Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
8 Jul 2026, 3:00 pm3d left
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Janpad Bareilly ke antragat rohilkhand nahar khand ke niyantradhin nirikshan bhavan faridpur, sahayak abhiyanta karayalaye,jiledari karayalaye evam avason ke punrodhar ka karye.
2026_UPIDC_1164103_1
01/SE/2026-27
Open Tender
Civil Works
540 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹3.9 L
Yes
29 Jun 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m. as per direction of Engineer-in-charge & also including all cost of material, labour & T&P etc. complete. | 302.5 | M3 | - | - |
| 2 | Dismantling door and window chaukhat with hold fast including stacking material with in 60M. & also including all cost of material, labour & T&P etc. complete. | 189.81 | M2 | - | - |
| 3 | Dismantling existing plaster including disposal of refuse with in distance of 60 meters. & also including all cost of material, labour & T&P etc. complete. | 3,040.77 | M2 | - | - |
| 4 | Dismantling C.C. or brick or granolithic floor including base concrete and including stacking of dismantled material with in 60 M distance. & also including all cost of material, labour & T&P etc. complete. | 526.68 | M2 | - | - |
| 5 | Centering and shuttering of C.C. work including rent of shuttering material,labour and T&P required for proper completion of work for slab,lintel,sun shades,columns & walls etc. | 148.61 | M2 | - | - |
| 6 | Laying Brick work C.M.1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. Complete. | 545.57 | M3 | - | - |
| 7 | Centering and shuttering of R.C.C./R.B. work including cost of centering & shuttering upto 3.00 height. | 773.25 | M2 | - | - |
| 8 | Reinforcement including cutting,bending & binding in position including all cost of labour,material and T&P etc.complete at site per M.T. | 19.11 | M.T. | - | - |
| 9 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement,coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc.complete but excluding cost of centering ,shuttering & Reinforcement. | 162.28 | M3 | - | - |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately)Sal wood | 7.79 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
LOT04.pdf
Tender Documents • 2.35 MB
BOQ_2182584.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid