Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Ofline Bid Not Submitted |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Ofline Bid Not Submitted |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
12 Dec 2024, 5:00 pmClosed
Executive Engineer
Office of the EE UJS Champawat
Pasam ws Shcheme
2024_UKJS_78511_7
1521/Nivida/112 Dated 30-11-2024
Open Tender
Civil Works - Water Works
Item Wise
90 days
Pasam Lohaghat
Pasam ws Shcheme
2 documents required · 2 mandatory
₹2,950
Yes
EE UJS Champawat
₹63,000
Yes
08-12-2024
13 Dec 2024
5 Dec 2024
13 Dec 2024
6 Dec 2024
12 Dec 2024
6 Dec 2024
5 Dec 2024 - 12 Dec 2024
8 Dec 2024
Amount
Rates for Pasam ws Scheme
Excavation of earth in foundation in soil mixed with shingle,bajri & boulders etc.including lift upto 1.5 m and lead upto 30 m, filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 60 m from the centre of the foundation trenches, including labour, T & P etc. all complete.
P.C.C in 1:2:4 with cement,local sand and 20 mm gauge stone ballast including supply of material, labour ,T&P etc.for proper completion of work.
R.C.C. work with cement coarse sand 10 to 20 mm gauge stone ballast in proportion of 1:1.5:3 excluding supply of reinforcement and bending with 0.5 mm thick bending wire and including necessary centering etc. complete
Steel Reinforcement for RCC Work including straightening,cutting,bending,placing in position and binding all complete upto plinth level
R.R. stone masonry laid dry in foundation & plinth and including supply of material labour T & P etc. for proper completion of work.
Hand Packed stone filling in back of walls including cost of materials, royality,T&P etc complete .
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work.
Supply, Carting , laying , jointing ,fixing ,and testing of G.I. screwed pipes with specials and fittings in trenches under ground, outside the building including cutting, threading etc. complete 1) 15mm dia
2) GI Pipe 20 mm dia
3) GI Pipe 25mm dia
4) GI Pipe 32 mm dia
5) GI Pipe 40 mm dia
6) GI Pipe 50 mm dia
Excavation of pipeline trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete.Soil mixed with Boulder and bazari
Medium Rock
Dismantaling of following dai screwed and socketed G.I Pipes,specials and fittings including taking out of dismantaled G.I pipes and specials from trenches and stcaking them properly with in 50 m but excluding the cost of earth work(Note :- This item shall be paid with the condition that the recoverd pipe from dismentaling is reusable) 1) GI Pipe 25mm dia
4) GI Pipe 32 mm dia
Carting ,Re- laying jointing (including cost of jointing materials like white lead, hemp and oil etc.) fixing and testing of M.S. galvanised screwed and socketed pipes (Medium quality), specials and fittings, including cutting and threading etc. complete 1) GI Pipe 25mm dia
2) GI Pipe 32 mm dia
Supply of all materials, labours, T&P. etc.and construct of sluuice valve/reflex valve chamber (600X600)as per type design complete.
Supply and fixing of the following fittings including materials, labours, T&P etc complete.Providing and fixing gun metaled C.I. Gate / sluice valves as per IS: 788/1997 G (1) 3 MM
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work..
R.R. stone masonry laid dry in foundation & plinth and including supply of material labour T & P etc. for proper completion of work.
Excavation of earth in foundation in soil mixed with shingle,bajri & boulders etc.including lift upto 1.5 m and lead upto 30 m, filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and disposal of surplus earth upto a distance of 60 m from the centre of the foundation trenches, including labour, T & P etc. all complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4(1 Cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8(1 Cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size).
Construction of 25 KL CWR
Supply of all materials, labour T&Petc complete to construct Sump / CWR as per drawing includung cost of all pipes & fittings all complete Capacity of Sump/ 25 KL CWR
Supply of all materials labour T&P etc and install chlorinating chamber as per type design and drawing complete including supply and installation of bucket type chlorinator of 25 liters capacity.
R.R. stone masonry in cement & local sand (1:6) in foundation and Plinth . foundation & plinth including supply of material labour T & P etc. for proper completion of work...
Cartage of Materail
Cartage of Cement from Tanakpur to site of work
Cartage of Sand from Chalthi to site of work
Cartage of GI Pipes from Tanakpur to site of work
Cartage of Grit from Chalthi to site of work
Cartage of Stone Local Quary to site to site of work
harish chandra misra (BID ID -350721)
Shailesh Chandra (BID ID -350677)
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .