Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹19.2 L+₹2.2 L (13.1%)Rejected-AOC NAGPUR NAGPUR NAGPUR NAGPUR MAHARASHTRA 441102 | NAGPUR | MAHARASHTRA | 441102 | L2 | Rejected-AOC ok | |
| 3 | L3₹28.8 L+₹11.9 L (70.2%)Rejected-AOC D 555 A SECTOR 11 PRATAP VIHAR GHAZIABAD UTTAR PRADESH INDIA 201009 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201009 | L3 | Rejected-AOC ok |
Tender Value
Refer Docs
Closing Date
7 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM CnM
Kawas Gas Power Project P.O. ADITYA NAGAR SURAT 394516
C01142 Installation commissioning testing etc of AC Equipment of Air Conditioning System of Administrative Building at NTPC Mouda
2020_NTPC_44429_1
NTPC/SSC - WR-I(Kawas)/9900212489
Limited
Serv - Others
Service
270 days
Kawas Gas Power Project P.O. ADITYA NAGAR SURAT 39
4 documents required · 4 mandatory
₹0
Exempted
1 Jan 2021
27 Nov 2020
8 Dec 2020
27 Nov 2020
7 Dec 2020
27 Nov 2020
27 Nov 2020 - 1 Dec 2020
180 days
Amount
Installation, commissioning, testing, et
Installation of Water cooled type chilli
Installation of Chilled water pump 110 C
Installation of Condensor water pump 135
Assembly and Installation of Induced dra
Expansion Tank fo 1 Cum capacity and com
Pipe laying 50nb to 65nb with Insulation
Pipe layin100nb to 200nb with Insulation
Pipe laying 250NB to 300nb W/o Insulatio
Motorised Butterfly Valve with Actuator
Gate valves of 50nb,150nb,250nb
250 NB &150NB Y -Strainer
Check valves 150nb,200nb
Globe valves 150nb & 200nb
65 NB Balancing valve
65 NB 3- way Mixing Valve with Actuator.
50 NB Float valve
Fresh Air Fan, Grouting Frame , Cowl wit
installation of instruments
Commissioning of system as whole.
Amount Linked to Safety compliance
ACHAL ENGINEERING WORKS
ADITYA ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .