Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC KRISHNAGAR HARISH THAKUR ROAD | BARDHAMAN | WEST BENGAL | 713364 | ₹8.8 L | L1 | Accepted-AOC 1st Lowest Bidder and fulfil all the Terms and condition |
| 2 | L2₹9.8 LRejected-AOC | ₹9.8 L | L2 | Rejected-AOC Not lowest Bidder |
| 3 | L3₹23.3 LRejected-AOC | ₹23.3 L | L3 | Rejected-AOC Not lowest Bidder |
| Sl No | Description | Qty | Unit | RAMKRISHNA TESTING LABORATORY AND CONSULTANCY | VIRAJEE CIVIL TECH & CONSULTANT | Mahamaya Consultants |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of Detailed Project Reports (DPR) as per Latest Guidelines of PMGSY etc. for Rural Road for construction of Roads for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. | 40 | Per Km | 10,76,000 ₹10.8 L | 8,79,960 ₹8.8 L | 9,76,000 ₹9.8 L |
| 2.00 | Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.1) 7.5 m to 15 m span (nos) | 10 | Percentage rate over estimated value | 2,55,690 ₹2.6 L | 17.9 ₹17.90 | 10.5 ₹10.50 |
| 3.00 | Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.2) 15 m to 50 m span (nos) | 20 | Percentage rate over estimated value | 4,99,380 ₹5.0 L | 33.8 ₹33.80 | 23 ₹23 |
| 4.00 | Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.3) 50 m to 150 m span (nos) | 15 | Percentage rate over estimated value | 3,11,070 ₹3.1 L | 23.85 ₹23.85 | 17.7 ₹17.70 |
| 5.00 | Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.4) More than150 m span (nos) | 10 | Percentage rate over estimated value | 1,89,200 ₹1.9 L | 12.9 ₹12.90 | 12.5 ₹12.50 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
22 Dec 2025, 3:00 pmClosed
the Executive Engineer, RD Teliamura Division, Tel
O/o the Executive Engineer, RD Teliamura Division, Teliamura, Khowai District
Preparation of Detailed Project Reports (DPRs) as per Latest Guidelines of PMGSY etc. for Rural Road Projects (Including Bridges, Cross drainage Structures) for the unconnected Habitation under R.D Teliamura Division, Khowai Tripura
2025_CERDD_68299_1
33/DPR/EE/RD/TLM-DIV/25-26 11/12/25
Open Tender
Survey and Investigation services
25 days
As per DNIT
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹50,000
31 Mar 2026
12 Dec 2025
22 Dec 2025
12 Dec 2025
22 Dec 2025
12 Dec 2025
Select, Excess (+), Less (-)
Tender Inviting Authority: The Executive Engineer, RD Teliamura Division
Name of Work: Preparation of Detailed Project Reports (DPRs) as per Latest Guidelines of PMGSY etc. for Rural Road Projects (Including Bridges, Cross drainage Structures) for the unconnected Habitation under R.D Teliamura Division, Khowai Tripura.
DNIT No: e-DT-33/DPR/EE/RD/TLM-DIV/2025-26, Dt.11/12/2025.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Quoted Rate per unit in figures to be entered by the bidder incl. all taxes & charges (GST, IT charges etc) (Rs.) GST (If applicable in Percentage) GST Amount in Rs. P HSN / SAC Code TOTAL AMOUNT excluding taxes in Rs. P TOTAL AMOUNT including taxes Rs. P TOTAL AMOUNT In Words
1 Preparation of Detailed Project Reports (DPR) as per Latest Guidelines of PMGSY etc. for Rural Road for construction of Roads for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. item1 40 Per Km 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.1) 7.5 m to 15 m span (nos) item2 10 Percentage rate over estimated value 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.2) 15 m to 50 m span (nos) item3 20 Percentage rate over estimated value 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.3) 50 m to 150 m span (nos) item4 15 Percentage rate over estimated value 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Preparation of Detailed Project Reports (DPR) for construction of Bridges for unconnected Habitation under R.D Teliamura Division, Khowai Tripura. (2.4) More than150 m span (nos) item5 10 Percentage rate over estimated value 1 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select %
Quoted Rate in Words
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_69490.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
DT-33.pdf
Tender Documents • 1.08 MB
BOQ_69490.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid