neutralization Value
06 Description:- Specific Resistance at room temperature & 90 degree C
07 Description:- Dissipation Factor (tan 0) at room temp. & 90 degree C
08 Description:- Interfacial tension test at + room temp
09 Description:- Flash Point
10 Description:- Sediment & Perceptible Sludge
11 Description:- Dissolved Gas Analysis
12 Description:- Furan Analysis
13 Description:- Sample Collection Charges
14 Description:- Transportation Charges S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Code Unit Above/ Schedule () 09-Supply of Tools and Plants 1611150.00 Below/Par
01 Description:- Screw driver 6",8",10"
02 Description:- Cutting pliers 8"
03 Description:- Line tester
04 Description:- Nose Pliers 6"
05 Description:- "Double open ended Spanner (6 to 32 )"
06 Description:- Measuring Tape 5m
07 Description:- Adjustable wrench 8"
08 Description:- Ball pen Hammer 500gm
09 Description:- Combination plier, 280mm
10 Description:- Allen key 2 to 16mm
11 Description:- D shackles 1", 5/8", 3/4"
WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
13 Description:- Crimping tool up to 16mm2 size
14 Description:- Pipe wrench 8", 12"
15 Description:- Contact less thermo meter
16 Description:- Adjustable spanner 8", 12"
17 Description:- Ring spanner (6 - 41)
18 Description:- DE spanner ( 6- 41)
19 Description:- "Double sleeve pulley block 3½ x ½"" groove steel"
20 Description:- Desoldering iron
21 Description:- Soldering iron 60 W
22 Description:- Wire stripping pliers, 150mm
23 Description:- Hydraulic crimping machine up to 300mm2
24 Description:- Manila rope 15, 25mm dia (20 m Each)
25 Description:- Nylon rope 15, 25, 40mm dia (20 m Each)
26 Description:- Digital spirit level
27 Description:- Digital Vernier calliper
28 Description:- Digital micrometer
29 Description:- Round cable and wire cutter, 900mm
30 Description:- Hydraulic jack 50 ton cap
31 Description:- Grease gun
32 Description:- Crow bar 24"x3/4
33 Description:- Bolt cutter 12", 36"
34 Description:- Steel Tape (3m, 5m, 15m)
35 Description:- Sledge hammer 1kg, 5kg
36 Description:- Flat file/250mm
37 Description:- Round file,288m
38 Description:- Triangular file,288 mm
39 Description:- Half round file,250mm
40 WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC Description:- Flat Chiesel, 10"
41 Description:- Pin punch, 10"
42 Description:- Centre punch
43 Description:- Inner circlip pliers straight nose,19-60 mm Capacity
44 Description:- Inner circlip pliers bent nose, 19-60 mm Capacity
45 Description:- Torque Wrench, 60-330 Nm
46 Description:- Bench vise 6"
47 Description:- Digital Earth tester Model No. btc - 96
48 Description:- Aluminium step ladder 16' wall support
49 Description:- Hand held electric blower
50 Description:- Aluminium ladder extensible 36 feet closed
51 Description:- Portable Electric grinder
52 Description:- Acidity testing kit
53 Description:- Portable electric Hand Drill Machine
54 Description:- Pull lift3/4 ton
55 Description:- Digital multimeter
56 Description:- Oil BVD testing kit
57 Description:- Discharge Rod high rise
58 Description:- Pull lift 3 Tonne
59 Description:- Drop out fuse Operating rod
60 Description:- Single Sleeve pulley fiber 3.5"x0.5
61 Description:- Single Sleeve pulley steel 3.5'x0.5
62 Description:- "Al Ladder 8 Meter with Hook on Top"
63 Description:- Single Sleeve pulley steel 6'x1"
64 Description:- Hot stick suitable for High Rise
65 Description:- Clip on Tong Tester
66 Description:- Insulation Tester / Megger 500V
WDFC FIELD UNIT-AHEMDABAD-ELECTRICAL/WDFC
68 Description:- Measuring Tape 30 Meter PVC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDERDOCPSINEW-3.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].