| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAdmitted-Finance | ₹23.7 L | L1 | Admitted-Finance |
| 2 | L2₹24.6 L+₹84,098.72 (3.55%)Admitted-Finance | ₹24.6 L+₹84,098.72 (3.55%) | L2 | Admitted-Finance |
| 3 | L3₹26.8 L+₹3.1 L (13.0%)Admitted-Finance | ₹26.8 L+₹3.1 L (13.0%) | L3 | Admitted-Finance |
| 4 | L4₹34.1 L+₹10.4 L (43.7%)Admitted-Finance | ₹34.1 L+₹10.4 L (43.7%) | L4 | Admitted-Finance |
| 5 | L5₹36.2 L+₹12.5 L (52.7%)Admitted-Finance | ₹36.2 L+₹12.5 L (52.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NANDALAL GHOSH L1 | GIASUDDIN SK L3 | PELICAN DEVELOPMENT L7 | M/S K B CONSTRUCTION AND CO L8 | QADERI ENTERPRISE L2 | ROY & ROY CONSTRUCTION L4 | M/S ANIL KUMAR YADAV L9 | RABI SK L6 | BROTHER CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
E) Beyond 4.00 km and upto 5.00 km | 7,447.48 | Cum | 154.93 ₹11,53,838.08 Lowest | 195 ₹14,52,258.6 | 330 ₹24,57,668.4 | 355 ₹26,43,855.4 | 160 ₹11,91,596.8 | 222.65 ₹16,58,181.42 | 320 ₹23,83,193.6 | 238 ₹17,72,500.24 | 238 ₹17,72,500.24 |
| 2.00 | Supplying and stacking at site . (Overburnt (Jhama) brick aggregate 120 mm to 40 mm) | 1,134.14 | Cum | 457.88 ₹5,19,302.31 Lowest | 665 ₹7,54,206.43 | 550 ₹6,23,779.75 | 597 ₹6,77,084.57 | 503 ₹5,70,474.94 | 657.66 ₹7,45,881.8 | 677 ₹7,67,816.17 | 703.35 ₹7,97,700.89 | 700 ₹7,93,901.5 |
| 3.00 | Supplying and stacking at site. (Moorum) | 270.53 | Cum | 440.75 ₹1,19,236.1 Lowest | 650 ₹1,75,844.5 | 560 ₹1,51,496.8 | 543 ₹1,46,897.79 | 504 ₹1,36,347.12 | 633.34 ₹1,71,337.47 | 677 ₹1,83,148.81 | 677.05 ₹1,83,162.34 | 670 ₹1,81,255.1 |
| 4.00 | Laying water bound macadam sub-base with brick aggregate and binding material, earth etc. including screening, sorting and spreading to template and consolidation with light power road-roller etc. complete.(payment for brick aggregate and moorum etc. to be made separately. (Overburnt (Jhama) brick aggregate 120 mm to 40 mm) | 1,040.5 | Cum | 504.7 ₹5,25,140.35 | 180 ₹1,87,290 Lowest | 500 ₹5,20,250 | 625 ₹6,50,312.5 | 500 ₹5,20,250 | 725.01 ₹7,54,372.91 | 775 ₹8,06,387.5 | 775.27 ₹8,06,668.44 | 760 ₹7,90,780 |
| 5.00 | Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water | 9,218 | Sqm | 5.85 ₹53,925.3 | 12 ₹1,10,616 | 7 ₹64,526 | 4 ₹36,872 Lowest | 4 ₹36,872 Lowest | 8.42 ₹77,615.56 | 7 ₹64,526 | 9 ₹82,962 | 9 ₹82,962 |
Tender Value
₹36.4 L
EMD Value
₹72,900
Closing Date
5 Apr 2025, 6:00 pmClosed
Executive Engineer, Anti Erosion Division
Farakka Barrage Project, P.O. Farakka Barrage, Dist. Murshidabad, West Bengal-742212
As per Tender document
2025_FBPF_854445_1
GM/FBP-51 of 2024-25
Open Tender
Civil Works
Item Rate
90 days
Farakka Barrage Dist. Murshidabad
As per Tender document
2 documents required · 2 mandatory
₹0
₹72,900
Yes
28 Nov 2025
25 Mar 2025
7 Apr 2025
25 Mar 2025
5 Apr 2025
25 Mar 2025
Amount
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. E) Beyond 4.00 km and upto 5.00 km
Supplying and stacking at site . (Overburnt (Jhama) brick aggregate 120 mm to 40 mm)
Supplying and stacking at site. (Moorum)
Laying water bound macadam sub-base with brick aggregate and binding material, earth etc. including screening, sorting and spreading to template and consolidation with light power road-roller etc. complete.(payment for brick aggregate and moorum etc. to be made separately. (Overburnt (Jhama) brick aggregate 120 mm to 40 mm)
Dressing and chilchalling flanks or slope of embankment including filling with earth or cutting upto 150 mm. average thickness and ramming properly after sprinkling water
QADERI ENTERPRISE (BID ID -3197474)
GIASUDDIN SK (BID ID -3197942)
ROY & ROY CONSTRUCTION (BID ID -3198182)
BROTHER CONSTRUCTION (BID ID -3197657)
RABI SK (BID ID -3197656)
PELICAN DEVELOPMENT (BID ID -3198081)
M/S K B CONSTRUCTION AND CO (BID ID -3198102)
M/S ANIL KUMAR YADAV (BID ID -3198178)
stage.html
html • 0.05 MB
technical_898310.pdf
techsummary_898310.pdf
finance_898310.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 1.90 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.50 MB
BOQ_898310.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .